L-99-096, Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for May 1999 for BVPS Units 1 & 2. with
ML20195E563
Person / Time
Site: Beaver Valley
Issue date: 05/31/1999
From: David Jones, Ostrowski K
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-096, L-99-96, NUDOCS 9906110230
Download: ML20195E563 (6)


Text

r .

t ,e

  • ~

l

'Af Telephone (412) 393-6000

, - Nuclear Group L-99-096 i P.O. Box 4 Shippingport, PA 15077 0004 June 4,1999 l

l-Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF '/3 Monthly Operating Report U. S. Nuclear Regulatory Commission Document ControlDesk Washington,DC 2G355 Gentlemen:

In accordance with NRC Generic Letter 97 02, " Revised Contents of the Monthly l Operating Report", and Unit I and 2 Technical Specification 6.9.1.6, the " Monthly Operating Report" is submitted for Unit I and Unit 2 for the month ofMay,1999.

Respectfully, h.

t l K. L. Ostrowski l Division Vice President, Nuclear Operations Group and Plant Manager DTJ/ sip-t Enclosures t cc: NRC Regional Oflice

[p/ O f 1

King ofPrussia, PA /

' .! . i ; 5 tl The Nuclear Professionals 9906110230 990531 PDR ADOCK 05000334 R -PDR

7- ,,

+

' UNIT SHUTDOWNS DOCKET NO. 50 334 UNIT NAME BVPS Unit #1 DATE June 2,1999

. COMPLETED BY David T. Jones TELEPHONE (412) 393-4962

~ REPORTING PERIOD.- May1999 No. . Date - Type Duration Reason Method of Cause/ Corrective Actions

p. Forced - (Hours) (1) Shutting s: . Down (2) Comments Scheduled -

'8 990501' F 164.7 A 4 The Unit remained shutdown following the [

planned surveillance outage, to cleanup and test the Main Unit Generator Seal Oil  ;

System prior to resuming startup.

(1) Reason .

(2) Method ,

A EquipmentFailure(Explain) 1. Manual

' B Maintenance or Test . 2 ManuelTrip/ scram C- Refueling 3. Automatic Trip / Scram D RegulatoryRestriction 4. Contmustion E . operator Training / Ucense Examination 5. other (Explain)

F . Administrative -

. G .operatonal Error (Explain)

- H .Other (Explain) 1

SUMMARY

The Unit. began the report period operating in Mode 1 at approximately 15% reactor power while  !

preparations for synchronization to the electrical grid following completion of a planned surveillance outage continued. ' However, continuing problems with the MaJn Unit Generator (MUG) Seal Oil System

'resulted in the Unit being taken back to hot shutdown status. Mode 2 was entered at 1106 hours0.0128 days <br />0.307 hours <br />0.00183 weeks <br />4.20833e-4 months <br /> and Mode 3 was entered'at 1141 hours0.0132 days <br />0.317 hours <br />0.00189 weeks <br />4.341505e-4 months <br /> on 05/01/99 in preparation for cleanup of the MUG Seal Oil

- System.-

(Continued on the next page) l l

o

{.

r .

UNIT SHUTDOWNS OOCKET No. 50-334 UNIT NAME BVPS Unit e1 DATE June 2,1999 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: May 1999

SUMMARY

(continued): .

Following completion of MUG Seal Oil System cleanup and testing, the Unit commenced to stastup and entered Mode 2 at 1257 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.782885e-4 months <br /> on 05/07/99. The reactor was taken critical at 1447 hours0.0167 days <br />0.402 hours <br />0.00239 weeks <br />5.505835e-4 months <br />, Mode 1 ;

was entered at 1653 hours0.0191 days <br />0.459 hours <br />0.00273 weeks <br />6.289665e-4 months <br /> and the Unit was synchronized to the electrical grid at 2044 hours0.0237 days <br />0.568 hours <br />0.00338 weeks <br />7.77742e-4 months <br /> on -

- 05/07/99. Output was then escalated to approximately 27% at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on 05/07/99, however, power escalation above 30% output could noi continue until Steam Generator chemistry was within l

- specifk h. Following satisfactory Steam Generator chemistry results, escalation to approximately 48% output was commenced at 0808 hours0.00935 days <br />0.224 hours <br />0.00134 weeks <br />3.07444e-4 months <br /> on 05/08/99. An output of approximately 48% was achieved at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on 05/08/99. The Unit remained at approximately 48% output to load follow per Duquesne Light Company (DLCO) System Operations request. At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> on 05/09/99, the Unit commenced to increase output to approximately 78% per DLCO System Operations request. I Following resolution of high seal water temperatures on the 1A Main Feedwater Pump, an output of i approximately 78% was achieved at 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> on 05/09/99 as load following continued. At  !

0620 hours0.00718 days <br />0.172 hours <br />0.00103 weeks <br />2.3591e-4 months <br /> on 05/10/99, the Unit commenced to increase output to full power per DLCO System i Operations request. Load following was completed ,and a nominal output of 100% was achieved at  !

1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> on 05/10/99.

1 The Unit continued to operate at a nominal value of 100% output until 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> on 05/14/99 when l output was reduced to approximately 62% to load follow per DLCO System Operations request. At 0528 hours0.00611 days <br />0.147 hours <br />8.730159e-4 weeks <br />2.00904e-4 months <br /> on 05/17/99, the Unit commenced to ine ease output to full power per DLCO System Operations request. Load following was completed and a nominal output of 100% was achieved at 0919 hours0.0106 days <br />0.255 hours <br />0.00152 weeks <br />3.496795e-4 months <br /> on 05/17/99. The Unit continued to operate at a nominal value of 100% output for the j remainder of the report period. l j

=

[; ,

p . ,

- l

- . 1

(:

l

! : [- ,

l~

l OPERATING DATA REPORT l

I- DOCRET NO. 50-334 UNIT NAME:- BVPS UNIT #1 REPORT DATE: 06/03/99 q COMPLETED BY DAVID T. JONES j TELEPHONE: .(412) 393-4962 -l l'

I

.la. REPORTING PERIOD: MAY 1999. [ Notes

1. DESIGN ELECTRICAL RATING (Not Mwe): 835 [ ,
2. MAX. DEPENDABLE CAPACITY (Net Mwe): 810 [,,,,,,,,,,,,,,,,*

1 l

l THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 3623.0 202343.0

3. NO. OF HRS. REACTOR WAS CRITICAL: 585.2 2779.0 132059.0 44 SERVICE HOURS GENERATOR ON LINE: 579.3 2710.2 129741.9
5. UNIT RESERVE SHUTDOWN HOURS:- 0.0 0.0 0.0

.6. NET ELECTRICAL ENERGY GEN. (MWH): 428146.0 2071690.0 95757582.0 l

7. . GROSS ELECT ENERGY GEN. (!#fH) : 458986.0 2217620.0 102384395.0
8. ~ GROSS THERMAL ENERGY GEN. (MWH): 1410478.0 6797314.0 316267091.5 i
9. UNIT AVAILABILITY FACTOR (%): 77.9 74.8 65.J l
10. . UNIT CAPACITY FACTOR (MDC) (%): 71.0 70.6 60.4
11. UNIT FORCED OUTAGE RATE (%): 22.1 16.3 18.3 l'

I

UNIT SHUTDOWNS DOCKET NO. 50-412 UNIT NAME BVPS Unit #2

. DATE June 2,1999 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: May 1999 No. Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours) (1) Shutting s: scheduled Down (2) Comments NONE l

(1) Reason (2) Method A Equipment FeAuro (Eglein) 1 -Manuel s MaintenanoserTest 2-ManuelTrip/ seren C Refusang 3 AutomenoTrip/ scree D RegulatoryRestriction 4- Continuellgn  ;

E operator Training / Uoenes Emminadon s other(Emplain)

' F Adminleirothe G operationalEner(Eglein)

H other(Emplain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. The Unit continued to operate at a nominal value of 100% output until 1248 hours0.0144 days <br />0.347 hours <br />0.00206 weeks <br />4.74864e-4 months <br /> on 05/07/99 when output was reduced by approximately 2% to gain extra margin as a conservative measure in order to prevent a possible turbine runback during the re-scaling of Loop ill Delta-T / Tavg. Following completion of the re-scaling, the Unit was requested by Duquesne Light Company System Operations at 0311 hours0.0036 days <br />0.0864 hours <br />5.142196e-4 weeks <br />1.183355e-4 months <br /> on 05/09/99, to remain operating at approximately 98% output to load follow. The Unit continued to load follow at approximately 98% output uhtil it was retumed to a nominal value of 100% sutpdi at 0528 hours0.00611 days <br />0.147 hours <br />8.730159e-4 weeks <br />2.00904e-4 months <br /> on 05/09/99. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

r . ,

. o  :

)

1 OPERATING DATA REPORT I

DOCKET No.: 50-412 UNIT NAMES. SVPS UNIT 82 REPORT DATE: 06/03/99 COMPLETED BY: DAVID T. JONES TELEPHONE: (312) 393-4962 a

la. REPORTING PERIOD ' -

MAY 1999 Notes *

, 1. DESIGN ELECTRICAL RATING (Net Mwe):' 836 , )

2. 'HAX. DEPENDABLE CAPACITY (Not Mwe): 820 ,,,,,,,,,,,,,,,,,

THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 744.0 3623.0 101126.0 .l

3. NO. OF HRS REACTOR WAS CRITICAL: 744.0 2508.2 80184.5

' 4. SERVICE HOURS GENERATOR ON LINE: 744.0 2547.9 79577.0

5. UNIT. RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 6 ' NET ELECTRICAL ENERGY GEN. (MWM): . 618770.0 2055860.0 61456442.0
7. GROSS ELECT. ENERGY GEN. (MWH): 650842.0 2173034.0 65029986.0 8 .' GROSS THERHAL ENERGY GEN. (MWH): 1969461.0 6557824.0 199062579.0 i

.9.- UNIT AVAILABILITY FACTOR (%): 100.0 70.3 78.7

10. UNIT CAPACITY FACTOR (MDC) (%): 101.4 69.2 73.8
11. UNIT FORCED OUTAGE RATE (%): 0.0 4.3 12.1

)

l i

.i 4

l i

I