September 2002 Monthly Operating Report for Nine Mile Point Unit 1
ML022960341
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/09/2002
From: Hopkins L
Constellation Generation Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1691
Download: ML022960341 (4)


Text

I P.O. Box 63 Lycoming, New York 13093 l Constellation Generation GroLp Nine Mile Point Nuclear Station October 9, 2002 NMP1L 1691 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 Monthly Operating Report for September 2002 Gentlemen:

Submitted herewith are the Operating Data Report, Unit Shutdowns, and a Narrative of Operating Experience for September 2002 for the Nine Mile Point Nuclear Station Unit

1. Submittal of this information complies with Section 6.9.1.c of the Unit 1 Technical Specifications.

Very truly yours,

/AA~

Lawrence A. Hopkins Plant General Manager LAH/BE/jm Attachments cc:

Mr. H. J. Miller, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector

-,

8

ATTACHMENT A OPERATING DATA REPORT DOCKET NO: 50-220 DATE: 10/02/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 OPERATING STATUS Unit Name: Nine Mile Point Unit #1 Reporting Period: September 2002 Design Electrical Rating: (Net MWe)

Maximum Dependable Capacity: (Net MWe) 613 565 Critical Hours Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)

This Month 720.0 720.0 0.0 429,619.0 Yr-to-Date 6,480.7 6,448.0 0.0 3,856,230.0 Cumulative 203,502.8 199,116.2 20.4 110,887,049.0 3

4 5

6

ATI'ACHMENT B UNIT SHUTDOWNS REPORTING PERIOD - SEPTEMBER 2002 (1)

Reason A.

Equipment Failure (Explain)

B.

Maintenance or Test C.

Refueling D.

Regulatory Restriction E.

Operator Training/License Examination F

Administrative G.

Operational Error (Explain)

H.

Other (Explain)

  • NOTE: Sequential numbering used.

I.

DOCKET NO: 50-220 UNIT NAME: NMP?

DATE: 10/02/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 (2)

Method

1.

Manual

2.

Manual Trip/Scram

3.

Automatic Trip/Scram

4.

Continuation 5

Other (Explain)

TYPE NO.*

DATE F: FORCED DURATION REASONS[

METHOD OF SHUTTING CAUSE & CORRECTIVE ACTIONS S: SCHEDULED (HOURS)

DOWN 2 COMMENTS No shutdown occurred in September 2002

ATTACHMENT C NARRATIVE OF OPERATING EXPERfIENCE DOCKET NO: 50-220 UNIT NAME: NMP1 DATE: 10/02/02 PREPARED BY: P. E. Netusil TELEPHONE: (315) 349-7935 The unit operated during the month of September 2002 with a Net Electrical Design capacity factor of 97.3 percent. Net Electrical Design capacity was reduced slightly due to elevated lake temperature, which reduced plant efficiency. There were no challenges to the electromatic relief valves or safety valves during the operating period.