ML110630459
| ML110630459 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/04/2011 |
| From: | NRC/RGN-II |
| To: | Progress Energy Carolinas |
| Shared Package | |
| ML110630451 | List: |
| References | |
| IR-11-001 | |
| Download: ML110630459 (2) | |
Text
Inspection / Activity Plan Page 1 of 2 03/04/2011 09:02:47 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris CDBI
- COMPONENT DESIGN BASES INSPECTION 7
1 IP Component Design Bases Inspection 7111121 02/28/2011 03/03/2011 1
IP Component Design Bases Inspection 7111121 03/21/2011 03/25/2011 1
IP Component Design Bases Inspection 7111121 04/04/2011 04/08/2011 1
IP Component Design Bases Inspection 7111121 04/18/2011 04/22/2011 OL RQ
- REQUAL INSPECTION 3
1 IP Licensed Operator Requalification Program 7111111B 03/21/2011 03/25/2011 EB1/DRS
- TI-177 GAS ACCUMULATION 3
1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 03/28/2011 04/01/2011 PSB1EP
- EMERGENCY PREPAREDNESS EXERCISE 2
1 IP Exercise Evaluation 7111401 04/25/2011 04/29/2011 1
IP Emergency Action Level and Emergency Plan Changes 7111404 04/25/2011 04/29/2011 1
IP Performance Indicator Verification 71151 04/25/2011 04/29/2011 OL EXAM
- INITIAL EXAM PREP 4
1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 06/20/2011 06/24/2011 OL EXAM
- INITIAL EXAM - WEEK 1 4
1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 07/11/2011 07/15/2011 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION 5
1 IP Identification and Resolution of Problems 71152B 07/11/2011 07/15/2011 1
IP Identification and Resolution of Problems 71152B 07/25/2011 07/29/2011 OL EXAM
- INITIAL EXAM - WEEK 2 4
1 HARRIS/JULY 2011 EXAM AT POWER FACILITIES V23352 07/18/2011 07/22/2011 PSB1-RP
- RP PUBLIC RADIATION PROTECTION INSP 6
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/08/2011 08/12/2011 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/08/2011 08/12/2011 1
IP Occupational Dose Assessment 71124.04 08/08/2011 08/12/2011 1
IP Radiation Monitoring Instrumentation 71124.05 08/08/2011 08/12/2011 1
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/08/2011 08/12/2011 1
IP Radiological Environmental Monitoring Program 71124.07 08/08/2011 08/12/2011 1
IP Performance Indicator Verification 71151 08/08/2011 08/12/2011 TFPI
- 805 TFPI 7
1 IP Fire Protection-NFPA 805 Transition Period [Triennial]
7111105P 08/29/2011 09/02/2011 1
IP Fire Protection-NFPA 805 Transition Period [Triennial]
7111105P 09/12/2011 09/16/2011 OL EXAM
- INITIAL EXAM PREP 3
1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 01/23/2012 01/27/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Inspection / Activity Plan Page 2 of 2 03/04/2011 09:02:47 Report 22 03/01/2011 - 06/30/2012 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris OL EXAM
- INITIAL EXAM - WEEK 1 3
1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 02/13/2012 02/17/2012 OL EXAM
- INITIAL EXAM - WEEK 2 3
1 HARRIS / FEBRUARY 2012 EXAM AT POWER FACILITIES V23367 02/20/2012 02/24/2012 EB3 ISI
- UNIT 1 INSERVICE INSPECTION 1
1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2012 05/04/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK1 4
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/30/2012 05/04/2012 1
IP Occupational ALARA Planning and Controls 71124.02 04/30/2012 05/04/2012 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/30/2012 05/04/2012 1
IP Occupational Dose Assessment 71124.04 04/30/2012 05/04/2012 1
IP Performance Indicator Verification 71151 04/30/2012 05/04/2012 PSB1-RP
- OCCUPATIONAL RP BASELINE WK2 4
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2012 05/18/2012 1
IP Occupational ALARA Planning and Controls 71124.02 05/14/2012 05/18/2012 1
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/14/2012 05/18/2012 1
IP Occupational Dose Assessment 71124.04 05/14/2012 05/18/2012 1
IP Performance Indicator Verification 71151 05/14/2012 05/18/2012 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.