L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station | 7 December 2023 | Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station | Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |
L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | 6 December 2023 | Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation | Time of Discovery Fitness for Duty Contraband Condition Adverse to Quality Safeguards Contingency Plan Preemption Authority Exemption Request |
L-23-215, Changes to Emergency Plan | 19 October 2023 | Changes to Emergency Plan | Safe Shutdown Health Physics Network High winds High Radiation Area Offsite Dose Calculation Manual Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Minimum staff Fire Protection Program Siren |
L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 12 September 2023 | Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | |
L-23-172, Quality Assurance Program Manual | 31 August 2023 | Quality Assurance Program Manual | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Pandemic Grace period |
L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | 7 August 2023 | Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments | Cyber Security Safeguards Contingency Plan Fire Protection Program |
L-23-175, Submittal of Fifth Ten Year Inservice Testing Program | 1 August 2023 | Submittal of Fifth Ten Year Inservice Testing Program | Safe Shutdown Stroke time Incorporated by reference Locked High Radiation Area Cold shutdown justification |
L-23-034, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models | 13 June 2023 | 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models | |
L-23-135, Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 31 May 2023 | Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
L-23-065, Annual Financial Report | 22 May 2023 | Annual Financial Report | |
L-23-131, Readiness for Resumption of NRC Supplemental Inspection | 12 May 2023 | Readiness for Resumption of NRC Supplemental Inspection | |
L-23-101, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 | 12 May 2023 | Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station - 2022 | Annual Radiological Environmental Operating Report |
L-23-092, Occupational Radiation Exposure Report for Year 2022 | 27 April 2023 | Occupational Radiation Exposure Report for Year 2022 | |
L-23-061, Submittal of the Decommissioning Funding Status Reports | 31 March 2023 | Submittal of the Decommissioning Funding Status Reports | Decommissioning Funding Plan |
L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments | 29 March 2023 | and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments | Tornado Missile |
L-23-066, Annual Notification of Property Insurance Coverage | 21 March 2023 | Annual Notification of Property Insurance Coverage | |
L-23-059, Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 | 9 March 2023 | Response to Apparent Violation in NRC Inspection Report 05000346/2022091; EA 23-002 | Inattentive |
L-22-212, CFR 50.55a Request RP-5 Regarding Inservice Pump Testing | 6 March 2023 | CFR 50.55a Request RP-5 Regarding Inservice Pump Testing | Incorporated by reference |
L-23-048, Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report | 1 March 2023 | Response to Request for Additional Information Regarding Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report | |
L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee | 20 February 2023 | Energy Harbor Nuclear Corp Retrospective Premium Guarantee | |
L-22-253, Submittal of Pressure and Temperature Limits Report, Revision 5 | 10 January 2023 | Submittal of Pressure and Temperature Limits Report, Revision 5 | Hydrostatic Pressure and Temperature Limits Report |
L-22-284, Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) | 28 December 2022 | Request for Notice of Enforcement Discretion for Technical Specification 3.7.9, Ultimate Heat Sink (UHS) | Ultimate heat sink Mission time Enforcement Discretion FLEX Large early release frequency Frazil ice |
L-22-211, Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report | 29 September 2022 | Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report | Nondestructive Examination |
L-22-216, Submittal of Pressure and Temperature Limits Report. Revision 4 | 27 September 2022 | Submittal of Pressure and Temperature Limits Report. Revision 4 | Hydrostatic Pressure and Temperature Limits Report |
L-22-213, Occupational Radiation Exposure Report for Year 2021 - Correction | 23 September 2022 | Occupational Radiation Exposure Report for Year 2021 - Correction | |
L-22-129, Submittal of the Updated Final Safety Analysis Report, Revision 34 | 20 September 2022 | Submittal of the Updated Final Safety Analysis Report, Revision 34 | Incorporated by reference |
L-22-194, Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events | 19 September 2022 | Submittal of Supplemental Information for the Reanalysis for Protection Against Low Temperature Reactor Coolant System Overpressure Events | |
L-22-203, Submittal of Evacuation Time Estimates | 12 September 2022 | Submittal of Evacuation Time Estimates | Pandemic Coronavirus |
L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual | 9 August 2022 | Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual | Offsite Dose Calculation Manual Nondestructive Examination Temporary Modification Condition Adverse to Quality Aging Management Process Control Program License Renewal Pandemic Grace period |
L-22-152, Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan | 5 July 2022 | Response to Request for Additional Information Regarding a License Amendment Request That Revises the Davis-Besse Nuclear Power Station Emergency Plan | |
L-22-068, Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report | 30 June 2022 | Cycle 22 and Refueling Outage 22 Inservice Inspection Summary Report | Boric Acid Past operability Coatings Moisture barrier |
L-22-037, 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models | 30 June 2022 | 2021 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models | |
L-22-149, Post Accident Monitoring Report | 23 June 2022 | Post Accident Monitoring Report | Post Accident Monitoring |
L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding | 22 June 2022 | Readiness for NRC Supplemental Inspection Required for a White Finding | |
L-22-098, Withdrawal of Proposed Inservice Inspection Alternative RR-A2 | 22 June 2022 | Withdrawal of Proposed Inservice Inspection Alternative RR-A2 | |
L-22-136, Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage | 7 June 2022 | Steam Generator Tube Circumferential Crack Report - Spring 2022 Refueling Outage | |
L-22-102, Report of Facility Changes, Tests, and Experiments | 16 May 2022 | Report of Facility Changes, Tests, and Experiments | |
L-22-092, Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 2021 | 16 May 2022 | Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report for the Davis-Besse Nuclear Power Station - 2021 | Annual Radiological Environmental Operating Report |
L-22-124, Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building | 12 May 2022 | Response to Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building | |
L-22-047, Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1 | 10 May 2022 | Unit No.1 - Core Operating Limits Report, Cycle 23, Revision O and Revision 1 | Shutdown Margin |
L-22-127, Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding | 6 May 2022 | Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding | |
L-22-089, Occupational Radiation Exposure Report for Year 2021 | 12 April 2022 | Occupational Radiation Exposure Report for Year 2021 | |
L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage | 22 March 2022 | Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage | |
L-22-059, Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 | 21 March 2022 | Response to Request for Additional Information on Proposed Inservice Test Alternative RP-3 | |
L-22-074, Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 15 March 2022 | Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
L-22-061, Ile Post Exam Letter L-22-061 | 24 February 2022 | Ile Post Exam Letter L-22-061 | |
L-22-023, Retrospective Premium Guarantee | 17 February 2022 | Retrospective Premium Guarantee | |
L-21-266, Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 | 27 January 2022 | Response to Request for Additional Information on Proposed Inservice Inspection Alternative RR-A2 | Boric Acid Loop seal Hydrostatic Operating Basis Earthquake Nondestructive Examination Finite Element Analysis Earthquake Pressure boundary leak Through-Wall Leak Power change |
L-20-289, Emergency Plan Amendment Request | 19 January 2022 | Emergency Plan Amendment Request | Safe Shutdown Health Physics Network High winds High Radiation Area Grab sample Offsite Dose Calculation Manual Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Fuel cladding Minimum staff Fire Protection Program Siren Overexposure |
L-21-290, Response to NRC Inspection Report 05000346/2021091, EA-21-176 | 21 December 2021 | Response to NRC Inspection Report 05000346/2021091, EA-21-176 | |