L-99-078, Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable

From kanterella
Jump to navigation Jump to search
Special Rept:On 990326,seismic Monitoring Instruments Were Declared Inoperable.Caused by Resolution of Potential TS Compliance Issue & Work Scheduling Issue.Instrumentation Was Returned to Svc Following Calibr & Declared Operable
ML20206J059
Person / Time
Site: Beaver Valley
Issue date: 05/03/1999
From: Jain S
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-078, L-99-78, NUDOCS 9905120097
Download: ML20206J059 (2)


Text

,

b l s. j l l 1

, g Beav Valley Power Station Shippingport. PA 15077 0004 SUSHIL C. JAIN (412) 393-5512 Sensor Vice Pres dent May 3, 1999 Fax (724) 643-8069 Nuclear Power Division {.gg.Q7g U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Special Report

In accordance with Beaver Valley Power Station, Unit No.1 Technical Specification l 3.3.3.3 Action item b and 6.9.2, the following Special Report is submitted for inoperable Seismic Monitoring Instruments. This Technical Specification Action item and Administrative Controls Reporting Requirement requires a Special Report be submitted to the Commission within the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument (s) to operable status with one seismic monitoring l instrument inoperable for more than 30 days. l Description of Event l

l Two condition reports were written on March 12 and March 23, 1999, for issues i pertaining to the Beaver Valley Power Station (BVPS) Unit No. 2 seismic monitoring instruments. These issues ultimately led to the issuance of BVPS Unit No. 2 LER 99-004 on April 12,1999.

I As a result of an extent of condition review from the Unit No. 2 issues, condition reports l were written on March 24 and March 26,1999, for similar issues pertaining to the BVPS l Unit No. I seismic monitoring instruments. As a conservative measure, the affected BVPS Unit I seismic monitoring instruments were declared inoperable when these Unit I condition reports were issued.

At issue were the basis, range and methods of conducting calibration on the seismic monitoring instrumentation in order to show compliance with the plant's Technical Specifications. The BVPS Unit 1 issues were resolved through a station position which

' DEllVERING 9905120097 990503 7 \

PDR ADOCK 05000334 0UAlIIY l S PDRj ,

ENERGV

l rotartsinimdA I noigeR CRN ,relliM .J .H .rM rotcepsnI tnediseR .rS ,nreK .M .D .rM reganaM tcejorP ,snilloC .S .D .rM :c niaJ .C lihsuS

,ylerecniS l 3025-393 )214( ta namrekcA .S .M .rM tcatnoc esaelp ,snoitseuq yna evah uoyfI

.elbareponi noitatnemurtsni cimsies eht eralced ot deen'detaicossa sti dna snrecnoc erutuf ralimis tneverp dluow hcihw denniffaer neeb sah secitcarp noitarbilac noitatnemurtsni gnirotinom cimsies eht fo ycauqeda ehT .secitcarp noitarbilac noitatnemmtsni gnirotinom cimsies fo ycauqeda eht gnidrager nrecnoc htiw gnitanigiro noitautis euqinu a saw sihT

.syad 03 deecxe ton did noitarbilac rof ecivres fo tuo saw noitatnemurtsni cimsies 1 tinU SPVB eht taht emit ehT .deusrup gnieb saw eussi ecnailpmoc noitacificepS lacinhceT laitnetop eht fo noituloser taht emit eht gnirud lanoitcnuf ylluf erew srotinom cimsies eht suhT .yrassecen eb ot ton denimreted yltneuqesbus saw stropeR noitidnoC eerht rof 32 hcraM no gnitrats elbareponi erew stnemurtsni gnirotinom cimsies I tinU SPVB eseht taht noitaralced laitini eht , emit eht ta erusaem evitavresnoc a hguohtlA

.egatuo ecnallievrus I tinU tnecer eht ni yaled keew eno a ot eud devloser neeb dah eussi ecnailpmoc noitacificepS lacinhceT laitini eht retfa doirep yad 03 eht fo dne eht raen eussi gniludehcs krow a )2 dna eussi ecnailpmoc noitacificepS lacinhceT laitnetop a fo noituloser gnirud elbareponi deralced gnieb stnemurtsni eseht )1 fo noitanibmoc a si syad 03 naht retaerg rof elbareponi gniniamer noitatnemurtsni gnirotinom cimsies I tinU siht fo esuac ehT esuaC

.elbareponi deralced yllaitini saw tnemurtsni cimsies tsrif eht ecnis syad 43 saw hcihw ,9991,72 lirpA no elbarepo deralced dna noitarbilac gniwollof ecivres ot denruter saw noitatnemurtsnI gnirotinoM cimsieS 1.oN tinU SPVB llA .krow noitarbilac noitatnemurtsni cimsies enituor siht gnitcudnoc rodnev eht ni syaled detcepxenu erew ereht ,revewoH .lirpA fo keew driht eht rof noitarbilac enituor rof deludehcs osla erew srotinom cimsies ehT .ecivres

' fo tuo deralced saw rotinom cimsies laitini eht retfa syad 03 naht retaerg ton saw heGlw ,9991,32 lirpA no detnemelpmi dna devorppa saw 2 egaP tropeR laicepS 1.oN tinU ,noitatS rewoP yellaV revaeB -