Text

'

e

.e -

1

'Af Telephone {412) 393-8000 Nuclear G,roup L-98-139 Shippingport. PA 15077-0004 July 7,1998 l

Beaver Valley Power Station Unit ) - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk .

Washington,DC 20555 l Gentlemen:

In accordance with NRC Generic Letter 97-02, " Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.1.6, the " Monthly Operating Report" is submitted for Unit I and Unit 2 for the month of June,1998.

Respectfully,

/

ahr y . D. Brandt Division Vice President, Nuclear Operations Group and Plant Manager DTJ/stp Enclosures l

cc: NRC Regional Office Kmg ofPrussia, PA gj

('

Q The Nuclear Professionals

~

. n ,3 9807140034 980630 PDR ADOCK 05000334 R PDR

DOCKET NO. 50-334 UNIT NAME BVPS Unit #1

, DATE July 6,1998 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: June 1998 No. Date Type Duration Reason Method of Cause / Corrective Actions F: For ed (Hours) (1) Shutting s: scheduled Down (2) Comments 11 980601 F 720.0 H 4 The Unit remained shutdown in Mode 5 to complete modifications to the Power Operated Relief Valves (PORV's) Nitrogen Supply Subsystem, and to resolve Technical Specification compliance issues.

(1) Reason (2) Method A Equipment Failure (Erplain) 1 - Manual B - Maintenance or Test 2- Manual Tnp / scram C - Refueling 3 - Automatic Tnp / scram D - Regulatory Restriction 4- Continuation E - Operator Training / Ucense Examination 5 Other(Explain)

F - Administrate 4e G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit remained shutdown in Mode 5 for the entire month of June 1998.

l I

OPERATING DATA REPORT 1

l DOCKET NO.: 50-334 UNIT NAME: BVPS UNIT #1 REPORT DATE: 07/06/98 l COMPLETED BY: DAVID T. JONES i

TELEPHONE: (412) 393-4962 e ****** ** ** ***

1a. REPORTING PERIOD: JUNE 1998

  • Notes *
1. DESIGN ELECTRICAL RATING (Net MWe): 835 * *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 810 *
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 4343.0 194303.0
3. NO. OF HRS. REACTOR WAS CRITICAL:,

0.0 279.7 125941.9

4. SERVICE HOURS GENERATOR ON LINE: 0.0 240.5 123714.0
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 0.0 126184.0 90984767.0
7. GROSS ELECT. ENERGY GEN. (MWH) : 0.0 147694.0 97296890.0
8. GROSS THERMAL ENERGY GEN. (MWH): 0.0 468225.0 300738029.5
9. UNIT AVAILABILITY FACTOR (%): 0.0 5.5 65.2
10. UNIT C7PACITY FACTOR (MDC) (%) : 0.0 3.6 59.9
11. UNIT FORCED OUTAGE RATE (%) : 100.0 94.3 18.2

,., UNIT SHUTDOWNS DOCKET NO.- 50 412 UNIT NAME BVPS Unit #2 DATE July 6.1998 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: June 1998 No. Date Type Duration Reason Method of Cause / Corrective Actions F: Forceo (Hours) (1) Shutting S- scheduled Down (2) Comments 9 980601 F 720.0 H 4 The Unit remained shutdown in Mode 5 to resolve Technical Specific 6 tion compliance issues.

(1) Reason (2) Method A. Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manua: Trip / Scram C - Refueling 3. Automatic Trip / Scram O. Rogulatory Restriction 4. Continuation E . Operator Training / beense Examination 5. Other (Expleen)

F . Administrative G Opersbonal Error (Explain)

H . Other (Explain)

SUMMARY

The Unit remained shutdown in Mode 5 for the entire month of June 1998.

l l

i l

i l

. e-OPERATING DATA REPORT DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2' REPORT DATE: 07/06/98 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 1a. REPORTING' PERIOD: JUNE 1998

  • Notes
  • li ' DESIGN ELEC.TRICAL RATING (Net MWe): 836 * *

', 2. . MAX. DEPENDABLE CAPACITY (Net MWe): 820

  • THIS MONTH YEAR TO DATE CUMULATIVE 3a. HOURS IN REPORTING PERIOD: 720.0 4343.0 93086.0
3. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 0.0 75344.5 l 4. SERVICE HOURS GENERATOR ON LINE: 0.0 0.0 74849.4 l'
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 0.0 0.0 57647298.0
7. GROSS ELECT. ENERGY GEN. (MWH): 0.0 0.0 61001672.0
8. GROSS THERMAL ENERGY GEN. (MWH) : 0.0 0.0 186686473.0
9. UNIT AVAILABILITY FACTOR (%) : 0.0 0.0 80.4

, 10. UNIT CAPACITY FACTOR (MDC) (%) : 0.0 0.0 75.2 l

11. UNIT FORCED OUTAGE RATE (t) : 100.0 100.0 10.3 1

-)