August 2004 Monthly Operating Report for Nine Mile Point Unit 1 & 2
ML042670254
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/08/2004
From: O'Connor T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1866
Download: ML042670254 (3)


Text

@ Constellation Energy Nine Mile Point Nuclear Station RO. Box 63 Lycoming, New York 13093 September 8, 2004 NMP1L 1866 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Nine Mile Point Unit 1 Docket No. 50-220 License No. DPR-63 Nine Mile Point Unit 2 Docket No.50-410-License No. NPF-69 Monthly Operating Report for August 2004 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for August 2004 for the Nine Mile Point Nuclear Station Unit 1 and Unit 2.

o Very t ly your imo'CO'Connor Plant eneral Manager TJO/TM/jm Attachments c

Mr-S.-G.-C K. Iinegs, NRC Reniora Rdeinspectonr I

Mr. G. K. Hunegs, NRC Senior Resident Inspector

OPERATING DATA REPORT DOCKET NO.

50-220 UNIT NAME Nine Mile Point 1 DATE September 02, 2004 COMPLETED BY Bruce L Eastman TELEPHONE (315) 349-2559 REPORTING PERIOD:

August 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 613.00 565.00 3.

4.

5.

9-_6.

This Month Yr-to-Date Cumulative Number of Hours the Reactor was Critical 704.58 5,442.79 218,274.39 Number of Hours Generator On-line 704.58 5,384.37 213,622.07 Reserve Shutdown Hours 0.00 0.00 20.40 Net Electrical EnergyGenerated (MWHrs) -

412.953.00 _- 3,236.537.00- 119,533,292.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments 3

08/30/2004 F

39.42 A

2 Due to oscillations on 13 Feedwater Flow Control valve a manual scram was inserted to shut the unit down. Repairs to 13 Feedwater Flow Control Valve are in process.

SUMMARY

The unit operated during the month of August 2004 with a Net Electrical Design capacity factor of 90.5 percent. On August 21, 2004 at 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> power was reduced to less than 90 percent to remove 14 Reactor Recirculation Pump from service for Motor Generator (MG) Set brush replacement. At 0345 hours0.00399 days <br />0.0958 hours <br />5.704365e-4 weeks <br />1.312725e-4 months <br /> 14 Reactor Recirculation Pump was started and power was restored to rated. On August 30, 2004 at 0825 hours0.00955 days <br />0.229 hours <br />0.00136 weeks <br />3.139125e-4 months <br /> oscillations on 13 Feedwater Flow Control Valve were noted. At 0835 hours0.00966 days <br />0.232 hours <br />0.00138 weeks <br />3.177175e-4 months <br /> a manual scram was inserted. The unit remains in a forced outage at the closure of the month.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test

- -C-Rfuelinli D. Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram

--3,AutomatIc Trip/Scram~

4 Continuation 5

Other (Explain)

Page 1 of 2

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-410 Nine Mile Point ;

September 02, 2004 T. P. McMahon. :

(315) 349-4045 August 2004

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 1,i43.30 1,119.80 This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was Critical 744.00 4,902.72 116,161.72
4.

Number of Hours Generator On-line 744.00 4,859.92 113,164.82

5. Reserve Shutdown Hours 0.00 0.00 0.00
6..Net Electrical Energy Generated (MWHrs) _

839,749.50 -5,394,945.16-

_119,437,649.8-UNIT SHUTDOWNS Type Method of F: Forced Duration Reason Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Down 2 Comments

SUMMARY

Nine Mile Point Unit Two operated with a maximum dependable capacity (MDC) factor of 100.79% and an availability factor of 100% for the month of August,2004. On August 2, 2004 at 1703 hours0.0197 days <br />0.473 hours <br />0.00282 weeks <br />6.479915e-4 months <br /> uninterruptible power supply 2VBA* UPS2B was declared inoperable. At 1930 hours0.0223 days <br />0.536 hours <br />0.00319 weeks <br />7.34365e-4 months <br /> on August 3, 2004 Operations commenced a plant shutdown required by Technical Specification 3.8.7 action B. At 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> on August 4, 2004, 2VBA*UPS2B was declared operable, Technical Specification 3.8.7 was exited and power ascension from 40% commenced. The unit was brought back to full power at 0909 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.458745e-4 months <br /> on August 4, 2004. There were no challenges to the safety relief valves during this reporting period.

1 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)_

He OtherT(Expliain) 2 Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)