l.
I dasf.
Telephone (412) 393-6000 Nuclear Group L-98-l ' 9 siSpp$p' ort. PA15077-0004 June 4,1998 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Ooeratina Report U. S. Nuclear Regulatory Commission Document ControlDesk Washington,DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, " Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.1.6, the " Monthly Operating Report" is submitted for Unit I and Unit 2 for the month ofMay,1998.
Respectfully, pJ } % hr P-DB R. D. Brandt Division Vice President, Nuclear Operations Grotiil and Plant Manager DTJ/sl}.
Enclosures 4
cc:
NRC Regional Office A f King ofPrussia, PA hMyI Jl
/
w The Nuclear Professionals M
e -
9806110323 980531 PDR ADOCK 05000334 R
UNIT SHUTDOWNS DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE June 2,1998 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD:
May 1998 No.
Date Type Duration Reason Metdd of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting s: scheduled Down (2)
Comments 10 980501 F
744.0 H
4 The Unit iemained shutdown in Mode 5 to continue with mod!fications to the Power Operated Relief Valves (PORVs) Nitrogen Supply Subsystem, and to resolve Technical Specification compliance issues.
(1) Reason (2) Method A Equipment Fogure (Expisin) 1 - Manuel B - Maintenance or Test 2-Manuel Trip / scram t
I C - Refusunf 3 AutomadoTrip/ Scram D-Regulatory Restriction 4-Condnungen E - Operator Training / License Examinanon 5-Other (Empimin)
F - Administrellve G OperationalError(Explain)
H - Other (Explain)
(
SUMMARY
The Unit remained shutdown in Mode 5 for the entire month of May 1998.
L l
l 1
1
OPERATING DATA REPORT DOCKET NO.:
50-334 UNIT NAME:
BVPS UNIT #1 REPORT DATE:
06/01/98 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-4962 i
la. REPORTING PERIOD:
MAY 1998
- Notes I.
DESIGN ELECTRICAL RATING (Net MWe):
835 2.
MAX. DEPENDABLE CAPACITY (Net MWe) :
810 THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD:
744.0 3623.0 193583.0 3.
NO. OF HRS. REACTOR WAS CRITICAL:
0.0 279.7 125941.9 4.
SERVICE HOURS GENERATOR ON LINE:
0.0 240.5 123714.0 5.
UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 6.
NET ELECTRICAL ENERGY GEN. (MWH):
0.0 126184.0 90984767.0 7
GROSS ELECT. ENERGY GEN. (MWH):
0.0 147694.0 97296890.0 8.
GROSS THERMAL ENERGY GEN. (MWH):
0.0 468225.0 300738029.5 9.
UNIT AVAILABILITY FACTOR (%) :
0.0 6.6 65.5
- 10. UNIT CAPACITY FACTOR (MDC) (%) :
0.0 4.3 60.1
- 11. UNIT FORCED OUTAGE RATE (%) :
100.0 93.2 17.8
UNIT SHUTDOWNS DOCKET No. 50-412 UNIT NAME BVPS Unit #2 DATE June 2,1998 COMPLETED BY David T. Jones TELEPHONE (412) 393-4982 REPORTING PERIOD:
May1998 i
No.
Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours)
(1)
Shutting s: scheduled Down (2)
Comments l
8 900501 F
744.0 H
4 The Unit remained shutdown in Mode 5 to resolve Technical Spedfication compliance lasues.
l l
l
- (1) Reason (2) Method A-Equipment Feaure(Explain) 1 -Manuel B - Maintercnce or Test 2-Manuel Trip / Scram C - Refueling 3 Automatic Trip /Scrare D - Reguistory Reetnction 4 Continusuon E Operator Training / Ucense Examinanon 5-Other(Explain)
F Administrative G - Operationsi Error (Expimin)
H Other(Explain) l l
SUMMARY
The Unit remained chutdcwn in Mode 5 for the entire month of May 1998.
l l
l l
l
[
OPERATING DATA REPORT DOCKET NO.:
50-412 UNIT NAME:
BVPS UNIT #2 REPORT DATE:
06/01/98 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-4962 1a. REPORTING PERIOD:
MAY 1998
- Notes 1.
DESIGN ELECTRICAL RATING (Net MWe):
836 2.
MAX. DEPENDABLE CAPACITY (Net MWe) :.
820 THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD:
744.0 3623.0 92366.0 3.
NO. OF HRS. REACTOR WAS CRITICAL:
0.0 0.0 75344.5 4.
SERVICE HOURS GENERATOR ON LINE:
0.0 0.0 74849.4 5.
UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 6.
NET ELECTRICAL ENERGY GEN. (MWH):
0.0 0.0 57647298.0 7.
GROSS ELECT. ENERGY GEN. (MWH):
0.0 0.0 61001672.0 8.
GROSS THERMAL ENERGY GEN. (MWH):
0.0 0.0 186886473.0 9.
UNIT AVAILABILITY FACTOR (%) :
0.0 0.0 81.0
- 10. UNIT CAPACITY FACTOR (MDC) (%) :
0.0 0.0 75.8
- 11. UNIT FORCED OUTAGE RATE (%) :
100.0 100.0 9.5