UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 4, 2012 Mr. George T. Hamrick Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT (NRC INSPECTION REPORT 05000400/2012006)

Dear Mr. Hamrick:

On August 15, 2012, the NRC staff completed its mid-cycle performance review of the Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2011, through June 30, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2013.

Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, consistent with the Agencys actions related to Fukushima, the NRC will perform TI-187, Inspection of Near-Term Task Force Recommendation 2.3 Flooding Walkdowns and TI-188 Inspection of Near-Term Task Force Recommendation 2.3 Seismic Walkdowns. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

G. Hamrick 2 We also plan on conducting several infrequently performed inspections which include: Licensed Operator Requalification, Operator Licensing Exams, and TI 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4603 with any questions you may have regarding this letter.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 50-400 License No. NPF-63

Enclosure:

Harris Inspection/Activity Plan (09/01/2012 - 12/31/2013) cc w/Encl: (See page 3)

_________________________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE JGW /RA/ JSD /RA/ RAM /RA/

NAME JWorosilo JDodson RMusser DATE 08/21/2012 08/27/2012 08/30/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO G. Hamrick 3 cc w/encl: David H. Corlett Brian Bernard Supervisor Manager, Nuclear Services and EP Licensing/Regulatory Programs Nuclear Protective Services Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution David T. Conley Brian C. McCabe Senior Counsel Manager, Nuclear Oversight Legal Department Shearon Harris Nuclear Power Plant Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Donna B. Alexander George T. Hamrick Manager, Nuclear Regulatory Affairs Vice President (interim)

Carolina Power and Light Company Progress Energy Shearon Harris Nuclear Power Plant Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr.

Lara S. Nichols Shaw, Pittman, Potts & Trowbridge Deputy General Counsel 2300 N. Street, NW Duke Energy Corporation Washington, DC 20037-1128 Electronic Mail Distribution Joseph W. Donahue M. Christopher Nolan Vice President Director - Regulatory Affairs Nuclear Oversight Duke Energy Carolinas, LLC Progress Energy Electronic Mail Distribution Electronic Mail Distribution Robert J. Duncan II W. Lee Cox, III Senior Vice President Section Chief Progress Energy Radiation Protection Section Electronic Mail Distribution N.C. Department of Environmental Commerce & Natural Resources Sean T. O'Connor Electronic Mail Distribution Manager, Support Services Shearon Harris Nuclear Power Plant Public Service Commission Electronic Mail Distribution State of South Carolina P.O. Box 11649 Donald L. Griffith Columbia, SC 29211 Training Manager Shearon Harris Nuclear Power Plant Chairman Progress Energy North Carolina Utilities Commission Electronic Mail Distribution Electronic Mail Distribution R. Keith Holbrook (cc w/encl continued next page)

Manager, Support Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution

G. Hamrick 4 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312

G. Hamrick 5 Letter to George T. Hamrick from Randall A. Musser dated September 4, 2012

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT (NRC INSPECTION REPORT 05000400/2012006)

Distribution w/encl:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource INPO ROP Reports

Page 1 of 1 Harris 09/04/2012 08:17:54 Inspection / Activity Plan Report 22 09/01/2012 - 12/31/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site OL RQ - REQUAL INSPECTION 2 1 01/21/2013 01/25/2013 IP 7111111B Licensed Operator Requalification Program MODS - PERM MODS 50.59 INSPECTION 3 1 01/28/2013 02/01/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 02/11/2013 02/15/2013 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EP - MERGENCY PREPAREDNESS EXERCISE 1 1 04/29/2013 05/03/2013 IP 7111401 Exercise Evaluation 1 04/29/2013 05/03/2013 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1 06/10/2013 06/14/2013 IP 7111107T Heat Sink Performance PSB1-RP - RP PUBLIC RAD SAFETY BASELINE 2 1 06/17/2013 06/21/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 06/17/2013 06/21/2013 IP 71124.07 Radiological Environmental Monitoring Program 1 06/17/2013 06/21/2013 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 08/05/2013 08/09/2013 IP 71152B Problem Identification and Resolution 1 08/19/2013 08/23/2013 IP 71152B Problem Identification and Resolution OL EXAM - INITIAL EXAM PREP 3 1 08/12/2013 08/16/2013 V23403 HARRIS/SEPTEMBER 2012 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 1 3 1 09/02/2013 09/06/2013 V23403 HARRIS/SEPTEMBER 2012 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 2 3 1 09/09/2013 09/13/2013 V23403 HARRIS/SEPTEMBER 2012 INITIAL EXAM AT POWER FACILITIES PSB1-RP - RAD HAZARDS ANALYSIS AND TRANSPORTATION 3 1 11/04/2013 11/08/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/04/2013 11/08/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 11/04/2013 11/08/2013 IP 71151 Performance Indicator Verification ISI - UNIT 1 INSERVICE INSPECTION 1 1 11/11/2013 11/15/2013 IP 7111108P Inservice Inspection Activities - PWR SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 11/18/2013 11/22/2013 IP 7111108P Inservice Inspection Activities - PWR Comments:

This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.