MONTHYEARIR 05000400/20240102024-12-0404 December 2024 Biennial Problem Identification and Resolution Inspection Report 05000400/2024010 IR 05000400/20240032024-11-0707 November 2024 Integrated Inspection Report 05000400/2024003 ML24290A1102024-10-24024 October 2024 Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability2023-07-11011 July 2023 Auxiliary Feedwater Pump Inoperability ML23135A7132023-05-15015 May 2023 – Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 05000400/LER-1922-006-01, Auxiliary Feedwater Pump Inoperability2023-03-10010 March 2023 Auxiliary Feedwater Pump Inoperability ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 2024-09-10
[Table view] Category:License-Operator
MONTHYEARML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 RA-24-0093, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-0202 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 ML22314A0912022-11-10010 November 2022 2A-2 Exam Final Items - Delay Release ML22314A0892022-11-10010 November 2022 2A-1 Exam Draft Items - Delay Release ML22291A1632022-10-18018 October 2022 301 Final SRO Written Exam Document ML22291A4322022-10-18018 October 2022 301 Final RO Written Exam Document ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 ML21167A2922021-06-16016 June 2021 301 ADAMS 2B ML21167A3352021-06-16016 June 2021 301 ADAMS 2A-3 ML21167A3162021-06-16016 June 2021 301 ADAMS 2A-1 ML21167A3272021-06-16016 June 2021 301 ADAMS 2A-2 ML21111A3502021-04-21021 April 2021 March 2021 GFE- Public.Docx ML21106A2142021-04-0707 April 2021 301 Retake Approval Letter ML21060B1762021-03-0101 March 2021 301 Retake Corporate Notification Letter ML21028A4052021-01-25025 January 2021 301 ADAMS 2A-2 ML21028A4472021-01-25025 January 2021 301 ADAMS 2A-3 ML21028A3392021-01-25025 January 2021 301 ADAMS 2A-1 ML21028A1002021-01-18018 January 2021 301 ADAMS 2B ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML21004A2352021-01-0404 January 2021 301 Exam Report Items - RO as Given Written Exam ML21004A2362021-01-0404 January 2021 301 Exam Report Items - SRO as Given Written Exam ML20311A1042020-11-0606 November 2020 Operator Licensing Written Examination Approval 05000400/2020301 RA-20-0075, Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 Response to NRC Regulatory Issue Summary 2020-01 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs RA-19-0237, Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations2019-05-15015 May 2019 Shearon Plant, McGuire Station, Oconee Nuclear Station and H.B. Robinson Plant - Response to NRC Regulatory Issue Summary 2019-02 Preparation and Scheduling of Operator Licensing Examinations ML19100A1872019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Shearon Harris Nuclear Plant ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18240A1592018-08-28028 August 2018 301 Exam Administrative Items (ADAMS-2D) ML18240A1522018-08-28028 August 2018 301 Exam Final Items (ADAMS-2B)- Delay Release 2 Yrs ML18240A1462018-08-28028 August 2018 301 Exam Draft Items (ADAMS-2A) - Delay Release 2 Yrs ML18121A4382018-05-0101 May 2018 301 Final RO Written Exam - Delay Release 2 Yrs ML17192A4432017-07-11011 July 2017 301 Draft Items (ADAMS-2A)- Delay Release 2 Yrs ML17192A4452017-07-11011 July 2017 301 Final Items (ADAMS-2B)- Delay Release 2 Yrs ML17192A4472017-07-11011 July 2017 301 Admin Items (ADAMS-2C)- Delay Release 2 Yrs ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16218A4992016-08-30030 August 2016 Initial Exam 2016301 Final SRO Written with Answer Key - Delay Release 2 Years ML16218A4942016-08-30030 August 2016 Initial Exam 2016301 Final RO Written with Answer Key - Delay Release 2 Years ML16197A5772016-07-12012 July 2016 Operator Licensing Written Examination Approval 05000400/2016301 ML16054A5432016-02-19019 February 2016 Notification of Licensed Operator Initial Examination 05000400/2016301 ML15013A2312015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative Documents ML15013A2352015-01-13013 January 2015 Initial Exam 2014-302 Draft RO Written Exam ML15013A2382015-01-13013 January 2015 Initial Exam 2014-302 Draft SRO Written Exam ML15013A2412015-01-13013 January 2015 Initial Exam 2014-302 Draft Simulator Scenarios ML15013A2452015-01-13013 January 2015 Initial Exam 2014-302 Draft Sim_IN-Plant JPMs ML15013A2492015-01-13013 January 2015 Initial Exam 2014-302 Draft Administrative JPM ML15013A2512015-01-13013 January 2015 Initial Exam 2014-302 Final Administrative Documents ML15013A2622015-01-13013 January 2015 Initial Exam 2014-302 Final Simulator Scenarios 2024-05-08
[Table view] Category:Part 55 Examination Related Material
[Table view] |
See also: IR 05000400/2022301
Text
February 2, 2022
Ms. Kim Maza
Site Vice President
Shearon Harris Nuclear Power Plant
Duke Energy Corporation
5413 Shearon Harris Rd
M/C HNP01
New Hill, NC 27562-9300
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT - NOTIFICATION OF
LICENSED OPERATOR INITIAL EXAMINATION 05000400/2022301
Dear Ms. Maza:
During a telephone conversation on January 26, 2022, between Mr. S. Rua, Exam
Superintendent, and Mr. J. Bundy, Senior Operations Engineer, arrangements were made for
the administration of licensing examinations at the Shearon Harris Nuclear Plant. The on-site
validation/preparatory week is scheduled for the week of August 15, 2022. The operating test is
scheduled to be administered during the week of September 19, 2022. The written examination
is scheduled to be administered the week of September 26, 2022.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 12 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by April 22, 2022. Mr. Bundy provided the written examination outline to your staff on
November 16, 2021. The written examinations, operating tests, and supporting reference
materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator
Licensing Initial Examinations, will be due by July 6, 2022. Pursuant to Title 10 of the Code of
Federal Regulations (10 CFR) 55.40(b)(3), an authorized representative of the facility licensee
shall approve the examinations and tests before they are submitted to the NRC for review and
approval. All materials shall be complete and ready to use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Delays in
receiving the required materials, or the submittal of inadequate or incomplete materials, may
cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, your staff will need to
provide adequate space and accommodations and to make the simulation facility available on
the dates noted above. In accordance with ES-3.5, Administering Operating Tests, your staff
should retain the original simulator performance data (e.g., system pressures, temperatures,
and levels) generated during the dynamic operating tests until the NRC takes licensing action
on all the applications and any adjudicatory actions on any hearing demands are complete.
K. Maza
2
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for
the written examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date
(if possible). Contact Mr. Bundy to determine the method for submission of the waiver or
excusal requests. Preliminary reactor operator and senior reactor operator license applications
(OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)
should be submitted at least 30 days before the first examination date. If the NRC does not
receive the preliminary applications at least 30 days before the examination date, a
postponement may be necessary. Final, signed applications certifying that all training has been
completed and requesting any waivers or excusals, as applicable, should be submitted at least
14 days before the first examination date.
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days
before the first examination date (preliminary) and 14 days before the first examination date
(final), the requests should be submitted as early as possible in the process (see the 60-day
guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC
are not binding. Submittals addressing waivers or excusals, or both, should be in writing
(i.e., using NRC Form 398 or as directed by Mr. Bundy) to determine the method for
submission. The NRC will document its final decision on whether to grant a waiver or excusal
on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not
provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the OMB, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average
2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions,
searching existing data sources, gathering and maintaining the data needed, and completing
and reviewing the information collections. Send comments regarding this information collection
to the FOIA, Library, and Information Collections Branch (T6-A10M), U.S. Nuclear Regulatory
Commission, Washington, DC 20555 0001, or by e-mail to: Infocollects.Resource@nrc.gov ;
and to the OMB reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018),
Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington,
DC 20503; email: oira_submission@omb.eop.gov.
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB control number.
In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a
copy of this letter and its enclosures will be available electronically for public inspection through
the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is
K. Maza
3
accessible on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Rua has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Bundy at (404) 997-4557, (Internet E-mail:
Jason.Bundy@nrc.gov ), or me at (404) 997-4551, (Internet E-mail: Gerald.McCoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-400
License Nos.: NPF-63
ML22034A535
SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE
RII/DRS/OB:OLA
RII/DRS/OB:CE
RII/DRS/OB:BC
NAME
D Egelstad
JBundy
GMcCoy
DATE
1/31 /2022
2/1 /2022
2/ 2 /2022