Annual Assessment Letter (NRC Inspection Report 05000400/2008001)
ML080630523
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/03/2008
From: Randy Musser
NRC/RGN-II/DRP/RPB4
To: Duncan R
Carolina Power & Light Co
References
IR-08-001
Download: ML080630523 (8)


Text

rch 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - SHEARON HARRIS NUCLEAR POWER PLANT (NRC INSPECTION REPORT 05000400/2008001)

Dear Mr. Duncan:

On February 06, 2008, the NRC technical staff completed its performance review of the Shearon Harris Power Plant for the period from January 1 through December 31, 2007. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include security information.

A separate letter designated and marked as Official Use Only - Security-Related Information will include the security cornerstone review and a resultant inspection plan.

Overall, Shearon Harris operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for Shearon Harris Unit 1 for the most recent quarter, as well as the first three quarters of the assessment cycle, was in the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting several non-ROP inspections which include operator licensing, and Temporary Instructions 171 (B.5.b) and 172 (Reactor Coolant System Dissimilar Metal Butt Welds).

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2009. The inspection plan is provided to minimize the resource impact on your staff and to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review meeting.

CPL 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (404) 562-4603 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: NPF-63 Enclosure: Harris Inspection/Activity Plan cc w/encl: (See page 3)

_________________________

OFFICE RII:DRP RII:DRP SIGNATURE RAM GJW NAME RMusser GWilson DATE 03/03/2008 02/27/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

CPL 3 Chris L. Burton, Manager Performance Evaluation and Beverly Hall, Chief, Radiation Regulatory Affairs CPB 9 Protection Section Carolina Power & Light Company N. C. Department of Environmental Electronic Mail Distribution Commerce & Natural Resources Electronic Mail Distribution Robert II Director of Site Operations Public Service Commission Carolina Power & Light Company State of South Carolina Shearon Harris Nuclear Power Plant P. O. Box 11649 Electronic Mail Distribution Columbia, SC 29211 Eric McCartney Chairman of the North Carolina Plant General Manager--Harris Plant Utilities Commission Progress Energy Carolinas, Inc. c/o Sam Watson, Staff Attorney Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution Robert P. Gruber J. Wayne Gurganious Executive Director Training Manager-Harris Plant Public Staff NCUC Progress Energy Carolinas, Inc. 4326 Mail Service Center Harris Energy & Environmental Center Raleigh, NC 27699-4326 Electronic Mail Distribution Herb Council, Chair Christos Kamilaris, Manager Board of County Commissioners Support Services of Wake County Carolina Power & Light Company P. O. Box 550 Shearon Harris Nuclear Power Plant Raleigh, NC 27602 Electronic Mail Distribution Tommy Emerson, Chair David H. Corlett, Supervisor Board of County Commissioners Licensing/Regulatory Programs of Chatham County Carolina Power & Light Company Electronic Mail Distribution Shearon Harris Nuclear Power Plant Electronic Mail Distribution David T. Conley Associate General Counsel - Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128

CPL 4 Report to R. from Randall A. Musser dated March 3, 2008, SUBJECT: ANNUAL ASSESSMENT LETTER - SHEARON HARRIS NUCLEAR POWER PLANT (NRC INSPECTION REPORT 05000400/2008001)

C. Patel, NRR C. Evans, RII L. Slack, RII RIDSNRRDIRS ROP Reports INPO OE Mail RIDSNRRDIRS PUBLIC

Page 1 of 2 Harris 03/03/2008 15:28:06 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM 3 1 V23296 HARRIS/MARCH 2008 EXAM AT POWER FACILITIES 03/10/2008 03/14/2008 Not Applicable EB1-CDBI - COMPONENT DESIGN BASIS INSPECTION 8 1 IP 7111121 Component Design Bases Inspection 03/31/2008 04/04/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 04/14/2008 04/18/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 04/28/2008 05/02/2008 Baseline Inspections 1 IP 7111121 Component Design Bases Inspection 05/12/2008 05/16/2008 Baseline Inspections PSB1-EP - EP INSP 1 1 IP 7111402 Alert and Notification System Testing 04/07/2008 04/11/2008 EP Baseline Inspection 1 IP 7111403 Emergency Response Organization Augmentation Testing 04/07/2008 04/11/2008 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 04/07/2008 04/11/2008 EP Baseline Inspection 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 04/07/2008 04/11/2008 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance 04/07/2008 04/11/2008 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 04/07/2008 04/11/2008 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 04/07/2008 04/11/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 3 1 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/02/2008 06/06/2008 Generic Safety Inspectio EB3TI172 - TI-172 2 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 07/14/2008 07/18/2008 Generic Safety Inspectio PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 07/21/2008 07/23/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 4 1 IP 7112101 Access Control to Radiologically Significant Areas 08/25/2008 08/29/2008 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/25/2008 08/29/2008 Baseline Inspections 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 08/25/2008 08/29/2008 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 08/25/2008 08/29/2008 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 08/25/2008 08/29/2008 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 08/25/2008 08/29/2008 Baseline Inspections EB2-TFP - TRIENNIAL FIRE PROTECTION 9 1 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 09/22/2008 09/26/2008 Baseline Inspections 1 IP 7111105P Fire Protection-NFPA 805 Transition Period [Triennial] 10/06/2008 10/10/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 4 1 V23298 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 02/09/2009 02/13/2009 Not Applicable PSB1-RP - RADIATION PROTECTION PREINSPECTION VISIT 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/23/2009 02/25/2009 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 Harris 03/03/2008 15:28:06 Inspection / Activity Plan Report 22 03/03/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM WEEK 1 4 1 V23298 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/02/2009 03/06/2009 Not Applicable PSB1EP - EP EXERCISE 3 1 IP 7111401 Exercise Evaluation 03/02/2009 03/06/2009 EP Baseline Inspection 1 IP 7111404 Emergency Action Level and Emergency Plan Changes 03/02/2009 03/06/2009 EP Baseline Inspection 1 IP 71151-EP01 Drill/Exercise Performance 03/02/2009 03/06/2009 Baseline Inspections 1 IP 71151-EP02 ERO Drill Participation 03/02/2009 03/06/2009 Baseline Inspections 1 IP 71151-EP03 Alert & Notification System 03/02/2009 03/06/2009 Baseline Inspections OL EXAM - INITIAL EXAM WEEK 2 2 1 V23298 HARRIS/MARCH 2009 EXAM AT POWER FACILITIES 03/16/2009 03/20/2009 Not Applicable OL RQ - REQUAL INSPECTION 2 1 IP 7111111B Licensed Operator Requalification Program 03/30/2009 04/03/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1 2 1 IP 7112101 Access Control to Radiologically Significant Areas 04/06/2009 04/10/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/06/2009 04/10/2009 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/06/2009 04/10/2009 Baseline Inspections 1 IP 71151-OR01 Occupational Exposure Control Effectiveness 04/06/2009 04/10/2009 Baseline Inspections 1 IP 71151-PR01 RETS/ODCM Radiological Effluent 04/06/2009 04/10/2009 Baseline Inspections EB3ISI - ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 04/13/2009 04/17/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1 IP 7112101 Access Control to Radiologically Significant Areas 04/20/2009 04/24/2009 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 04/20/2009 04/24/2009 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 04/20/2009 04/24/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.