ML023600319

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Nine Mile Point, Unit 1
ML023600319
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/12/2002
From: Hopkins L
Constellation Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1701
Download: ML023600319 (4)


Text

P0 Box 63 Lycoming, New York 13093 0 Constellation Nuclear Nine Mile Point Nuclear Station December 12, 2002 A Member of the ConstellationEnergy Group NMP 1L 1701 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 Monthly Operating Report for November 2002 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for November 2002 for the Nine Mile Point Nuclear Station Unit 1.

Submittal of this information complies with Section 6.9.1.c of the Unit 1 Technical Specifications.

Very truly yours, Lawrence A.Hopkins Plant General Manager LAH/BE/jm Attachments cc: Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 12/04/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 OPERATING STATUS Unit Name: Nine Mile Point Unit #1 Reporting Period: November 2002 Design Electrical Rating: (Net MWe) 613 Maximum Dependable Capacity: (Net MWe) 565 This Month Yr-to-Date Cumulative 720.0 7,945.7 204,967.8 3 Critical Hours 720.0 7,913.0 200,581.2 4 Hours Generator On-Line 0.0 0.0 20.4 5 Unit Reserve Shutdown Hours 439,960.0 4,743,468.0 111,774,287.0 6 Net Electrical Energy Generated (MWH)

ATTACHMENT B UNIT SHUTDOWNS REPORTING PERIOD - NOVEMBER 2002 DOCKET NO: 50-22q, UNIT NAME: NMP 1 DATE: 12/04/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 TYPE NO.* DATE F: FORCED DURATION REASONS' METHOD OF SHUTTING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED (HOURS) DOWN 2 COMMENTS No shutdown occurred in November 2002 (1) Reason (2) Method A. Equipment Failure (Explain) 1. Manual B. Maintenance or Test 2. Manual Trip/Scram C. Refueling 3. Automatic Trip/Scram D Regulatory Restriction 4. Continuation E. Operator TraininglLicense Examination 5. Other (Explain)

F. Administrative G Operational Error (Explain)

H. Other (Explain)

  • NOTE: Sequential numbering used

ATTACHMENT C NARRATIVE OF OPERATING EXPERIENCE DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 12/04/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 The unit operated during the month of November 2002 with a Net Electrical Design capacity factor of 99.7 percent. There were no challenges to the electromatic relief valves or safety valves during the operating period.