August 28, 2017
SUBJECT:
UPDATED INSPECTION PLAN FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2017005
Dear Ms. Hamilton:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for the Shearon Harris Nuclear Power Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 404-997-4609 with any questions you have regarding this letter.
Sincerely,
/RA/
Steven D. Rose, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Docket Nos.: 50-400 License Nos.: NPF-63
Enclosure:
Harris Inspection/Activity Plan (09/01/2017 - 06/30/2019)
cc Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2017005 August 28, 2017
DISTRIBUTION:
M. Kowal, RII S. Price, RII K. Sloan, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
ADAMS Accession No. ML OFFICE RII:DRP RII:DRP RII: DRP
NAME DJackson JDodson SRose
DATE 8/15/2017 8/15/2017 8/28/2017
OFFICIAL AGENCY RECORD 17240A290
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 1 of 2 08/23/2017 14:09:16 ASM EP
1 IP Drill Evaluation 7111406 01/01/2017 12/31/2017 PI&R
- PROBLEM IDENTIFICATION AND RESOLUTION
1 IP Problem Identification and Resolution 71152B 09/11/2017 09/15/2017
IP Problem Identification and Resolution 71152B 09/25/2017 09/29/2017 OL EXAM
- INITIAL LICENSE EXAM PREP
1 HARRIS/MARCH 2018 INITIAL EXAM AT POWER FACILITIES V23509 02/05/2018 02/09/2018 OL EXAM
- INITIAL LICENSE EXAM
1 HARRIS/MARCH 2018 INITIAL EXAM AT POWER FACILITIES V23509 03/05/2018 03/16/2018 EP
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 03/26/2018 03/30/2018
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 03/26/2018 03/30/2018
IP Emergency Action Level and Emergency Plan Changes 7111404 03/26/2018 03/30/2018
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 03/26/2018 03/30/2018
IP Performance Indicator Verification 71151 03/26/2018 03/30/2018 ISI
- UNIT 1 IN-SERVICE INSPECTION & RVH EXAM
1 IP Inservice Inspection Activities - PWR 7111108P 04/16/2018 04/20/2018 RP
- RP OCCUPATIONAL - WEEK 1
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/16/2018 04/20/2018
IP Occupational ALARA Planning and Controls 71124.02 04/16/2018 04/20/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/16/2018 04/20/2018
IP Occupational Dose Assessment 71124.04 04/16/2018 04/20/2018
IP Radiation Monitoring Instrumentation 71124.05 04/16/2018 04/20/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 04/16/2018 04/20/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 04/16/2018 04/20/2018 RP
- RP OCCUPATIONAL - WEEK 2
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2018 05/18/2018
IP Occupational ALARA Planning and Controls 71124.02 05/14/2018 05/18/2018
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/14/2018 05/18/2018
IP Occupational Dose Assessment 71124.04 05/14/2018 05/18/2018
IP Radiation Monitoring Instrumentation 71124.05 05/14/2018 05/18/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 05/14/2018 05/18/2018
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/14/2018 05/18/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris Inspection / Activity Plan 09/01/2017 - 06/30/2019 Page 2 of 2 08/23/2017 14:09:16 TFPI
- TRIENNIAL FIRE PROTECTION INSPECTION
1 IP Fire Protection - NFPA 805 (Triennial)
7111105X 08/27/2018 08/31/2018
IP Fire Protection - NFPA 805 (Triennial)
7111105X 09/10/2018 09/14/2018 MODS
- PLANT MODIFICATIONS INSPECTION
1 IP Evaluations of Changes, Tests, and Experiments 7111117T 10/22/2018 10/26/2018 EQI
- DESIGN BASES ASSURANCE INSPECTION (PROGR
1 IP Design Bases Assurance Inspection (Programs)
7111121N 02/04/2019 02/08/2019
IP Design Bases Assurance Inspection (Programs)
7111121N 03/04/2019 03/08/2019
IP Design Bases Assurance Inspection (Programs)
7111121N 03/18/2019 03/22/2019 EP
- EP EXERCISE INSPECTION
1 IP Exercise Evaluation 7111401 04/29/2019 05/03/2019
IP Emergency Action Level and Emergency Plan Changes 7111404 04/29/2019 05/03/2019
IP Exercise Evaluation - Scenario Review 7111408 04/29/2019 05/03/2019
IP Performance Indicator Verification 71151 04/29/2019 05/03/2019 HS
- TRIENNIAL HEAT SINK PERFORMANCE
1 IP Heat Sink Performance 7111107T 06/17/2019 06/21/2019 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.