February 4, 2022

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - INTEGRATED INSPECTION REPORT 05000400/2021004

Dear Ms. Maza:

On December 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Shearon Harris Nuclear Power Plant. On January 26, 2022, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No. 05000400 License No. NPF-63

Enclosure:

As stated

Inspection Report

Docket Number:

05000400

License Number:

NPF-63

Report Number:

05000400/2021004

Enterprise Identifier:

I-2021-004-0014

Licensee:

Duke Energy Progress, LLC

Facility:

Shearon Harris Nuclear Power Plant

Location:

New Hill, NC 27562

Inspection Dates:

October 01, 2021 to December 31, 2021

Inspectors:

J. Zeiler, Senior Resident Inspector

C. Smith, Resident Inspector

M. Kennard, Senior Operations Engineer

N. Lacy, Operations Engineer

Approved By:

Stewart N. Bailey, Chief

Reactor Projects Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Shearon Harris Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 operated at or near rated thermal power for the entire inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated licensee readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures on November 15, 2021.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1)

'A' motor-driven auxiliary feedwater (MDAFW) pump and turbine-driven auxiliary feedwater (TDAFW) pump while 'B' MDAFW pump was out-of-service for surveillance on October 5, 2021 (2)1&4A and 2&3A spent fuel cooling pumps and associated heat exchangers while protected on November 5, 2021

(3) Motor driven fire pump while protected due to scheduled maintenance on the diesel driven fire pump on December 16, 2021.

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated system configurations during a complete walkdown of the essential services chilled water (ESCW) system on November 17 and 23, 2021.

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Reactor auxiliary building (RAB) 236' elevation area hot machine shop (fire zone 1-A-3-COMC) on October 8, 2021
(2) Fuel handling building (FHB) 236' elevation areas for spent fuel pool cooling pumps and heat exchangers (fire zones 5-F-2-FPC, 5-F-2-FPV1, and 5-F-2-FPV2) on November 3, 2021
(3) RAB 261' elevation areas for 'A' and 'B' ESCW chillers (fire zone 1-A-4-CHLR) on November 10, 2021
(4) RAB 216' elevation for east mechanical penetration area including containment spray additive tank and component cooling water drain tank and pumps (fire zone 1-A-2-MP) on November 30, 2021.

Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill on October 8, 2021.

71111.06 - Flood Protection Measures

Inspection Activities - Internal Flooding (IP Section 03.01) (1 Sample)

The inspectors evaluated internal flooding mitigation protections in the:

(1) Steam tunnel on November 9, 2021.

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The licensee completed the annual requalification operating examinations required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), "Requalification Requirements," of the NRC's "Operator's Licenses." During the week of November 22, 2021, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations and the crew simulator operating examinations in accordance with Inspection Procedure (IP) 71111.11, "Licensed Operator Requalification Program." These results were compared to the thresholds established in Section 3.03, "Requalification Examination Results," of IP 71111.11.

The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam completed on October 28, 2021.

71111.11B - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Program (IP Section 03.04) (1 Sample)

The inspectors reviewed the facility operating history and associated documents in preparation for this inspection. During the week of October 18 - 21, 2021, the inspectors reviewed documentation, interviewed licensee personnel, and observed the administration of operating tests associated with the licensees operator requalification program. Each of the activities performed by the inspectors was done to assess the effectiveness of the facility licensee in implementing requalification requirements identified in 10 CFR Part 55, Operators Licenses. The evaluations were also performed to determine if the licensee effectively implemented operator requalification guidelines established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, and Inspection Procedure

===71111.11, Licensed Operator Requalification Program. The inspectors also evaluated the licensees simulation facility for adequacy for use in operator licensing examinations using ANSI/ANS-3.5-2009, American National Standard for Nuclear Power Plant Simulators for use in Operator Training and Examination. The inspectors observed three crews during the performance of the operating tests. Documentation reviewed included written examinations, Job Performance Measures (JPMs), simulator scenarios, licensee procedures, on-shift records, simulator modification request records, simulator performance test records, operator feedback records, licensed operator qualification records, remediation plans, watchstanding records, and medical records. The records were inspected using the criteria listed in Inspection Procedure 71111.11.

(1) Biennial Requalification Written Examinations The inspectors evaluated the quality of the licensed operator biennial requalification written examination administered in 2020.

Annual Requalification Operating Tests The inspectors evaluated the adequacy of the facility licensees annual requalification operating test.

Administration of an Annual Requalification Operating Test The inspectors evaluated the effectiveness of the facility licensee in administering requalification operating tests required by 10 CFR 55.59(a)(2) and that the facility licensee is effectively evaluating their licensed operators for mastery of training objectives.

Requalification Examination Security The inspectors evaluated the ability of the facility licensee to safeguard examination material, such that the examination is not compromised.

Remedial Training and Re-examinations The inspectors evaluated the effectiveness of remedial training conducted by the licensee, and reviewed the adequacy of re-examinations for licensed operators who did not pass a required requalification examination.

Operator License Conditions The inspectors evaluated the licensees program for ensuring that licensed operators meet the conditions of their licenses.

Control Room Simulator The inspectors evaluated the adequacy of the facility licensees control room simulator in modeling the actual plant, and for meeting the requirements contained in 10 CFR 55.46.

Problem Identification and Resolution The inspectors evaluated the licensees ability to identify and resolve problems associated with licensed operator performance.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during performance of control rod exercising on November 2, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02)===

(1) The inspectors observed and evaluated a simulator scenario for an operator annual requalification examination involving a steam generator tube rupture without reactor coolant system pressure control on October 27, 2021.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1)

'B' ESCW chiller tripped on low compressor oil pressure (Nuclear Condition Report (NCR) 02403733) on November 1, 2021.

Quality Control (IP Section 03.02) (1 Sample)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

(1)

'B' emergency service water (ESW) booster pump motor breaker opened unexpectedly when securing the pump following successful surveillance testing (NCR

===02396682) on September 4, 2021.

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01)===

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Elevated (Green) risk during scheduled alternate seal injection (ASI) pump time delay relay replacement preventive maintenance on November 3, 2021
(2) Elevated (Green) risk during scheduled maintenance associated with 'B' containment spray pump chemical additive supply valve 1CT-11 on November 30, 2021
(3) Elevated (Green) risk during emergent problem with the 'C' charging and safety injection pump (CSIP) auxiliary bearing lube oil pump on December 3, 2021
(4) Elevated (Green) risk during emergent troubleshooting and repair of 'B' ESCW chiller following chiller chill water outlet temperature found high out of specification on December 13, 2021.

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1)

'A' component cooling water (CCW) pump breaker failed to open in test position from switch (NCR 02401267) on October 15, 2021 (2)

'B' ESCW chiller tripped on low compressor oil pressure (NCR 02403733) on November 1, 2021

(3) Incorrect application of rod worth uncertainty used in calculating shutdown margin due to vendor supplied software errors (NCR 02405318) on November 11, 2021 (4)

'C' CSIP auxiliary bearing lube oil pump excessive cycling on/off with the CSIP in operation (WO 20505888) on December 3, 2021 (5)1AF-131, flow control valve from TDAFW pump to 'C' steam generator, failed stroke open time during TDAFW pump quarterly testing (NCR 02409759) on December 17, 2021.

71111.18 - Plant Modifications

Severe Accident Management Guidelines (SAMG) Update (IP Section 03.03) (1 Sample)

(1) The inspectors verified the site Severe Accident Management Guidelines were updated in accordance with the pressurized water reactor (PWR) generic sever accident technical guidelines and validated in accordance with NEI 14-01, Emergency Response Procedures and Guidelines for Beyond Design Basis Events and Severe Accidents, Revision 1.

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Operation Surveillance Test (OST)-1216, Component Cooling Water System Operability (A-SA and B-SB Pumps in Service) Quarterly Interval Modes 1-4, following restoration of 'A' CCW pump tagout for deferred seal replacement maintenance on October 14, 2021
(2) Operations Periodic Test (OPT)-1532, ASI Squib Valves Fire Test 54 Month Interval Modes 1-4, following scheduled ASI squib valve time delay relay replacement on November 3, 2021
(3) OST-1840, Steam Generator Blowdown Sample Valve Position Indication Test 2 Year Interval Modes 1-4, following solenoid replacement on 'B' steam generator sample containment isolation valve 1SP-222 on November 9, 2021
(4) Operations Reliability Test (ORT)-1417, Normal Service Water Pump Performance Test, following scheduled maintenance on the 'A' normal service water pump on November 23, 2021
(5) OST-1119, Containment Spray Operability Train 'B' Quarterly Interval Modes 1-4, following motor operated valve preventive maintenance of chemical addition supply valve 1CT-11 on November 30, 2021
(6) Fire Protection Periodic Test (FPT)-3010, Engine Driven Main Fire Pump Functionality Test Monthly Interval Modes: ALL, following scheduled maintenance of the diesel driven fire pump on December 17, 2021
(7) OPT-1512, Essential Chilled Water Turbopak Units Quarterly Inspection/Checks Modes 1-6, following emergent repair of the 'B' ESCW chiller on December 17, 2021.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) OST-1005, Control Rod and Rod Position Indicator Exercise Quarterly Interval Modes 1-3, on November 2, 2021
(2) OST-1010A, 'A' Train Containment Cooling System Operability Test Monthly Interval Modes 1-4, on December 21, 2021.

Inservice Testing (IP Section 03.01) (1 Sample)

(1) OST-1211, Auxiliary Feedwater Pump 1A-SA Operability Test Quarterly Interval Modes 1-4, on November 16, 2021.

71114.06 - Drill Evaluation

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) A simulator-based licensed operator training evolution involving a steam generator tube rupture event on October 27,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 1 (October 2020 - September 2021)

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) Unit 1 (October 2020 - September 2021)

71152 - Problem Identification and Resolution (PI&R)

Semiannual Trend Review (IP Section 02.02) (1 Sample)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends in equipment and human performance that might be indicative of a more significant safety issue.

Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) Broken bolt on the air intake manifold for the 'A' emergency diesel generator (EDG)on September 18, 2021 (NCR 02398237).

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On January 26, 2022, the inspectors presented the Integrated Inspection results to Kim Maza and other members of the licensee staff.

On October 21, 2021, the inspectors presented the Licensed Operator Requalification Inspection results to Kim Maza and other members of the licensee staff.

THIRD PARTY REVIEWS Inspectors reviewed Institute on Nuclear Power Operations' reports that were issued during the inspection period.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Procedures

AP-301

Seasonal Weather Preparations and Monitoring

Rev. 87

71111.01

Self-Assessments Action Request

Cold weather assessment

5-S-0805

Simplified Flow Diagram Fuel Pools Cooling System Unit 1

014

5-S-0807

Simplified Flow Diagram Fuel Pools Cooling System Unit 2

009

5-S-0998 S02

SFD HVAC Essential Serv Chilled Water Cond Unit 1-SA

Rev. 029

Drawings

5-S-0999 S02

Simplified Flow Diagram HVAC - Essential Services Chilled

Water - Condenser Unit 1-SB

Rev. 032

71111.04

Procedures

OP-148

Essential Services Chilled Water System

Rev. 83

CSD-HNP-PFP-

FHB

Fuel Handling Building Pre-Fire Plan

Rev. 1

CSD-HNP-PFP-

RAB-190-216

Reactor Auxiliary Building Elevations 190 and 216 Pre-Fire

Plan

Rev. 1

CSD-HNP-PFP-

RAB-236

Reactor Auxiliary Building Elevation 236 Pre-Fire Plan

Rev. 2

Fire Plans

CSD-HNP-PFP-

RAB-261

Reactor Auxiliary Building Elevation 261 Pre-Fire Plan

Rev. 1

Miscellaneous

Fire Drill Scenario for RAB 236' Hot Machine Shop

10/6/2021

AD-EG-ALL-1520

Transient Combustible Control

Rev. 14

AD-OP-ALL-0207

Fire Brigade Administrative Controls

Rev. 4

FPP-001

Fire Protection Program Manual

Rev. 44

FPP-002

Fire Emergency

Rev. 46

FPP-013

Fire Protection - Minimum Requirements, Mitigating Actions

and Surveillance Requirements

Rev. 110

71111.05

Procedures

OMM-001

Operations Administrative Requirements

Rev. 124

PRA-F-E-0001

Steam Tunnel Volumes for Subcompartment Pressure

Analysis

Rev. 1

71111.06

Calculations

PRA-F-E-0002

Steam Tunnel Flooding Analysis

Rev. 5

Biennial Written Exam 2020 LOCT Week 1, SRO and RO

Medical Records for 5 licensed operators

71111.11B

Miscellaneous

Training Attendance records from Segment 19-03 through

21-04

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Remediation records for 19-05 BRE and 20-05 AOE

2019-2021 License Maintenance Hours spreadsheets

JPMs ADM-056, ADM-065, ADM-310, ADM-311, CR-038,

CR-310, IP-004, IP-167, IP-277, and IP-299

Simulator scenarios DSS-004 - MS Break, DSS-005 -

SBLOCA, DSS-027 - SBLOCA, DSS-038 - Loss of Heat Sink

Simulator Fidelity Testing records 2019-2021

AD-OP-ALL-0107

Maintenance of RO and SRO Licenses

Rev 2

AD-OP-ALL-1000

Conduct of Operations

Rev 15

AD-TQ-ALL-0068

Licensed Operator Continuing Training Program

Rev 11

AD-TQ-ALL-0101

Conduct of the Systematic Approach to Training

Rev 9

AD-TQ-ALL-0230

Licensed Operator Requalification Annual and Biennial

Exam Development

Rev 10

AD-TQ-ALL-0320

Development of Simulator Training and Evaluation Guides

Rev 8

AD-TQ-ALL-0420

Conduct of Simulator Training and Evaluation

Rev 18

AD-TQ-ALL-0425

Simulator Scenario Based Testing

AD-TQ-ALL-0430

Development and Administration of JPMs

Rev 3

Procedures

OMM-001

Operations Administrative Requirements

Rev 114

AD-OP-ALL-1000

Conduct of Operations

Rev. 18

AOP-010

Feedwater Malfunctions

Rev. 41

AOP-016

Excessive Primary Plant Leakage

Rev. 59

EOP-E-0

Reactor Trip or Safety Injection

Rev. 15

EOP-E-3

Steam Generator Tube Rupture

Rev. 7

EOP-ECA-3.3

SGTR Without Pressurizer Pressure Control

Rev. 5

71111.11Q

Procedures

OST-1005

Control Rod and Rod Position Indicator Exercise Quarterly

Interval Modes 1-3

Rev. 30

Corrective Action

Documents

NCR 02395229

Siemens refurbished RLN 480-volt breaker replacement

project issues

8/25/2021

Procedures

AD-EG-ALL-1210

Maintenance Rule Program

Rev. 3

WO 20384614

Preventive maintenance replacement of 'B' ESW booster

pump motor breaker on September 1, 2021

9/1/2021

71111.12

Work Orders

WO 20490618

Troubleshoot/repair 'B' ESW booster pump loss of breaker

indication

9/4/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

WO 20499764

Troubleshoot/repair 'B' ESCW chiller trip on low compressor

oil pressure

11/1/2021

AD-NF-ALL-0501

Electronic Risk Assessment Tool (ERAT)

Rev. 5

AD-WC-ALL-

240

On-Line Risk Management Process

Rev. 3

AD-WC-ALL-

0410

Work Activity Integrated Risk Management

Rev. 12

Procedures

AD-WC-ALL-200

On-line Risk Management

Rev. 20

WO 20053823

MOV preventive maintenance on spray additive tank supply

valve 1CT-11

11/30/2021

WO 20449858

Replace ASI squib valve time delay relay

11/3/2021

WO 20508170

Troubleshooting 'B' ESCW chiller chill water outlet high

temperature

2/13/2021

71111.13

Work Orders

WOs 20505888

Adjust lube oil relief valve setting and calibrate pressure

switch on 'C' CSIP

2/3/2021

71111.15

Procedures

AD-OP-ALL-0105

Operability Determinations

Rev. 6

FPT-3010

Engine Driven Main Fire Pump Functionality Test Monthly

Interval Modes: All

Rev. 19

ORT-1402

Normal Service Water Pump Functionality Test

Rev. 11

Procedures

ORT-1417

Normal Service Water Pump Performance Test

Rev. 0

WO 20499018

Replace solenoid on 'B' steam generator sample valve 1SP-

2

11/9/2021

WO 20499764

Troubleshoot 'B' ESCW chiller trip on compressor low oil

pressure

11/1/2021

71111.19

Work Orders

WO 20508170

Troubleshoot/repair 'B' ESCW chiller high chill water

temperature

2/14/2021

Drawings

CPL-2165-S-

0544

Simplified Flow Diagram Feedwater System - Unit 1

Rev. 46

71111.22

Procedures

OST-1211

Auxiliary Feedwater Pump 1A-SA Operability Test Quarterly

Interval Modes 1-4

Rev. 27

Miscellaneous

Operator Log Entries between 2020 - 2021

71151

Procedures

AD-PI-ALL-0700

Performance Indicators

Rev. 4

71152

Engineering

Changes

EC 000420166

A EDG Intake Bolt Broken

Rev. 0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AD-PI-ALL-0100

Corrective Action Program

Rev. 25

Procedures

AD-PI-ALL-0106

Cause Investigation Checklists

Rev. 6