EOC Report 22
ML120650449
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
Shared Package
ML120650430 List:
References
IR-11-007
Download: ML120650449 (1)


Text

Inspection / Activity Plan Page 1 of 1 03/05/2012 08:08:36 Report 22 03/01/2012 - 06/30/2013 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Harris EB3 ISI

- UNIT 1 INSERVICE INSPECTION & RPVH EXAMS 2

1 IP Inservice Inspection Activities - PWR 7111108P 04/30/2012 05/04/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK1 4

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/30/2012 05/04/2012 1

IP Occupational ALARA Planning and Controls 71124.02 04/30/2012 05/04/2012 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/30/2012 05/04/2012 1

IP Occupational Dose Assessment 71124.04 04/30/2012 05/04/2012 1

IP Radiation Monitoring Instrumentation 71124.05 04/30/2012 05/04/2012 1

IP Performance Indicator Verification 71151 04/30/2012 05/04/2012 PSB1-RP

- OCCUPATIONAL RP BASELINE WK2 2

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/14/2012 05/18/2012 1

IP Occupational ALARA Planning and Controls 71124.02 05/14/2012 05/18/2012 1

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/14/2012 05/18/2012 1

IP Occupational Dose Assessment 71124.04 05/14/2012 05/18/2012 1

IP Radiation Monitoring Instrumentation 71124.05 05/14/2012 05/18/2012 1

IP Performance Indicator Verification 71151 05/14/2012 05/18/2012 PSB1EP

- EMERGENCY PREPAREDNESS INSPECTION 2

1 IP Alert and Notification System Testing 7111402 08/20/2012 08/24/2012 1

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 08/20/2012 08/24/2012 1

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 08/20/2012 08/24/2012 1

IP Performance Indicator Verification 71151 08/20/2012 08/24/2012 TI-182

- TI-182 BURIED PIPING/TANK - PHASE 1 1

1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 09/17/2012 09/21/2012 OL RQ

- REQUAL INSPECTION 2

1 IP Licensed Operator Requalification Program 7111111B 01/21/2013 01/25/2013 MODS

- PERM MODS 50.59 INSPECTION 4

1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/06/2013 05/10/2013 1

IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/20/2013 05/24/2013 HS

- TRIENNIAL HEAT SINK PERFORMANCE 1

1 IP Heat Sink Performance 7111107T 06/10/2013 06/14/2013 PSB1-RP

- RP PUBLIC RAD SAFETY BASELINE 5

1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 06/17/2013 06/21/2013 1

IP Radiological Environmental Monitoring Program 71124.07 06/17/2013 06/21/2013 1

IP Performance Indicator Verification 71151 06/17/2013 06/21/2013 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure