IR 05000400/2015005

From kanterella
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2015005
ML15244B075
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/01/2015
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Waldrep B
Duke Energy Progress
References
IR 2015005
Download: ML15244B075 (6)


Text

UNITED STATES September 1, 2015

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2015005

Dear Mr. Waldrep:

On August 12, 2015, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2014, through June 30, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

The NRC determined that overall, Shearon Harris Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant, during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

We also plan on conducting the following infrequently performed inspection: Operator Licensing Initial Exams. Additionally, the triennial commitment management program audit is scheduled for October 2015. In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events. This Order requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. This Order requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. The audit was completed for the Shearon Harris Nuclear Power Plant, and the information gathered will aid staff in development of the ultimate Safety Evaluation for the site. After the NRC staff receives the Final Compliance letter for the site, the Final Safety Evaluation will be issued. Then, the NRC staff will confirm through inspections the full implementation of the orders mentioned above performing TI 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact George Hopper at (404) 997-4645 with any questions you may have regarding this letter.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-400 License Nos.: NPF-63 Enclosure:

Harris Inspection/Activity Plan (09/01/2015 - 06/30/2017)

cc: Distribution via ListServ

______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME DJackson JDodson GHopper DATE 8/28/2015 8/21/2015 8/31/2015 E-MAIL COPY? YES NO YES NO YES NO Letter to Benjamin from George T. Hopper dated September 1, 2015.

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2015005 DISTRIBUTION:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS RidsNrrPMShearonHarris Resource ROP Assessments ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Harris 09/01/2015 10:20:42 Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ASM EP - 2015 EP ASM & RES BASELINE 3 1 01/01/2015 12/31/2015 IP 7111406 Drill Evaluation PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 09/14/2015 09/18/2015 IP 71152B Problem Identification and Resolution 1 09/28/2015 10/02/2015 IP 71152B Problem Identification and Resolution EP - EP EXERCISE 8 1 10/26/2015 10/30/2015 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 10/26/2015 10/30/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1 10/26/2015 10/30/2015 IP 71151 Performance Indicator Verification MODS - PLANT MODIFICATIONS INSPECTION 4 1 11/16/2015 11/20/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 12/07/2015 12/11/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ASM EP - 2016 EP ASM & RES BASELINE 3 1 01/01/2016 12/31/2016 IP 7111406 Drill Evaluation EP - EP PROGRAM INSPECTION 2 1 05/23/2016 05/27/2016 IP 7111401 Exercise Evaluation 1 05/23/2016 05/27/2016 IP 7111402 Alert and Notification System Testing 1 05/23/2016 05/27/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/23/2016 05/27/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/23/2016 05/27/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 05/23/2016 05/27/2016 IP 71151 Performance Indicator Verification HS - TRIENNIAL HEAT SINK PERFORMANCE 1 1 06/13/2016 06/17/2016 IP 7111107T Heat Sink Performance OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/13/2016 06/17/2016 V23474 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS OL EXAM - INITIAL LICENSE EXAM 3 1 07/11/2016 07/22/2016 V23474 HARRIS JULY 2016 INITIAL EXAM AT POWER FACILITIESS ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 10/17/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1 10/17/2016 10/21/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/17/2016 10/21/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/17/2016 10/21/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Harris 09/01/2015 10:20:42 Inspection / Activity Plan Report 22 09/01/2015 - 06/30/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 1 3 1 10/17/2016 10/21/2016 IP 71124.04 Occupational Dose Assessment 1 10/17/2016 10/21/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 10/17/2016 10/21/2016 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL INSPECTION WEEK 2 2 1 10/31/2016 11/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/31/2016 11/04/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/31/2016 11/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/31/2016 11/04/2016 IP 71124.04 Occupational Dose Assessment 1 10/31/2016 11/04/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 10/31/2016 11/04/2016 IP 71151 Performance Indicator Verification CDBI - COMPONENT DESIGN BASIS INSPECTION 7 1 01/30/2017 02/03/2017 IP 7111121 Component Design Bases Inspection 1 02/27/2017 03/03/2017 IP 7111121 Component Design Bases Inspection 1 03/13/2017 03/17/2017 IP 7111121 Component Design Bases Inspection 1 03/27/2017 03/31/2017 IP 7111121 Component Design Bases Inspection EP - EP EXERCISE 6 1 04/24/2017 04/28/2017 IP 7111401 Exercise Evaluation 1 04/24/2017 04/28/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 04/24/2017 04/28/2017 IP 7111408 Exercise Evaluation - Scenario Review 1 04/24/2017 04/28/2017 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.