L-2004-260, October 2004 Monthly Operating Report for Turkey Point Units 3 and 4

From kanterella
(Redirected from ML043270483)
Jump to navigation Jump to search
October 2004 Monthly Operating Report for Turkey Point Units 3 and 4
ML043270483
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/10/2004
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2004-260
Download: ML043270483 (3)


Text

NOV 1 0 2004 FPL L-2004-260 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - October 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 11/02/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period October, 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 l ; - __ _l; __; <

Maximum Dependable Capacity (MWe-Net) 693  ; __-- _!; -___

Month Year-to-date Cumulative No. of hours reactor was critical 0 6469.1 209002.3 No. of hours generator was on line (service hours) 0 6396.7 206537.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 0 4463145 135267790 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20040019 9/26104 S 745 C 4 CYCLE 21 REFUELING OUTAGE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summarv Of Monthly Operating Experience Unit 3 had been shut down September 26,2004 and was down the entire month of October for the Cycle 21 refueling outage.

I t, DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 11/02/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period October, 2004 Design Electrical Rating (MWe-Net) 720 '

Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 745 7278.9 206698.7 No. of hours generator was on line (service hours) 745 7225.5 202203.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 529043 5052793 133574361 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Oneratina Experience Unit 4 operated at essentially 100% power for the month of October, 2004

Text

NOV 1 0 2004 FPL L-2004-260 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - October 2004 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the October 2004 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company

DOCKET NO.: 50-250 UNIT: Turkey Point Unit 3 DATE: 11/02/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period October, 2004 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 l ; - __ _l; __; <

Maximum Dependable Capacity (MWe-Net) 693  ; __-- _!; -___

Month Year-to-date Cumulative No. of hours reactor was critical 0 6469.1 209002.3 No. of hours generator was on line (service hours) 0 6396.7 206537.2 Unit reserve shutdown hours 0 0 121.8 Net Electrical Energy (MWH) 0 4463145 135267790 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Actionl Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2) 20040019 9/26104 S 745 C 4 CYCLE 21 REFUELING OUTAGE (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/Ucense Examination 5 - Other (Explain)

F - Administrative G -Operational Error (Explain)

H -Other Summarv Of Monthly Operating Experience Unit 3 had been shut down September 26,2004 and was down the entire month of October for the Cycle 21 refueling outage.

I t, DOCKET NO.: 50-251 UNIT: Turkey Point Unit 4 DATE: 11/02/2004 COMPLETED BY: Ronald Everett TELEPHONE: (305) 246-6190 Reporting Period October, 2004 Design Electrical Rating (MWe-Net) 720 '

Maximum Dependable Capacity (MWe-Net) 693 Month Year-to-date Cumulative No. of hours reactor was critical 745 7278.9 206698.7 No. of hours generator was on line (service hours) 745 7225.5 202203.9 Unit reserve shutdown hours 0 0 577.2 Net Electrical Energy (MWH) 529043 5052793 133574361 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours) (1) Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2- Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Continuation E - Operator Training/License Examination 5 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other Summary Of Monthly Oneratina Experience Unit 4 operated at essentially 100% power for the month of October, 2004