February 2005 Monthly Operating Report for Nine Mile Point Units 1 & 2
ML050810587
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/14/2005
From: O'Connor T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1936
Download: ML050810587 (3)


Text

.-.

Constellation Energy-P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Station March 14, 2005 NMP1L 1936 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nine Mile Point Unit 1 Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 License No. DPR-63 License No. NPF-69 Monthly Operating Report for February 2005 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for February 2005 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

Very ly yours, Timot

. O'Connor Plant mneral Manager TJO/RF/sac Attachments cc:

Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO.

50-220 UNIT NAME Nine Mile Point 1 DATE March 04, 2005 COMPLETED BY Bruce L Eastman TELEPHONE 315 349-2559 REPORTING PERIOD:

February 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 613.00 565.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 672.00 672.00 0.00 415,356.00 Yr-to-Date 1,416.00 1,416.00 0.00 875,218.00 Cumulative 222,578.92 217,913.97 20.40 122,160,183.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

The unit operated during the month of February 2005 with a Net Electrical Design capacity factor of 100.8 percent.

I Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

1 Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 2

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50410 Nine Mile Point 2 March 04, 2005.

T. P. McMahon 315-349-4045 D:

February 2005

1.

Design Electrical Rating

2. Maximum Dependable Capacity (MWe-Net) 18143.30 1,119.80
3.

Number of Hours the Reactor was Critical

4. Number of Hours Generator On-line
5. Reserve Shutdown Hours
6.

Net Electrical Energy Generated (MWHrs)

This Month 672.00 672.00 0.00 775,073.01 Yr-to-Date 1,416.00 1,416.00 0.00 1,633,974.01 Cumulative 120,506.72 117,509.82 0.00 124,320,156.6 UNIT SHUTDOWNS Type Method of N F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a capacity factor (MDC) of 103.00% and an availability factor of 100% for the month of February 2005.

There were no challenges to the safety relief valves during this reporting period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 2 of 2