July 2, 2008

Mr. Robert J. Duncan, II Vice President Carolina Power & Light Company Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT: SHEARON HARRIS NUCLEAR POWER PLANT - NRC TEAM INSPECTION REPORT 05000400/2008007

Dear Mr. Duncan:

On June 6, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed a team inspection at your Shearon Harris reactor facility. The enclosed report documents the team's results, which were discussed on June 6, 2008, with you and other members of your staff. A follow-up telephone call was made on June 16, 2008, to Mr. Tony Zimmerman of your staff.

The inspection examined activities conducted under your license as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the condition of your operating license. Within these areas, the inspection involved examination of selected procedures and records, observation of activities, and interviews with station personnel. This report documents no findings of significance.

When separated from the Enclosure, this document is DECONTROLLED. CP&L 2 In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: DPR-35

Enclosure:

Inspection Report 05000400/2008007

w/Attachment:

Supplemental Information (OUO Removed) CP&L 2 In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC Agency-wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/ Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-400 License No.: DPR-35

Enclosure:

Inspection Report 05000400/2008007

w/Attachment:

Supplemental Information (OUO Removed)

X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRP RII:DRP NRR NRR RII:DRP SIGNATURE RJF /RA/ PBL /via email/ RAM /RA/ DJN /via email/ RC /via email/ GJW /RA/ NAME RFanner PLessard RMusser DNelson RCrlenjak GWilson DATE 06/30/2008 06/27/2008 07/02/2008 06/27/2008 06/27/2008 07/02/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: I:\RPB4\B.5.B\HARRIS B5B LTR-OUO W-O ENCL .DOC CP&L 3 cc w/encl Robert II Vice President - Harris Plant Progress Energy Carolinas, Inc. Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Kelvin Henderson Plant General Manager - Harris Plant Progress Energy Carolinas, Inc. Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 3 New Hill, NC 27562-0165 David H. Corlett, Supervisor Licensing/Regulatory Programs Progress Energy Carolinas, Inc. Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 David T. Conley Associate General Counsel-Legal Department Progress Energy Services Company, LLC P.O. Box 1551 Raleigh, NC 27602-1551 Chris L. Burton Director of Site Operations Progress Energy Carolinas, Inc. Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 Phyllis N. Mental (Acting) Manager Support Services Progress Energy Carolinas, Inc. Shearon Harris Nuclear Power Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs PEB 5 Progress Energy Carolinas, Inc.

P.O. Box 1551 Raleigh, NC 24602-1551 cc w/o encl: John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128

Beverly O. Hall Chief, Radiation Protection Section Department of Environmental Health N.C. Department of Environment and Natural Resources 3825 Barrett Drive Raleigh, NC 27609-7721

Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602

Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211

Chairman North Carolina Utilities Commission c/o Sam Watson, Staff Attorney P.O. Box 29510 Raleigh, NC 27626-0510

Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326

Herb Council Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602

Tommy Emerson Chair Board of County Commissioners of Chatham County 186 Emerson Road Siler City, NC 27344 CP&L 4 Letter to R. from Randall A. Musser dated July 2, 2008

SUBJECT: SHEARON HARRIS NUCLEAR POWER STATION - NRC TEAM INSPECTION REPORT 05000400/2008007 Distribution w/encl: M. Vaaler, NRR C. Evans, RII L. Slack, RII B. Westreich, NSIR (hard copy w/ encl) E. McNiel, NSIR (hard copy w/ encl) RIDSNRRDIRS OE Mail PUBLIC