Special Rept Per Tech Specs 6.9.2, Special Repts & 3.12.1, Land Use Census, Re Comparison of Dose Calculations.Change to Offsite Dose Commitment Manual Unnecessary Based on Listed Reasons
ML20203F991
Person / Time
Site: Beaver Valley
Issue date: 07/17/1986
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
ND1SS1:2855, NUDOCS 8607310219
Download: ML20203F991 (2)


Text

'

(

(

'Af Telephone (412) 393-6000 Nuclear Division P. O. Box 4 Shippingport, PA 15077-0004 July 17, 1986 ND1SS1:2855 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Special Report NRC Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region 1 Park Avenue King of Prussia, PA 19406 Gentlemen:

In accordance with Appendix A, Beaver Valley Technical Specifications, 6.9.2, "Special Reports" and 3.12.1, " Land Use Census," the following Special Report is submitted.

In a comparison of dose calculations required by Tech Spec L.C.O.

3.12.2 Action Statement A, the following was revealed:

The "Offsite Dose Commitment Manual" (ODCM) 1985 total body dose (3.17E-2 mrem) was calculated at 1.1 miles NW.

By using the current land use census, the highest 1985 total body dose (8.0E-2 mrem) was determined to be at a location of 0.62 miles NE.

Even though the land use census identified a location which yielded a dose greater than the value calculated by the ODCM, we do not feel that a change to the ODCM is necessary at this time for the following reasons:

1.

The nearest residence, as identified in the 1985 Land Use Census, has not changed from those identified in previous years.

2.

The elevated plume, as described in the ODCM, touches down at approximately one mile; therefore, a location change from 1.1 miles NW to 0.62 miles NE would result in a lower calculated dose.

l The contents of this report were discussed in a telecon between j

Anthony T. Lonnett (DLC Health Physics Specialist) and Peter S. Tam (NRC, Project Manager) on July 14, 1986.

Very truly yours, l

8607310219 860717 h

{DR ADOCK 0500 4

/

g Wm / S. acey Plant Manager i b DM/ vat l

4 I

July 17, 1986 NDISS1:2855 Page two cc: United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Dr. Thomas E. Murley Regional Administrator United States Nuclear Regulatory Commission Region 1 King of Prussia, PA 19406 C. A. Roteck, Ohio Edison Mr. Peter Tam, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, DC 20555 W. Troskoski, Nuclear Regulatory Commission, BVPS Site Inspector Mr. Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 G. E. Muckle, Factory Mutual Engineering, Pittsburgh Mr. J. A. Triggiani, Operating Plant Projects Manager Mid Atlantic Area Westinghouse Electric Corporation Nuclear Services Integration Division Box 2728 Pittsburgh, PA 15230 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange Suite 245 270 Farmington Avenue i

Farmington, CT 06032 l

l 1

_