L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee

From kanterella
Jump to navigation Jump to search
Energy Harbor Nuclear Corp Retrospective Premium Guarantee
ML23052A018
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 02/20/2023
From: Benyak D
Energy Harbor Nuclear Corp
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-23-057
Download: ML23052A018 (1)


Text

le energy

~ harbor Energy Harbor Nuclear Cmp.

168 E. Market Street Akron, Ohio 44308 Dari11 M. Benyak 330-436-/380 Senior Vice President, Fleet Nuclear Operations February 20, 2023 L-23-057 10 CFR 140.21 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Retrospective Premium Guarantee The requirements of 10 CFR 140.21 include annual submittal of evidence that each licensee maintains a guarantee of payment of deferred premium in the amount of

$20.496 million for each reactor it is licensed to operate. Energy Harbor Nuclear Corp.

and Energy Harbor Nuclear Generation LLC maintain nuclear liability insurance procured through Marsh USA, Inc. for Beaver Valley Power Station, Unit Nos. 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No . 1 under the American Nuclear Insurer's (ANI) Master Policy-Nuclear Energy Liability Insurance (Secondary Financial Protection). This coverage includes a Bond of Payment of Retrospective Premiums and provides the basis for compliance with the provisions of 10 CFR 140.21 (a). Marsh USA submitted a certificate of insurance evidencing this coverage to the Nuclear Regulatory Commission (NRC) by letter dated January 18, 2023.

Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station , Unit No. 1 Perry Nuclear Power Plant, Unit No . 1 L-23-057 Page 2 There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required , please contact Mr. Phil H. Lashley, Manager -

Fleet Licensing , at 330-696-7208 .

i::N~L Darin M. Benyak cc: NRC Region I Administrator NRC Region Ill Administrator NRC Resident Inspector (Beaver Valley)

NRC Resident Inspector (Davis-Besse)

NRC Resident Inspector (Perry)

NRR Project Manager (Fleet)

Director, Bureau of Radiation Protection/Department of Environmental Protection (BRP/DEP)

Site BRP/DEP Representative Utility Radiological Safety Board