Constellation Energy-P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Station March 14, 2005 NMP1L 1936 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Nine Mile Point Unit 1 Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 License No. DPR-63 License No. NPF-69 Monthly Operating Report for February 2005 Gentlemen:
Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for February 2005 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.
Very ly yours, Timot
. O'Connor Plant mneral Manager TJO/RF/sac Attachments cc:
Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector
OPERATING DATA REPORT DOCKET NO.
50-220 UNIT NAME Nine Mile Point 1 DATE March 04, 2005 COMPLETED BY Bruce L Eastman TELEPHONE 315 349-2559 REPORTING PERIOD:
February 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 613.00 565.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 672.00 672.00 0.00 415,356.00 Yr-to-Date 1,416.00 1,416.00 0.00 875,218.00 Cumulative 222,578.92 217,913.97 20.40 122,160,183.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- The unit operated during the month of February 2005 with a Net Electrical Design capacity factor of 100.8 percent.
I Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
1 Manual 2
Manual Trip/Scram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 2
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50410 Nine Mile Point 2 March 04, 2005.
T. P. McMahon 315-349-4045 D:
February 2005
- 1.
Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 18143.30 1,119.80
- 3.
Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5. Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month 672.00 672.00 0.00 775,073.01 Yr-to-Date 1,416.00 1,416.00 0.00 1,633,974.01 Cumulative 120,506.72 117,509.82 0.00 124,320,156.6 UNIT SHUTDOWNS Type Method of N F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- Nine Mile Point Unit Two operated with a capacity factor (MDC) of 103.00% and an availability factor of 100% for the month of February 2005.
There were no challenges to the safety relief valves during this reporting period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 2 of 2