Monthly Operating Repts for Sept 1998 for Beaver Valley Power Station,Units 1 & 2.With
ML20154H565
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 09/30/1998
From: Brandt R, David Jones
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-197, NUDOCS 9810140247
Download: ML20154H565 (6)


Text

1 o ..

'Af Telephone (412) 393-6000 pugagjan L-98-197 Shippingport. PA 15077-0004 October 6,1998 I

i i

Beaver Valley Power Station l Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 l

Monthly Operating Reoort i

I U. S. Nuclear Regulatory Commission Document ControlDesk Washington,DC 20555 l

Gentlemen: l l

In accordance with NRC Generic Letter 97-02, " Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.1.6, the " Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of September,1998.

l Respectfully, h '

R. D. Brandt Division Vice President, Nuclear Operations Group and Plant Manager I DTJ/ sip Enclosures 4

' ~ . ' .-

o- /b cc: NRC Regional Office King ofPrussia, PA w The Nuclear Professionals 9810140247 990930 PDR ADOCK 05000334 R PDR l

l

'. ~'

UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE October 2,1998 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: September 1998 No. Date Type Duration Reason Method of Cause / Corrective Actions F: FM (Hours) (1) Shutting s: schaued Down (2) Comments NONE (1) Reason I (2) Method A - Equipment Fe8ure (Eglein) 1 - Manuel l B Maintenance or Test 2 - Manual Trip / Scram i C - Refuelin0 3 Aulomouc Trip / Scram l 0 - RepJetary Restriedon 4- Continumbon E - operator Training / Ucense Ejemination 5- other (Explain)

F - Administrothe G operationalError(Explain)

H - other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire month of September 1998.

In addition to the above, the following event which also occurred during the report period is being reported as required by Technical Specification 3.1.3.2 Note (3). While in Mode 1, the Automatic Rod Position Deviation Monitor, although still functional, was not considered operable per Technical Specifications. The limiting condition for operation as specified in the Technical Specifications was met because the deviations between the indicated rod positions were verified to be within their 12 step limits by obtaining analog / digital rod positions at least once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

l

-. .- . ~ _= - _ _ - - .-. - - . . . . - _ . .-.. .

OPERATING DATA REPORT DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 10/02/98 COMPLETED BY: DAVID T. JONES TELEPHONE: L412) 393-4962  !

la. REPORTING PERIOD: SEPTEMBER 1998

  • Notes *  !
1. DESIGN ELECTRICAL RATING (Net MWe) : 835 * *
2. MAX. DEPENDABLE CAPACITY (Net MWe) : 810 *
  • f THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 196511.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 720.0 1408.8 127071.0
4. SERVICE HOURS GENERATOR ON LINE: 720.0 1349.2 124822.7
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.b i
6. NET ELECTRICAL ENERGY GEN. (MWH). 586470.0 996809.0 91855392.0 l 7 GROSS ELECT. ENERGY GEN. (MWH): 621360.0 1080849.0 98230045.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1909045.0 3350451.0 303620255.5
9. UNIT AVAILABILITY FACTOR (%): 100.0 20.6 65.1
10. UNIT CAPACITY FACTOR (MDC) (%) : 100.6 18.8 59.8
11. UNIT FORCED OUTAGE RATE (%): 0.0 79.1 18.6 i

l.

I

~ '

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2 DATE October 2,1998 COMPLETED BY David T. Jones  !

TELEPHONE (412) 393-4962  !

REPORTING PERIOD: September 1998 No. Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours) (1) Shutting s schemmed Down (2) Comments j 12 980901 F 41.0 H 4 The Unit remained shutdown in Mode 5 to complete the resolution of Technical Specification compliance issues.

13 980902 F 405.0 A 4 The Unit remained shutdown in Mode 5 to complete modifications, repair and testing of Atwood & Monill weighted arm check j valves due to binding issues.

I 14 980919 F 95.0 A 4 The Unit remained shutdown in Mode 5 to complete repairs to several Borg-Wamer control valvos which were experiencing actuator problems.

15 980923 F 103.4 H 4 The UnN continued with startup activities from Mode 5 to Mode 1 following 4 successful completion of work during the .

extended forced outage.

l 18 980927 F 25.8 A 5 While in Mode 1 at approximately 15%

reactor power, but not yet synchronized to the electrical grid, the Unit experienced a generator overexcitation and turbine trip (reactor remained critical) caused by a failure of a contact 'in the exciter ciroJitry.

The contact was replaced then bench tested prior to continuing with stasiup activities.

17 980928 F 1.2 H 4 The UnN continued with startup activities l while in Mode 1 and was synchronized to  !

the electrical grid at 2328 hours0.0269 days <br />0.647 hours <br />0.00385 weeks <br />8.85804e-4 months <br /> on 09/28/98. l 18 980929 8 2.0 8 5 The Unit was removed from service to permit planned turbine overspeed trip testing (the reactor remained critical). l (1) Reason (2) Method A Equipment Feiurs (Emplain) 1 Manuel e MaintenanceorTest 2- Manuel Trip / serem C - ReNeung 3- Automelic Trip / serem D Regulatory Restriction 4 Continuelion E Operator Trainins / Uoense Eseminellon 5 Other(Egisin) l F Administrellwe i G - Operational Error (Eglein) .

H - Other (Emplain)

J

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit e2 DATE October 2,1998 COMPLETED BY _ David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: Sectember 1998

SUMMARY

l The Unit began the report period shutdown in Mode 5. Following resolution of Technical Specification compliance issues, completion of modifications, repair and testing of Atwood & Morrill weighted arm check valves, and completion of repairs to the actuators for several Borg-Wamer control valves, the Unit begcn startup and entered Mode 4 at 1503 hours0.0174 days <br />0.418 hours <br />0.00249 weeks <br />5.718915e-4 months <br /> on 09/22/98. Mode 3 was entered at 1448 hours0.0168 days <br />0.402 hours <br />0.00239 weeks <br />5.50964e-4 months <br /> on 09/23/98. On 09/26/98, Mode 2 was entered at 0541 hours0.00626 days <br />0.15 hours <br />8.945106e-4 weeks <br />2.058505e-4 months <br />, the reactor was taken

! critical at 0902 hours0.0104 days <br />0.251 hours <br />0.00149 weeks <br />3.43211e-4 months <br /> and Mode 1 was entered at 1216 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.62688e-4 months <br />. While at approximately 15% reactor power, the Unit experienced a generator overexcitation and turbine trip (reactor remained critical) at 2026 hours0.0234 days <br />0.563 hours <br />0.00335 weeks <br />7.70893e-4 months <br /> on 09/27/98. This was caused by a failure of a contact in the exciter circuitry. The contact was replaced then bench tested, and the Unit was subsequently synchronized to the electrical l

grid at 2328 hours0.0269 days <br />0.647 hours <br />0.00385 weeks <br />8.85804e-4 months <br /> on 09/28/98. The Unit was subsequently removed from service at 1226 hours0.0142 days <br />0.341 hours <br />0.00203 weeks <br />4.66493e-4 months <br /> on 09/29/98 to permit planned turbine overspeed trip testing. Following a successful turbine overspeed l trip test, the Unit was synchronized to the electrical grid at 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br /> on 09/29/98, and output was l increased. At 1150 hours0.0133 days <br />0.319 hours <br />0.0019 weeks <br />4.37575e-4 months <br /> on 09/30/98, the power increase was halted and output was stabilized at l

approximately 48% to permit required main steam safety valve testing. Following successful main steam safety valve testing and an acceptable quadrant power tilt ratio calculation, escalation to full power was begun at 0332 hours0.00384 days <br />0.0922 hours <br />5.489418e-4 weeks <br />1.26326e-4 months <br /> on 10/01/98. A nominal value of 100% output was achieved at 1 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> on 10/01/98.

l l

l i

__ _ _ _ _. . ..m__. _ _ . _ _ _ . . . _ _ _ _ . _ _ _ _ . . _ _ . . _ . _

't l

l j OPERATING DATA REPORT

. =

t DOCKET NO.: 50-412  !

UNIT NAME: BVPS UNIT #2 REPORT DATE: 10/02/98 COMPLETED BY: DAVID T. JONES

TELEPHONE
(412) 393-4962 1a. REPORTING PERIOD: SEPTEMBER 1998
  • Notes *
1. DESIGN ELECTRICAL RATING (Net MWe): 836 *
  • 1
2. MAX. DEPENDABLE CAPACITY (Net MWe): 820 *
  • L THIS MONTH YEAR TO DATE CUMULATIVE I 3a. HOURS IN REPORTING PERIOD: 720.0 6551.0 95294.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 111.0 111.0 75455.5 t
4. SERVICE HOURS GENERATOR ON LINE: 46.6 46.6 74896.0 ,
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 I
6. NET ELECTRICAL ENERGY GEN. (MWH) : 0.0 0.0' 57647298.0
7. GROSS ELECT. ENERGY GEN. (MWH) : 8500.0 8500.0 61010172.0 l
8. GROSS THERFmL ENERGY GEN. (MWH): 59964.0 59964.0 186946437.0 i 1
9. UNIT AVAILABILITY FACTOR (%) : 6.5 0.7 78.6 l
10. UNIT CAPACITY FACTOR (MDC) (%) : 0.0 0.0 73.5
11. UNIT FORCED OUTAGE RATE (%): 93.5 99.3 12.6 l

1 f

I 1

5

__-