~1 -
m e
'Af (412)456 6000 435 Samth Avenue
$"g"*
DUQUESNE LIGHT COMPANY Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 April 16, 1982 NDISS1:559 Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 LER 82-011/01P, 82-012/01P n
co
,o Mr. R. C. Haynes, Regional Administrator
'/
- P
.g United States Nuclear Regulatory Commission o @g.?[ ~ -
Region 1 2
4, 4 [
631 Park Avenue c.O'6[
30 -ff King of Prussia, Pennsylvania 19406
.c.y, ; ;
Dear Mr. Haynes:
Q rul { _/
In accordance with Appendix A, Beaver Valley Technical Speci it on 6.9.1.8, Administrative Controls, Licensee Event Reports LER 82-011/01P and LER 82-012/01P are submitted. These occurrences were reported to Mr. D. A.
Beckman, the BVPS NRC Resident Inspector, at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br /> on April 16, 1982.
I During records update of the analysis required by IE Bulletin 79-14, overstress conditions have been identified at four locations in the Safety Injection System and three locations in the Main Steam System.
The four locations of overstress in the Safety Injection System lnvolve a total of four supports on the three parallel branch lines providing high head safety injection to the Reactor Coolant System cold legs.
The three locations of overstress in the Main Steam System involve a total of six supports (two supports per location) on the three steam generator main steam lines upstream of their respective isolation valves within containment.
Beaver Valley is presently in a refueling and modification outage.
In the present ope rational mode, the systems are not in use and no danger to the health and safety of the public exists.
Required modifications to bring the supports to within acceptable limits will be made through Design Change Package 305. The work will be completed prior to plant startup.
9 8h04260 %
d i
ii r
L
.q.
Ai 4
O
- Mr. R. C. Haynes April 16, 1982 NDISS1:559 i
Page 2 Additional details on the: Safety Injection System support modifications will be submitted with the fourteen day follow-up report to LER 82-011/01P.
Additional details on the Main Steam System support. modifications will be submitted with the fourteen day follow-up report to LER 82-012/01P.
d
& t4 H. P. Williams L
i Station Superintendent tav k
L i
i 1
d
?
ht q
w
+
m t
-3
+ -
- >T T
--e1i
-- g wmy.y S-
-m 7 wyhewy---a*w w,c-rv w* ' *Tm-we' 9-V wf*4-F
M'%?T'--
Js a
Mr. R. C. Haynes April 16, 1982 NDISSI:559 Page 3 cc:
Director Of Management & Program Analysis United States Nuclear Regulatory Commission Washington, D. C.
20555 J. Hultz, Ohio Edison Director, Office of Inspection and Enforcement Headquarters United States Nuclear Regulatory Commission Washington, D. C.
20555 D. A. Chaney, BVPS Licensing Project Manage r United States Nuclear Regulatory Commission Washington, D. C.
20555 D. A. Beckman, Nuclear Regulatory Commission, BVPS Site Inspector Mr. Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison Records Center, Institute of Nuclear Power Operations, Atlanta, Georgia C. E. Muckle, Factory Mutual Engineering, Pit tsburgh Arthur Alford, Stone & Webster / Boston Mr. John Alford, PA Public Utilities Commission, Harrisburg, PA
-