. e

'A@

Telephone (412) 393-6000 Nuc wp 9 L.98-168 Shippmgport. PA 15077-0004 August 6,1998 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report __

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, " Revised Contents of the Monthly Operating Report", and Unit I and 2 Technical Specification 6.9.1.6, the " Monthly Operating ,

Report" is submitted for Unit I and Unit 2 for the month of July,1998. I Respectfully, i

) .

. Brandt ivision Vice President, .

Nuclear Operations Group and Plant Manager DTJ/ sip 7

. Enclosures hk([l j cc: NRC Regional Office King ofPmssia, PA 1 I

rQw , The Nuclear Professionals 9808120081 980731 PDR ADOCK 05000334 R PDR g L____-_________

l L .- - -

y l

\, . , .

l OPERATING DATA REPORT DOCKET NO.: 50-334 j

UNIT NAME: BVPS UNIT #1 REPORT DATE: 08/04/96 COMPLETED-BY: DAVID T. JONES TELEPHONE: (412) 393-4962

'la. REPORTING PERIOD: JULY 1998

  • Notes *
1. DESIGN ELECTRICAL RATING (Net MWe): 835 * *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 810 *
  • k l

THIS MONTH YEAR TO DATE CUth';ATIVE f

l

'Ja. HOURS IN REPORTING PERIOD: 744.0 5087.0 195047.0

3. NO. OF HRS. REACTOR WAS CRITICAL: 0.0 279.7 125941.9
4. SERVICE HOURS GENERATOR ON LINE: 0.0 240.5 123714.0
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 l
6. NET ELECTRICAL ENERGY GEN. (MWH): 0.0 126184.0 90984767.0 i
7. GROSS ELECT, ENERGY GEN. (MWH): 0.0 147694.0 97296896.0 (
8. GROSS THERMAL ENERGY GEN. (MWH): 0.0 468225.0 300738029.5
9. UNIT AVAILABILITY FACTOR (%): 0.0 4.7 65.0 l
10. UNIT CAPACITY FACTOR (MDC) (t) : 0.0 3.1 59.7

'{

11. UNIT FORCED OUTAGE RATE (%) : 100.0 95.2 18.6

\

l l

1

y.

g, UNIT SHUTDOWNS DOCKET NO. ._50-412 UNIT NAME BVPS Unit #2 DATE August 4,1998 COMPLETED BY Dav!d T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: July 1998 No. Date Type Duratiot. Reason Method of Cause / Conrective Actions F; Forced (Hours) (1) Shutting S Scheduled Down (2) Comments 10 960701 F 744.0 H 4 The Unit remained shutdown in Mode 5 to continue with resolution of Technical Specification compliance issues.

(1) Reason (2) Method A - Equipment Feilure (Expimin) 1 Manuel

, B Maintenance or Test 2 Manuel Trip / Scram

' C - Refueling 3 Automatic Trip / Scram D - Reguistory Restricte 4 Contmustion E - operator Training / License Examination 5 Other(Explain)

F . Administrative G - Operational Error (Explain) .

H - Other (Explain)

SUMMARY

The Unit remained shutdown in Mode 5 for the entire month of July 1998.

il 4

I I

I - 1

.. UNIT SHUTDOWNS q,

DOCKET NO. 50-334 UNIT NAME BVPS Unit #1 DATE August 4.1998 COMPLETED BY David T. Jones TELEPHONE (412) 393-4962 REPORTING PERIOD: July 1998 Nd. Date Type Duration Reason Method of Cause / Corrective Actions F: Forced (Hours) (1) Shutting s: scheduled Down (2) Comments 12 980701 F 52.1 H 4 The Unit remained shutdown in Mode 5 to complete post-modification testing of the Power Operated Relief Valves (PORVs)

Nitrogen Supply Subsystem, and to continue with resolution of Technical Specification compliance issues.

13 980703 F 691.9 H 4 The Unit remained shutdown in Mode 5 to continue with resolution of Technical Specification compliance issues.

(1) Reason (2) Method A - Equipment Failure (Expisin) 1 Manuel 8 Maintenance or Test 2. Manuel Trip / scram C . Refuelme 3. Automatic Trip / scram D Regulatory Restriction 4 Continuation ,

E - Operator Training / Llconee Examination 5. Other (Expisin)

F Administrative G - Operational Error (Explain)

H Other(Expisin)

SUMMARY

The Unit remained shutdown in Mode 5 for th'e entire month of July 1998.

m .-- .

l~ -

?. .

M9' .

1 I

l \

OPERATING DATA REPORT i' DOCKET NO.: 50-412 UNIT NAME: BVPS UNIT #2 REPORT DATE: 08/04/98 COMPLETED BY: DAVID T. JONES TELEPHONE: (412) 393-4962 l la. REPORTING PERIOD:- JULY 1998

  • Notes *
1. DESIGN ELECTRICAL RATING (Net MWe) : 836 * *
2. MAX. DEPENDABLE CAPACITY (Net MWe): 820 *
  • THIS MONTH YEAR TO DATE CUMULATIVE 3a HOURS IN REPORTING PERIOD: 744.0 5087.0 93830.0 l 3. NO.- OF HRS. REACTOR WAS CRITICAL: 0.0 0.0- 75344.5
4. SERVICE HOURS GENERATOR ON LINE: 0.0 0.0 74849.4
5. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GEN. (MWH): 0.0 0.0 57647298.0
7. GROSS ELECT. ENERGY GEN. (MWH) : 0.0 0.0 61001672.0
8. GROSS THERMAL ENERGY GEN. (MWH): 0.0 '

O.0 186886473.0

9. UNIT AVAILABILITY FACTOR (%): 0.0 0.0 ,9.8

(- 10._ UNIT. CAPACITY FACTOR (MDC) . (%) : 0.0 0.0 74.6

11. UNIT FORCED OUTAGE RATE (%) : 100.0 100.0 11.1 i