Report 22, Inspection/Activity Plan, 09/01/2011 - 12/31/2012
ML112440132
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/01/2011
From:
Division Reactor Projects II
To:
Shared Package
ML112440125 List:
References
IR-11-006
Download: ML112440132 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2011 06:32:13 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris TFPI

- 805 TFPI 8

1 IP Fire Protection - NFPA 805 (Triennial) 7111105x 08/29/2011 09/02/2011 1

IP Fire Protection - NFPA 805 (Triennial) 7111105x 09/19/2011 09/23/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 5

1 IP Exercise Evaluation 7111401 11/28/2011 12/02/2011 1

IP Emergency Action Level and Emergency Plan Changes 7111404 11/28/2011 12/02/2011 1

IP Performance Indicator Verification 71151 11/28/2011 12/02/2011 PSB1-RP

- BASELINE RP OCCUPATIONAL INSPECTION 3

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 12/05/2011 12/09/2011 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 12/05/2011 12/09/2011 1

IP Occupational Dose Assessment 71124.04 12/05/2011 12/09/2011 OL EXAM

- INITIAL EXAM PREP 3

1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 01/23/2012 01/27/2012 OL EXAM

- INITIAL EXAM - WEEK 1 3

1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 02/13/2012 02/17/2012 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 02/20/2012 02/24/2012 EB3 ISI

- UNIT 1 INSERVICE INSPECTION & RPVH EXAMS 2

1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2012 05/04/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 4

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/30/2012 05/04/2012 1

IP Occupational ALARA Planning and Controls 71124.02 04/30/2012 05/04/2012 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/30/2012 05/04/2012 1

IP Occupational Dose Assessment 71124.04 04/30/2012 05/04/2012 1

IP Radiation Monitoring Instrumentation 71124.05 04/30/2012 05/04/2012 1

IP Performance Indicator Verification 71151 04/30/2012 05/04/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 4

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2012 05/18/2012 1

IP Occupational ALARA Planning and Controls 71124.02 05/14/2012 05/18/2012 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/14/2012 05/18/2012 1

IP Occupational Dose Assessment 71124.04 05/14/2012 05/18/2012 1

IP Radiation Monitoring Instrumentation 71124.05 05/14/2012 05/18/2012 1

IP Performance Indicator Verification 71151 05/14/2012 05/18/2012 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1 IP Alert and Notification System Testing 7111402 08/20/2012 08/24/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 09/01/2011 06:32:13 Report 22 09/01/2011 - 12/31/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 1

1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/20/2012 08/24/2012 1

IP Emergency Action Level and Emergency Plan Changes 7111404 08/20/2012 08/24/2012 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/20/2012 08/24/2012 1

IP Performance Indicator Verification 71151 08/20/2012 08/24/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.