IR 05000400/2016005

From kanterella
Jump to navigation Jump to search
Mid-Cycle Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2016005
ML16244A086
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/31/2016
From: Hopper G
NRC/RGN-II/DRP/RPB4
To: Waldrep B
Progress Energy Carolinas
References
IR 2016005
Download: ML16244A086 (7)


Text

UNITED STATES August 31, 2016

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2016005

Dear Mr. Waldrep:

On August 10, 2016, the Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the Shearon Harris Nuclear Power Plant. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2015, through June 30, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, the Shearon Harris Nuclear Power Plant operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Shearon Harris Nuclear Power Plant during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2018. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the second half of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. The NRC staff received the Harris Final Compliance letter for Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. The NRC staff issued the Harris Safety Evaluation on August 30, 2016, and will confirm full implementation of the orders mentioned above by performing Temporary Instruction 191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/Staffing/Multi-Unit Dose Assessment Plans.

In Staff Requirements Memorandum - SECY 16-0009, Recommendations Resulting from the Integrated Prioritization and Re-Baselining of Agency Activities, the Commission approved the NRC staff recommendation to discontinue the formal mid-cycle assessment process beginning in calendar year 2017. This will be the final mid-cycle assessment letter. The staff will continue to conduct quarterly assessment meetings and communicate changes in the assessment of licensee performance in accordance with the guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4645 with any questions you have regarding this letter.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-400 License Nos.: NPF-63 Enclosure:

Harris Inspection/Activity Plan (09/01/2016 - 06/30/2018)

cc Distribution via ListServ

___________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE DXW4 JSD GTH NAME DJackson JDodson GHopper DATE 8/24/2016 8/25/2016 8/29/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO Letter to Benjamin from George T. Hopper dated August 31, 2016.

SUBJECT: MID-CYCLE ASSESSMENT LETTER FOR SHEARON HARRIS NUCLEAR POWER PLANT - NRC INSPECTION REPORT 05000400/2016005 DISTRIBUTION:

D. Gamberoni, RII S. Price, RII L. Gibson, RII OE MAIL RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)

Page 1 of 3 Harris 08/31/2016 06:55:18 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site ASM EP - 2016 EP ASM & RES BASELINE 3 1 01/01/2016 12/31/2016 IP 7111406 Drill Evaluation ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 10/17/2016 10/21/2016 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1 10/17/2016 10/21/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/17/2016 10/21/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/17/2016 10/21/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/17/2016 10/21/2016 IP 71124.04 Occupational Dose Assessment 1 10/17/2016 10/21/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 10/17/2016 10/21/2016 IP 71151 Performance Indicator Verification RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1 10/31/2016 11/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10/31/2016 11/04/2016 IP 71124.02 Occupational ALARA Planning and Controls 1 10/31/2016 11/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 10/31/2016 11/04/2016 IP 71124.04 Occupational Dose Assessment 1 10/31/2016 11/04/2016 IP 71124.05 Radiation Monitoring Instrumentation 1 10/31/2016 11/04/2016 IP 71151 Performance Indicator Verification TI-191 - MITIGATING STRATEGIES 4 1 12/12/2016 12/16/2016 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 CDBI - COMPONENT DESIGN BASIS INSPECTION 7 1 01/30/2017 02/03/2017 IP 7111121 Component Design Bases Inspection 1 02/27/2017 03/03/2017 IP 7111121 Component Design Bases Inspection 1 03/13/2017 03/17/2017 IP 7111121 Component Design Bases Inspection 1 03/27/2017 03/31/2017 IP 7111121 Component Design Bases Inspection EP - EP EXERCISE 6 1 04/24/2017 04/28/2017 IP 7111401 Exercise Evaluation 1 04/24/2017 04/28/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 04/24/2017 04/28/2017 IP 7111408 Exercise Evaluation - Scenario Review 1 04/24/2017 04/28/2017 IP 71151 Performance Indicator Verification RP - RP PUBLIC RAD SAFETY BASELINE 4 1 07/17/2017 07/21/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 07/17/2017 07/21/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 2 of 3 Harris 08/31/2016 06:55:18 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP PUBLIC RAD SAFETY BASELINE 4 1 07/17/2017 07/21/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 07/17/2017 07/21/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 07/17/2017 07/21/2017 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSPECTION 2 1 08/07/2017 08/11/2017 IP 7111111B Licensed Operator Requalification Program PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 09/11/2017 09/15/2017 IP 71152B Problem Identification and Resolution 1 09/25/2017 09/29/2017 IP 71152B Problem Identification and Resolution TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 5 1 01/22/2018 01/26/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

1 02/05/2018 02/09/2018 IP 7111105X Fire Protection - NFPA 805 (Triennial)

EP - EP PROGRAM INSPECTION 3 1 03/26/2018 03/30/2018 IP 7111402 Alert and Notification System Testing 1 03/26/2018 03/30/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 03/26/2018 03/30/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 03/26/2018 03/30/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 03/26/2018 03/30/2018 IP 71151 Performance Indicator Verification ISI - UNIT 1 IN-SERVICE INSPECTION 1 1 04/16/2018 04/20/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 1 2 1 04/16/2018 04/20/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/16/2018 04/20/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 04/16/2018 04/20/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/16/2018 04/20/2018 IP 71124.04 Occupational Dose Assessment 1 04/16/2018 04/20/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 04/16/2018 04/20/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 04/16/2018 04/20/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 04/23/2018 04/27/2018 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL - WEEK 2 3 1 05/14/2018 05/18/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 05/14/2018 05/18/2018 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Page 3 of 3 Harris 08/31/2016 06:55:18 Inspection / Activity Plan Report 22 09/01/2016 - 06/30/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL - WEEK 2 3 1 05/14/2018 05/18/2018 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/14/2018 05/18/2018 IP 71124.04 Occupational Dose Assessment 1 05/14/2018 05/18/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 05/14/2018 05/18/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 05/14/2018 05/18/2018 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure