L-98-210, Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Oct 1998 for Bvps,Units 1 & 2. with
ML20155H854
Person / Time
Site: Beaver Valley
Issue date: 10/31/1998
From: David Jones, Ostrowski K
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-210, NUDOCS 9811100304
Download: ML20155H854 (5)


Text

a

,91VA

'Ab?

M T.i.pnon. am 39>sooo Nuclear Group P O. Box 4 L-98-210 )

Shippingport. PA 15077-0004 j

November 5,1998 )

i Beaver Valley Power Station  ;

Unit 1 - Docket No. 50-334, License No. DPR-66 l Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operatinn Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, " Revised Contents of the Monthly  ;

Operating Report", and Unit I and 2 Technical Specification 6.9.1.6, the " Monthly Operating i Report" is submitted for Unit I and Unit 2 for the month of October,1998.

i Respectfully, f

Ah.

l l

K. L. Ostrowski Division Vice President, }'" L) sp,7 Nuclear Operations Group and Plant Manager DTJ/ sip Enclosures cc: NRC Regional Office King ofPrussia, PA 3,

.u g

,t w

The Nuclear Professionals 9811100304 981031 "~

PDR ADOCK 05000334 ,

R PDR

. _ _ _ , . . . . . . - - - . .- . . - . ~ ~ - . . - . . . . . -. . . . .

- OPERATING DATA REPORT DOCKET NO.
50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 11/03/98 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962

.la. REPORTING PERIOD: OCTOBER 1998

  • Notes *
1. DESIGN ELECTRICAL RATING (Net MWe): 835 * *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 810 *
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 745.0 7296.0 197256.0
3. No OF HRS. REACTOR WAS CRITICAL: 745.0 2153.8 127816.0
4. SERVICE HOURS GENERATOR ON LINE: 745.0 2094.2 125567.7
5. UNIT RESERVE SHUTDOWN H$URS: 0.0 0.0 0.0

'6. NET ELECTRICAL ENERGY GEN. (MWH): 616500.0 1613309.0 92471892.0

7. GROSS ELECT. ENERGY GEN. (MWH): 652310.0 1733159.0 98882355.0
8. GROSS THERMAL ENERGY GEN. (MWH): 1974419.0 5324870.0 305594674.5
9. UNIT AVAILABILITY FACTOR (%) : 100.0 28.7 65.2 I J
10. UNIT CAPACITY FACTOR (MDC)- (%) : 102.2 27.3 59.9
11. UNIT FORCED OUTAGE RATE (%) : 0.0 70.9 18.5 I

)

i l

o I

a 4

l - - - - -

'. I UNIT SHUTDOWNS DOCKET NO. 50 334 UNIT NAME BVPS Unit #1 )

DATE November 3,1998 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: October 1998 No. Date Type Duration Reason Method of Cause / Corrective Actions  ;

F: Forced (Hours) (1) ShuttinD s: scheduled Down (2) Comments l

O l

N '

E- -  !

I

. (1) Reason .

(2) Method A EquipmentFedure(Emplain) 1 - Manuel s MaintenanceorTest 2.Manuel Trip / scram C RefusAng 3 AutomedcTrip/ Scram D Regulatory Restriction 4 Canunusson E operator Training / Ucense EnemineNon 5.other(EN)

F Adminleirothe G. Operamonal Error (Emplain)

H - other (Egisin)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire month of October 1998.

In addition to the above, the following event which also occurred during the report period is being reported as required by Technical Specification 3.1.3.2 Note (3). While in Mode 1, the Automatic Rod Position Deviation' Monitor, although still functional, was not considered operable per Technical Specifications. The limiting condition for operation as specified in the Technical Specifications was met because the deviations between the indicated rod positions were verified to be within their 12 step limits by obtaining analog / digital rod positions at least once every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

x_ , _-. -

II a OPERATING DATA REPORT l

DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 11/03/98 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 1a. REPORTING PERIOD: OCTOBER 1998

  • Notes *
1. DESIGN ELECTRICAL RATING (Net MWe): 836 * *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 820 *
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 745.0 7296.0 96039.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 745.0 856.0 76200.5
4. SERVICE HOURS GENERATOR ON LINE: 745.0 791.6 75641.0
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 64 NET ELECTRICAL ENERGY GEN. (MWH): 616177.0 616177.0 58263475.0
7. GROSS ELECT. ENERGY GEN. (MWH): 648075.0 656575.0 61658247.0
8. . GROSS THERMAL ENERGY GEN. (MWH): 1955999.0 2015963.0 188902436.0
9. UNIT AVAILABILITY FACTOR (%): 100.0 10.8 78.8
10. UNIT CAPACITY FACTOR (MDC) (%) : 100.9 10.3 73.7
11. UNIT FORCED OUTAGE RATE (%): 0.0 89.1 12.5 I'

_q L,  ; '.

i UNIT SHUTDOWNS DOCi":T NO. 50-412 UNIT NNE BVPS Unit #2 DATti , November 3,1998 COMPLETED BY L,. id T. Jones TELEPHONE (412', .23-4962 a REPORTING PERIOD: Odober 1998 No. Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours) (1) Shutting

. s: schasuisd Down (2) Comments N

O N

E (1) Reason (2) Metted l A- Equipment Failure (Eglein) 1. Manuel B - Maintenance or Test 2 ManusiTrip/screm C - RehJeling 3. Automatic Trip / scram D - Reguistory Resittellon 4 Centnuagen E operator Training / Ucense Emuninstion 5- other (Eglein)

F Administrouve G operemonalError(Eglein)

H - other (Eglein)

SUMMARY

The Unit begare the report period operating at approximately 48% output to permit required main steam safety valve testing which had begun on 09/30/98. Following successful main steam safety valve testing and an acceptable quadrant power tilt ratio calculation, escalation to full power was begun at 0332 hours0.00384 days <br />0.0922 hours <br />5.489418e-4 weeks <br />1.26326e-4 months <br /> on 10/01/08. A nominal value of 100% output was achieved at 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br /> on 10/01/98. The Unit operated at a nominal value of 100% output for the remainder of the report period. .

I 1

1

% .