June 2002 Monthly Operating Report for Nine Mile Point Unit 2
ML022120203
Person / Time
Site: Nine Mile Point 
Issue date: 07/17/2002
From: Peckham M
Constellation Generation Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP2L 2067
Download: ML022120203 (5)


Text

P.O. Box 63 Lycoming. New York 13093 Constellation Generation Group Nine Mile Point Nuclear Station July 17, 2002, NMP2L 2067 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 2 Docket No. 50-410 NPF-69

Subject:

Monthly Operating Report for June 2002 Gentlemen:

Submitted herewith is the Operating Data Report, the Unit Shutdowns, and Summary of Operating Experience for June, 2002.

Very truly yours, Michael F. Peckham Unit 2 Plant General Manager MFP/jm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Records Management

ATTACHMENT 1: NRC CORRESPONDENCE APPROVAL FORM Document AIM /0.2-sumniday Of OevpeC4

ý4-4;r,'/ec-I--1 Applicability:

Li Unit 1

References:

DER Prepared: "ThC,"q'kiS /0 ji.

Print Developmental Review El Ucensing El] Engineering D

Generation

[TUnit Name V

2E Site Due Date:

NCTS

T, T.

(,,

Signature Datw Sicinature A.

ae,.cIv

.C-,

El Other Technical/Safety Reviews Technical Review: El N/R Designees:

SORC:

El N/R SRAB:

El N/R Final Review El Engineering Manager El Generation:

El Tech Spec 6.5.2 (CTS)

QATR (ITS)

C.,

Czv*o ErVerification El Other

____0 (dze oý-

/,Ž Meeting No.:

Meeting No.:

Operations Manager Tech Support Manager Maintenance Manager El rttorey El Ucensing Manager 4

Plant Manager El Other El Proofreader Disposition FSAR Change:

NCTS Commitments:

Post Correspondence El N/R 0 N/R El N/R LDCR #

NCTS #'s El Completed per NLAP-RPR-01 on __

(date)

Page 17 NIP-IRG-01 Rev 17 M,

PC C, k 4'r O'S.,

NZW=

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT #2

SUMMARY

OF OPERATING EXPERIENCE Nine Mile Point Unit Two operated with a capacity factor (MDC) of 101.63% and an availability factor of 100% for the month of June 2002.

On June 22, 2001, at 0803 hours0.00929 days <br />0.223 hours <br />0.00133 weeks <br />3.055415e-4 months <br />, a planned power reduction was initiated to approximately 65% power for a control rod sequence exchange, rod SCRAM timing and turbine stop and control valve testing. Following satisfactory completion of these activities, full power operation was resumed on June 23, 2002 at 0405 hours0.00469 days <br />0.113 hours <br />6.696429e-4 weeks <br />1.541025e-4 months <br />.

There were no challenges to the safety relief valves during this reporting period.

OPERATING DATA REPORT DOCKET NO.

DATE:

COMPLETED BY:

TELEPHONE:

50-410 07/01/2002 T. P. McMahon (315) 349-4045 OPERATING STATUS Unit Name:

Reporting Period:

I Design Electrical Rating (MWe) 2 Maximum Dependable Capacity (Net MWe)

3. Number of Hours Reactor was Critical:
4. Hours Generator On-Line:
5. Reactor Reserve Shutdown Hours:
6. Net Electrical Energy Gen. (MWH)

Nine Mile Point Unit #2 June 2002 1,143.3 1,119.8 This Month 720.0 720.0 0.0 819,398.4 Yr-to-Date 3,619.2 3,567.1 0.0 4,042,391.9 Cummulative 98,822.5 95,948.0 0.0 100,100,724.6

UNIT SHUTDOWNS APPENDIX B REPORTING PERIOD - JUNE 2002 DOCKET NO: 50-410 UNIT NAME: NMP#2 DATE: 07/01/02 Prepared by: T. McMahon TELEPHONE: (315) 349-4045 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Exam F-Administrative G-Operational Error (Explain)

H-Other (Explain) 7 Method:

I-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other (Explain)