February 2005 Monthly Operating Report for Nine Mile Point Units 1 & 2
ML050810587
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 03/14/2005
From: O'Connor T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1936
Download: ML050810587 (3)


Text

.-.

Constellation Energy- P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Station March 14, 2005 NMP1L 1936 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Nine Mile Point Unit 1 Nine Mile Point Unit 2 Docket No. 50-220 Docket No. 50-410 License No. DPR-63 License No. NPF-69 Monthly Operating Report for February 2005 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for February 2005 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

Very ly yours, Timot . O'Connor Plant mneral Manager TJO/RF/sac Attachments cc: Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO. 50-220 UNIT NAME Nine Mile Point 1 DATE March 04, 2005 COMPLETED BY Bruce L Eastman TELEPHONE 315 349-2559 REPORTING PERIOD: February 2005

1. Design Electrical Rating 613.00
2. Maximum Dependable Capacity (MWe-Net) 565.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 672.00 1,416.00 222,578.92
4. Number of Hours Generator On-line 672.00 1,416.00 217,913.97
5. Reserve Shutdown Hours 0.00 0.00 20.40
6. Net Electrical Energy Generated (MWHrs) 415,356.00 875,218.00 122,160,183.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

The unit operated during the month of February 2005 with a Net Electrical Design capacity factor of 100.8 percent.

I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic TriplScram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 2

OPERATING DATA REPORT DOCKET NO. 50410 UNIT NAME Nine Mile Point 2 DATE March 04, 2005.

COMPLETED BY T. P. McMahon TELEPHONE 315-349-4045 REPORTING PERIO D: February 2005

1. Design Electrical Rating 18143.30
2. Maximum Dependable Capacity (MWe-Net) 1,119.80 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 672.00 1,416.00 120,506.72
4. Number of Hours Generator On-line 672.00 1,416.00 117,509.82
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 775,073.01 1,633,974.01 124,320,156.6 UNIT SHUTDOWNS Type Method of N F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a capacity factor (MDC) of 103.00% and an availability factor of 100% for the month of February 2005. There were no challenges to the safety relief valves during this reporting period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 2 of 2