Text

Inspection / Activity Plan Page 1 of 2 03/04/2011 09:02:47 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris CDBI

- COMPONENT DESIGN BASES INSPECTION 7

1 IP Component Design Bases Inspection 7111121 02/28/2011 03/03/2011 1

IP Component Design Bases Inspection 7111121 03/21/2011 03/25/2011 1

IP Component Design Bases Inspection 7111121 04/04/2011 04/08/2011 1

IP Component Design Bases Inspection 7111121 04/18/2011 04/22/2011 OL RQ

- REQUAL INSPECTION 3

1 IP Licensed Operator Requalification Program 7111111B 03/21/2011 03/25/2011 EB1/DRS

- TI-177 GAS ACCUMULATION 3

1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/28/2011 04/01/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 2

1 IP Exercise Evaluation 7111401 04/25/2011 04/29/2011 1

IP Emergency Action Level and Emergency Plan Changes 7111404 04/25/2011 04/29/2011 1

IP Performance Indicator Verification 71151 04/25/2011 04/29/2011 OL EXAM

- INITIAL EXAM PREP 4

1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 06/20/2011 06/24/2011 OL EXAM

- INITIAL EXAM - WEEK 1 4

1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 07/11/2011 07/15/2011 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION 5

1 IP Identification and Resolution of Problems 71152B 07/11/2011 07/15/2011 1

IP Identification and Resolution of Problems 71152B 07/25/2011 07/29/2011 OL EXAM

- INITIAL EXAM - WEEK 2 4

1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 07/18/2011 07/22/2011 PSB1-RP

- RP PUBLIC RADIATION PROTECTION INSP 6

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/08/2011 08/12/2011 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/08/2011 08/12/2011 1

IP Occupational Dose Assessment 71124.04 08/08/2011 08/12/2011 1

IP Radiation Monitoring Instrumentation 71124.05 08/08/2011 08/12/2011 1

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/08/2011 08/12/2011 1

IP Radiological Environmental Monitoring Program 71124.07 08/08/2011 08/12/2011 1

IP Performance Indicator Verification 71151 08/08/2011 08/12/2011 TFPI

- 805 TFPI 7

1 IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 08/29/2011 09/02/2011 1

IP Fire Protection-NFPA 805 Transition Period [Triennial]

7111105P 09/12/2011 09/16/2011 OL EXAM

- INITIAL EXAM PREP 3

1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 01/23/2012 01/27/2012 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 03/04/2011 09:02:47 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris OL EXAM

- INITIAL EXAM - WEEK 1 3

1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 02/13/2012 02/17/2012 OL EXAM

- INITIAL EXAM - WEEK 2 3

1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 02/20/2012 02/24/2012 EB3 ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2012 05/04/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 4

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/30/2012 05/04/2012 1

IP Occupational ALARA Planning and Controls 71124.02 04/30/2012 05/04/2012 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/30/2012 05/04/2012 1

IP Occupational Dose Assessment 71124.04 04/30/2012 05/04/2012 1

IP Performance Indicator Verification 71151 04/30/2012 05/04/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 4

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2012 05/18/2012 1

IP Occupational ALARA Planning and Controls 71124.02 05/14/2012 05/18/2012 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/14/2012 05/18/2012 1

IP Occupational Dose Assessment 71124.04 05/14/2012 05/18/2012 1

IP Performance Indicator Verification 71151 05/14/2012 05/18/2012 This report does not include INPO and OUTAGE activities.