Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:UTILITY
MONTHYEARIR 05000498/19900271990-09-20020 September 1990 Insp Repts 50-498/90-27 & 50-499/90-27 on 900813-17.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program ML20059K9431990-09-18018 September 1990 Insp Repts 50-498/90-28 & 50-499/90-28 on 900730-0808. Violations Noted.Major Areas Inspected:Onsite Followup of Two Events IR 05000498/19900241990-08-17017 August 1990 Insp Repts 50-498/90-24 & 50-499/90-24 on 900701-0801.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events at Operating Power Reactors & Licensee Action on Previous Findings IR 05000498/19900231990-07-19019 July 1990 Insp Repts 50-498/90-23 & 50-499/90-23 on 900601-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Licensee Actions on Previous Insp Findings IR 05000498/19890211989-09-29029 September 1989 Informs That Insp Repts 50-498/89-21 & 50-499/89-21 Canceled & That No Insp Rept Will Be Issued IR 05000498/19890311989-09-28028 September 1989 Insp Repts 50-498/89-31 & 50-499/89-31 on 890814-25.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities Associated W/Current Refueling Outage IR 05000498/19890301989-09-26026 September 1989 Insp Repts 50-498/89-30 & 50-499/89-30 on 890801-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Licensee Action on Previous Insp Findings & Preparation for Refueling IR 05000498/19890351989-09-26026 September 1989 Insp Repts 50-498/89-35 & 50-499/89-35 on 890814-18. Violation Noted.Major Areas Inspected:Inadvertent Radioactive Contamination of Portions of Auxiliary Steam Sys Condensate Return Flow Path & Inorganics Basin IR 05000498/19890331989-09-22022 September 1989 Insp Repts 50-498/89-33 & 50-499/89-33 on 890821-25. Violations Noted.Major Areas Inspected:Steam Generator Primary Manway Bolting Removal Problems & Inservice Insp Activities IR 05000498/19890371989-09-20020 September 1989 Insp Repts 50-498/89-37 & 50-499/89-37 on 890911-15. Violations Noted.Major Areas Inspected:Programs for Control of NDE Activities & Design Changes/Mods Activities IR 05000498/19890361989-09-0808 September 1989 Insp Repts 50-498/89-36 & 50-499/89-36 on 890821-25. Violations Noted.Major Areas Inspected:Control of Welding Activities IR 05000498/19890251989-09-0707 September 1989 Insp Repts 50-498/89-25 & 50-499/89-25 on 890724-28 & 0807-11.No Violations or Deviations Noted.Major Areas Inspected:Action on Previously Identified Items & self-assessment Capability IR 05000498/19890221989-08-31031 August 1989 Insp Repts 50-498/89-22 & 50-499/89-22 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Followup,Review & Evaluation of Lers,Licensee Action on Previously Identified Insp Findings & Enforcement Action IR 05000498/19890261989-08-25025 August 1989 Insp Repts 50-498/89-26 & 50-499/89-26 on 890718-20.No Violations Noted.Major Areas Inspected:Failure of Unit 2 STP Generator Output Transformer 2A on 890713 IR 05000498/19890231989-08-10010 August 1989 Insp Repts 50-498/89-23 & 50-499/89-23 on 890701-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Actions on Previous Insp Findings, Monthly Maint Observation & Operational Safety Verification IR 05000498/19890151989-08-0303 August 1989 Insp Repts 50-498/89-15 & 50-499/89-15 on 890607-30. Violations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Operations Procedures & Two Amends to Tech Specs IR 05000498/19890141989-08-0202 August 1989 Insp Repts 50-498/89-14 & 50-499/89-14 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Actions to Prevent & Respond to Loss of DHR Described in Generic Ltr 88-17 & Followup on Previous Insps ML20245L5741989-07-26026 July 1989 Insp Repts 50-498/89-17 & 50-499/89-17 on 890601-30. Violations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previous Insp Findings,Operational Safety Verification & Monthly Maint & Surveillance Observations IR 05000498/19890181989-07-24024 July 1989 Insp Repts 50-498/89-18 & 50-499/89-18 on 890626-30 & 0710-14.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Inservice Testing Program for Pumps & Valves & Review of Previous Test Data IR 05000498/19890241989-07-24024 July 1989 NRC Insp Repts 50-498/89-24 & 50-499/89-24 Cancelled IR 05000498/19890201989-07-24024 July 1989 Insp Rept 50-498/89-20 & 50-499/89-20 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Records & Document Control Programs IR 05000498/19890191989-07-0505 July 1989 Insp Repts 50-498/89-19 & 50-499/89-19 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected: Followup,Review & Evaluation of LERs & One Open Item IR 05000498/19890131989-06-30030 June 1989 Insp Repts 50-498/89-13 & 50-499/89-13 on 890501-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Esf Sys Walkdown & Monthly Maint Observation ML20245F2151989-06-21021 June 1989 Insp Repts 50-498/89-16 & 50-499/89-16 on 890605-09. Violations Noted.Major Areas Inspected:Audit,Procurement & Receipt,Storage & Handling of Equipment Matls Programs ML20244C3811989-05-26026 May 1989 Insp Repts 50-498/89-11 & 50-499/89-11 on 890401-30. Violations Noted.Major Areas Inspected:Plant Status,Followup of Events,Operational Safety Verification,Monthly Maint Observation & Surveillance Observation ML20244C1461989-05-18018 May 1989 Partially Withheld Insp Repts 50-498/89-10 & 50-499/89-10 on 890410-14 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support, Security Program Plan & Protected Area Barriers ML20247K1991989-05-17017 May 1989 Insp Repts 50-498/89-12 & 50-499/89-12 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000498/19890081989-05-0404 May 1989 Insp Repts 50-498/89-08 & 50-499/89-08 on 890301-31. Violations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previously Identified Insp Items,Operational Safety Verification & Monthly Maint Observation IR 05000498/19890071989-04-28028 April 1989 Insp Repts 50-498/89-07 & 50-499/89-07 on 890313-17. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings for Units 1 & 2 & Areas Including Control Room & Shift Turnover Observations for Unit 2 ML20245E9001989-04-19019 April 1989 Insp Repts 50-498/89-02 & 50-499/89-02 on 890101-31. Violations Noted.Major Areas Inspected:Plant Status,Esf Sys Walkdown,Monthly Maint & Surveillance Observation & Operational Safety Verififcation IR 05000498/19890041989-04-14014 April 1989 Insp Repts 50-498/89-04 & 50-499/89-04 on 890201-28. Violation Noted.Major Areas Inspected:Plant Status,Esf Sys Walkdown,Monthly Maint Observations,Monthly Surveillance Observations & Operational Safety Verification IR 05000498/19890091989-04-12012 April 1989 Insp Repts 50-498/89-09 & 50-499/89-09 on 890327-31.No Violations or Deviations Noted.Major Areas Inspected: Precriticality Data Review & Startup Test Results Evaluation for Initial Plant Startup IR 05000498/19890011989-03-0909 March 1989 Insp Repts 50-498/89-01 & 50-499/89-01 on 890109-13 & 23-27. No Violations or Deviations Noted.Major Areas Inspected: Calibr Program & Preventive Maint Program Re Calibr of Plant Instrumentation for Components Not Addressed in Tech Spec IR 05000498/19890061989-03-0707 March 1989 Insp Repts 50-498/89-06 & 50-499/89-06 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Receipt,Storage & Handling of Emergency Diesel Generator Fuel Oil & High Temp Inside Containment IR 05000498/19890051989-03-0303 March 1989 Insp Repts 50-498/89-05 & 50-499/89-05 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Insp of Plant,Including Startup & Core Physics Testing IR 05000498/19890031989-02-28028 February 1989 Insp Repts 50-498/89-03 & 50-499/89-03 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radwaste Mgt Program,Including Liquid,Gaseous & Solid Radwaste Processing Sys IR 05000498/19880661988-11-0909 November 1988 Partially Withheld Physical Security Insp Repts 50-498/88-66 & 50-499/88-66 on 881017-21 (Ref 10CFR73.21). Violations Noted:Inadequate Compensatory Measures IR 05000498/19880621988-11-0707 November 1988 Page 7 to Insp Repts 50-498/88-62 & 50-499/88-62,correcting Illegibility of Previously Submitted Page IR 05000498/19880691988-11-0404 November 1988 Insp Repts 50-498/88-69 & 50-499/88-69 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected: Preoperational Testing IR 05000498/19880631988-10-27027 October 1988 Insp Repts 50-498/88-63 & 50-499/88-63 on 880901-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previous Insp Findings,Monthly Surveillance Observation & Monthly Maint Observation ML20195D9521988-10-26026 October 1988 Insp Repts 50-498/88-62 & 50-499/88-62 on 880912-14 & 881010-14.No Violations or Deviations Noted.Major Areas Inspected:Qc Program & Preoperational Test Procedure Review, & Test Witnessing & Location of Manual Trip Circuit IR 05000498/19880611988-10-26026 October 1988 Insp Repts 50-498/88-61 & 50-499/88-61 on 881003-07.No Violations or Deviation Noted.Major Areas Inspected: Implementation of Fire Protection Program & Compliance W/ Requirements of 10CFR50,App R IR 05000498/19880521988-10-12012 October 1988 Insp Repts 50-498/88-52 & 50-499/88-52 on 880808-0902.No Violations or Deviations Noted.Major Areas Inspected:Maint Procedures,Emergency Procedures & Tech Specs Associated W/ Unit 2 IR 05000498/19880641988-10-12012 October 1988 Insp Repts 50-498/88-64 & 50-499/88-64 on 880921-24.No Violations or Deviations Noted.Major Areas Inspected:Unit 2 Structural Integrity Test & Containment Integrated Leak Rate Test IR 05000498/19880571988-09-30030 September 1988 Insp Repts 50-498/88-57 & 50-499/88-57 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Radwaste Treatment Sys & Preoperational Insp of Unit 2 Water Chemistry & Radiochemistry Programs IR 05000498/19880551988-09-29029 September 1988 Insp Repts 50-498/88-55 & 50-499/88-55 on 880801-31.No Violations or Deviations Noted.Major Areas Inspected:Loose Part Monitoring Sys Test,Remote Reactor Shutdown Test, Control Rod Sys Test & Fuel Handling Bldg Insp IR 05000498/19880541988-09-23023 September 1988 Insp Repts 50-498/88-54 & 50-499/88-54 on 880822-26. Violations Noted.Major Areas Inspected:Plant & Operating Procedures,Operator Readiness Training & Operational Staffing IR 05000498/19880601988-09-20020 September 1988 Partially Withheld Insp Repts 50-498/88-60 & 50-499/88-60 on 880906-07 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Fixed Site Physical Protection of SNM of Low Strategic Significance IR 05000498/19880511988-09-20020 September 1988 Insp Repts 50-498/88-51 & 50-499/88-51 on 880725-29.0808-12 & 0829-0901.No Violations or Deviations Noted.Major Areas Inspected:Records Review,Procedures Review,Instrumentation Components & Sys,Work Observations & Heat Shrinkable Tubing IR 05000498/19880591988-09-19019 September 1988 Insp Repts 50-498/88-59 & 50-499/88-59 on 880906-09.No Violations or Deviations Noted.Major Areas Inspected: Completed Preoperational Test Procedures & Review Procedures for & Observe Receipt & Storage of New Fuel 1990-09-20
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support PNO-IV-99-037, on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI1999-08-23023 August 1999 PNO-IV-99-037:on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19993011999-07-26026 July 1999 Exam Repts 50-498/99-301 & 50-499/99-301 on 990706-15.Exam results:17 Applicants Passed Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B ML20203D5611999-02-10010 February 1999 Notice of Violation from Insp on 980614-1123.Violation Noted:From 980614-0615,period Greater than 8 Hours,Unit 1 Channel III 125-volt Battery Bank E1B11 Inoperable with Reactor in Mode 1 & Reactor Not Placed in Hot Standby IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support ML20196G9171998-12-0202 December 1998 Notice of Violation from Insp on 981102-05.Violation Noted:Licensee Did Not Make Surveys to Ensure Compliance with 10CFR20.1902,requiring Posting of Each Radiation Area with Conspicuous Sign or Signs Bearing Radiation Symbol IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20195F2921998-11-12012 November 1998 Notice of Violation from Insp on 980906-1017.Violation Noted:On 980922,Work Order BS-354091 Contained Maint Instructions That Were Inappropriate to Circumstances IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations ML20236M3011998-07-0808 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:Fire Brigade Training Drill Did Not Assess Each Member'S Knowledge of Role in Fire Fighting Strategy for Area Assumed to Contain Fire IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237E7231998-06-0202 June 1998 EN-98-042:informs Commission That NRC Will Issue Confirmatory Order Modifying Licensee (Effective Immediately) & Exercise Discretion IAW Section VII.B.6 of Enforcement Policy Not to Issue NOV IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20247M4751998-05-18018 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Combustible Matl,Specifically,Wood Scaffold Installed & Remained in safety-related 2A Isolation Valve Cubicle from Feb 1997 Until April 1998,unattended & W/O Evaluation IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20217A8451998-04-20020 April 1998 Notice of Violation from Insp on 980214-0321.Violation Noted:Licensee Updated UFSAR to Reflect New LOCA Radiological Analysis,Which Increased Thyroid Dose to CR Operator,W/O Obtaining Prior NRC Review & Approval ML20217B5581998-03-24024 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Fire Hose Stations Listed in Addendum 3 of Procedure OPGP03-ZF-0018 Not Operable When Equipment in Area to Be Protected Required to Be Operable by TS IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection ML20202D7701998-02-12012 February 1998 Notice of Violation from Insp on 980112-15.Violation Noted: Radiation Workers Who Were Likely to Receive Occupational Dose in Excess of 100 Mrems Per Yr Were Not Informed of Presence of Airborne Radioactivity IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3461997-12-22022 December 1997 Notice of Violation from Insp on 971112.Violations Noted: Programmatic Calculation Deficiencies,First Identified in Observation 92-01-13 Not Promptly Corrected 1999-09-03
[Table view] |
Text
. .
. .
. .
.
,
.
APPENDIX U. S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-498/88-34 Operating License: NPF-76 50-499/88-34 ConstructionPermit(CP): CPPR-129 Dockets: 50-498 CP Expiration Date: December 1989 50-499 Licensee: Houston Lighting & Power Company (HL&P)
P.O. Box 1700 Houston, Texas 77001 Facility Name: SouthTexasProject, Units 1and2(STP)
Inspection At: STP, Matagorda County, Texas Inspection Conducted: May 1-31, o I Inspectors: [_/ ,
--
J. E. Bess, Resident Inspector, Project
?/r/ry D6te l Section D, Division of Reactor Projects )
/
!M s ,/c/rr Date l
[D.L.Section Garrison,ResidentInspector, D, Division of Reactor Projects Project Other Assisting Personnel: J. P. Clausner, French Commissariar A L'Energie 1 Atomique, Institute De Protection Et De Surete I Nucleaire I
// / /
Approved: <w- 7////97 Ti. L. Constable, Project Section D, Division of Date I Reactor Projects l 8808100191 880721 PDR ADOCK 05000498 G PNV
--
-. - . _ _ . . _ _ . . , . . . . _ - _ . _ _ . , _ _ _ _ _ _ _ . . _ - - . ,
. .
.
.
Inspection Summary Inspection Conducted May 1-31, 1988 (Report 50-498/88-34)
Areas Inspected: Routine, unannounced inspection included loss of offsite !
'
power, bottom mounted instrumentation, observation safety verification, engineered safety feature system walkdown, surveillance observations, security observations, radiological protection observation, and security fence constructio Results: Within the areas inspected, no violations were identifie Inspection Conducted May 1-31, 1988 (Report 50-499/88-34)
Areas Inspected: Routine, unannounced inspection included incore thermocouples and security fence constructio Results: Within the areas inspected, no violations were identifie '
J
' '
. _.. _ __ - ..-- __ ._ - __ - ___ __ _ . _ _ ___ ,_ __ _ .-
. .
. .
.
.
DETAILS Persons Contacted
- P. Evans, Licensing Engineer
- R. Whitley, QA Specialist
- J. D. Green, Manager, Inspection and Surveillance
- S. M. Dew, Manager, Operations Support
- A. Randlett, Manager, NSD
- R. Wisenburg, Plant Superintendent Unit 1
- L. Parkey, Plant Superintendent Unit 2
- L. Giles, Plant Operations Manager Unit 2
- M. Polishak, Project Compliance
- K. M. O'Gara, Project Compliance
- M. A. McBurnette, Operations Support Licensing Manager
- S. M. Head, Supervising Licensing Engineer
- M. A. Ludwig, Manager, Operations Maintenance Division
- J. T. Westermeier, General Manager
- S. L. Rosen, General Manager, Operations Support In addition to the above, the NRC inspectors also held discussions with various licensee, architect engineer (AE), constructor and other contractor personnel during this inspectio * Denotes those individuals attending the exit interview conducted on June 1, 198 . Plant Status
'
STP Unit I was shut down on May 2,1988, as part of a planned outage to support thimble tube inspection and essential cooling water (ECW) fitting replacements. HL&P began the outage a day early because of operabilit problems with the steam generator power operated relief valves (PORVs) On May 21, 1988, at 5:38 p.m., Unit 1 was taken critical with plans to increase power to 30 percent (reactor) and perform the Loss of Offsite Power Test (LOOP). On May 25, 1988, at approximately 11:35 p.m., a turbine trip occurred during the installation of a teinporary modification for the removal of the Excess Cooldown Logic which was being implemented due to a Technical Specifications (TS) change. The trip appeared to be the result of a 24-position switch used in the testing of the logic circuit having sticking / dirty contact On May 26, 1988, the LOOP testing was performed satisfactoril Two 480VAC electrical breakers, not part of the acceptance criteria for the LOOP test, failed to reclose after the emergency diesel generator starte The primary systems functioned as designed to maintain natural circulation conditions in the reactor coolant system for 30 minutes. Also, during the performance of the LOOP test, the main feedwater (MFW) pump turbine shaft
- - .- -_ .
. .
. .
. .
faile The MFW turbine was extensively damaged and the condensate' system was contaminated with oi Investigations are in process by the licensee to determine the cause of the failure. Plans are being initiated to replace the damaged Unit 1 pump and turbine with similar components from Unit 2. The secondary systems are being drained and cleaned due to-the oil contamination. At the end of the inspection period the plant was-in cold shutdown (Mode 5).
'
STP Unit 2 is 95 percent complete. Preoperational testing is in progres ;
Hot Functional testing is scheduled to begin in mid-July 198 . Loss of Offsite Power Test - Unit 1 (725828)
This inspection was conducted to determine whether the test was consistent
, with regulatory requirement guidance, licensee commitments, and TS.
'
The NRC insp'ectors reviewed Procedure IPEP04-ZY-0034, "Loss of Offsite Power Test, Revision 4, dated May 4, 1988. This review determined that the procedure contained the following acceptance criteria: the turbine ,
and reactor trip and the emergency power supplies provide adequate power to maintain the plant in a stable, hot standby condition for 30 minutes .
following a LOO The procedure also required that personnel be I positioned to monitor the status of emergency equipment.
I The NRC inspector observed the performance of the test on May 25, 198 A pretest briefing for all involved personnel was held by the licensee prior ;
to the test. The electrical load transfers were accomplished, the
^
'
emergency diesels started and loaded satisfactorily, steam dumps operated properly, plant pressure control, pressurizer level control and steam generator level control appeared satisfactory. Natural circulation was ,
attained within approximately nine minutes. Data was collected for the required 30 minutes and plant recovery was in accordance with procedure ,
There were a number of equipment problems encountered, particularly during f the recovery phase. Two significant equipment failures occurred during ;
the early stages of the tes Steam Generator Feed Water Pump No. 11 oversped and was destroye Two.480VAC electrical breakers failed to
,
'
reclose on their respective busses. None of the problems or equipment failures affected the test acceptance criteria or the safe shutdown of the plan No violations or deviations were identified during this part of the '
inspectio ' Bottom Mounted Instrumentation (BMI) Thimbles (93702)
In order to comply with a commitment as stated at the December 14, 1987, HL&P/ Westinghouse /NRC meeting held in Washington, !
{
tt
.
_ - _ _ - ___.________________.m____._________.________._______________..____-___________-_____-.____________.____.-__._s___m_m_ _ _ . _ _ ___.._____..-___m_m__ _ _ _ _ . _ __
__ _
, ,
. .
,
. .
(Letter ST-HL-AE-2458, dated January 5,1988), the licensee shut down Unit 1 on May 2,1988, to perform, among other activities, an eddy current (EC) inspection of the thimble tubes after 15 weeks of four. pump operatio As a result of this eddy current inspection of the thimble tube wall thicknesses on May 9,1988, the licensee informed the NRC that 22 of the 58 thimble tubes had indications that the wall thickness had been reduced from 12 percent to 58 percent of the original wall thicknes EC data for those 22 thimble tubes indicated that 19 have wall wear around the flow limiter areas and four include indications of wear below the lower core plate. Three other thimble tubes indicate wear below the lower ,
core plate only, System Description BMI thimble tubes are used to remotely position miniature fission chamber detectors in retractable guide thimbles to provide flux mapping of the reactor core. The retractable thimbles, into which the miniature detectors are driven, are inserted into the reactor core through conduits which extend from the bottom of the reactor vessel down through the concrete shield area, and then to a thimble seal plate. Their distribution over the core is nearly uniform with about the same number of thimbles located in each quadran Thimbles are closed at the leading ends, are dry inside, and serve as a pressure barrier between the reactor vessel and the contair. ment atmosphere. During reactor operation, the retractable thimbles are stationary. They are extracted downward from the core during refueling to avoid interference within the core.
1 Unlike European plants and other Westinghouse designed reactors, STP has no isolation valves installed on the BMI tubes. Leak detection devices and a radiation alarm in the BMI area should detect any leakage from BMI tubes. A leak would require a reactor shutdown and depressurization of the primary coolant system to facilitate repair One charging pump is capable of maintaining pressurizer level in the '
event of a thimble tube ruptur During the first refueling of Unit 1 and prior to initial fuel load i of Unit 2, the licensee will install remotely operated isolation valves on the BMI tube Backgrour d Incore thimble tube leakage and wall thinning problems were found on >
Westinghouse reactors with 14-foot cores operating in Europe. The cause of the wear on the thimble tubes is believed to be flow induced vibrations of the thimble tubes that causes wear where tubes contact reactor core compound l
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ .
'
I
. .
.
Based on test results performed in France, it was found that the mass flow around the thimbles is the cause of thimble vibrations. In order to reduce the flow energy around the thimbles, different guides with reduced clearance and larger guidance lengths were designa One particular model comparable to the one installed at STP, but using a spring instead of a bellows, showed a high efficiency to reduce the thimble excitation. However, because of questions regarding the long-term spring reliability, a simple long guide without any spring was tested. This guide, used with thicker wall thimble tubes, was found to have an efficiency adequate to obtain an acceptable vibration level. They were installed on several plants where they initially showed satisfactory operation. Leakage through a thimble tube wall was detected at the end of March 1985 in Paluel Unit 1(French). The investigations revealed that all the thimble tubes that exhibited relatively significant wear were located in the discontinuity zones where the thimble tubes passed through the lower core vessel component In response to requests for additional information from the NRC regarding the Paluel problem (Final Safety Analysis Report (FSAR)
Question Nos. 492.6N, 492.7N, and 492.8N) the licensee (Letter ST-HL-AE-1339, dated February 3,1986) stated that the failure of the Paluel thimble tubes was not attributed to the 14-foot core but to the use of a more flexible thimble and other changes to thimble guide tube configuratio Over the last year, it has come to the NRC's attention that several licensees in the United Sates had detected thinning of the incore instrumentation thimble tubes as a result of flow-induced vibration On September 16, 1987, the NRC issued an Information Notice (IEN) 87-44 to alert licensees that Westinghouse reactors had a potential for problems from thimble tube thinnin On October 27, 1987, the NRC was infonned that leakage had occurred through a BMI thimble tube at the Belgian plant Tihange 3 after approximately 16 weeks of operation. Since the BMI column gap, BMI thimble and flow limiting devices are essentially identical in configuration to that of the STP, the NRC requested that the licensee implement a program to monitor the potential problem. The NRC met with several European representatives to gather information on the French and Belgian plant The flow limiting devices had been installed at STP prior to the first fuel load and on the Belgian plants (Tihange 3 and Doel 4)
during their latest refueling. The purpose of the devices is to reduce the flow energy around the thimble tubes by providing reduced clearances and longer length for guidance between the lower core plate and the bottom of the fuel assembl Prior to the installation at Tihange 3, a modification to the flow limiters was performed due to interfering fillet welds used to secure
. -
. ,.
. -
.
, i
. .
the thimble guide to the lower support plate. After this modification, the limiters were installed with a long handled tool and the mechanical fit was verified by camera inspection under wate It was thought that this difference between Tihange 3 and STP, Unit 1, could have led to the thimble tube wear at Tihang The licensee committed to perform a baseline eddy current inspection at STP, Unit 1, prior to initial criticality. This inspection was conducted on December 18-24, 1987, after approximately four weeks of '
low temperature reactor coolant pump operation. No indications of thimble tube degradation were apparen On April 27, 1988, the licensee informed the NRC that the Belgian-plant Doel 4, which is a sister unit to Tihange 3, had recently experienced two thimble tube leaks. The Belgian licensee conducted an eddy current inspection in April 1988 during the refueling outage and found that all thimble tubes except one exhibited wea Based on these results and the Tihange 3 experience a decision was
'
made to remove the flow limiters from those plant Second Eddy Current Inspection Results On STP May 4-5, 1988 The licensee shut down Unit 1 on May 2,1988, to perform an eddy current inspection of the thimble tubes after 11 additional weeks of four pump operation at RCS normal operating temperature (i.e. above 560*F and pressure at 2235 psig).
The full flow duration was 77 days (cumulative period) including 31 days of consecutive operation. This represents about 15 weeks of
'
full flow operation, including approximately 4 weeks of low terperature reactor ccolant pump operation since the first eddy current inspection on December 18-24, 198 L This duration can be compared with the 16 weeks of operation at the Belgian plant Tihange 3 when leakage through a thimble tube wall
,
occurred in October 198 ,
.
On May 4, 1988, the licensee proceeded to inspect the Unit 1 thimble tubes. This second eddy current inspection was conducted during 2 days by Westinghouse personne On May 4, 1988, the licensee completed the data acquisition which was conducted on 15 thimble tubes and a first analysis showed to indication of significant wear. Only threa mi w ^dicatio n close ;
to the minimum detectable limit (about 10 pern 4 were 'aun On May 5, 1988, the licensee completed the da on the 58 thimble tubes. This same day the NRC met +
,
- -- , n---,- ,-- ,, ,, - - , . - m---, .--y ,---------o,,e -
-,e,-4 9 ,
-p3, gw m
,
.
. .
.
,
. .
representatives to obtain additional technical information relative to the eddy current method used to-detect potential wall thinning on thimblo tube ThisECmethodutilizedthreedifferentfrequencies(60,140,and300 KHz). Each of these three frequencies was analyzed separately. The three frequencies were mixed together to cancel potential false signals from core components and leaving only those signals induced by wear (wall thinning). On May 9, 1988, the licensee informed the NRC that the results from data analysis revealed that a total of 22 thimble tubes exhibited wear indications from 12 to 58 percent of wall thicknes Nineteen of those 22 thimble tubes indicated wall thinning in locations around the flow limiter areas. Four thimble tubes indicated wear below the lower core plate. Three other thimble tubes indicated wall thinning only below the lower core plat The wear observed by eddy current inspection on the 19 thimble tubes around the flow limiter areas was as follows:
. 5 thimble tubes at 12 percent reduction in wall thickness
. 2 thimble tubes at 15 percent reduction in wall thickness
. 1 thimble tube at 16 percent reduction in wall thickness
. 5 thimble tubes at 20 percent reduction in wall thickness
. I thimble tube at 25 percent reduction in wall thickness
. I thimble tube at 28 percent reduction in wall thickness
. 1 thimble tube at 36 percent reduction in wall thickness
. 2 thimble tuber at 40 percent reduction in wall thickness
. I thimble tube at 58 percent reduction in wall thickness STP, Unit 1, has found no indications of wall thinning on the upper
- part of the thimble tubes, Assessment Based on the results above, it is possible to compare STP, Unit 1, and 1
'
Tihange 3. Doel 4 which is equipped with thicker wall thimble tubes, hence less flexible, showed that a different wear rate had occurre Neither at STP nor at Tihange 3 was it possible to determine any preferential wear zones. The thimble tube wear locations were
,
randomly spread throughout the cor l The licensee indicated that at STP the kinetics of the phenomenon
differ from those at Tihange 3 where leaks indicative of thimble ;
.
tube failures occurred af ter a 16-week operating perio i
'
During flux map performances in the European reactors, miniature probes occasionally became jammed in some thimble tubes. This was
_ _ - _ _ - - _ - _ - _ _ _ _ . _ _ _ _ _ _ - - _ _ _ - - - _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ _ _ - - - - _ . _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
, .
.
. .
. .
caused by circular stricture due to primary pressure on thimble tubes thinned by external wear. This should be considered at STP which is still in startup testing phase during which numerous flux maps are taken, Licensee Comitments On May 17, 1988, the NRC met with the licensee and Westinghouse in Washington During this meeting, the licensee gave a detailed presentation and explained the different recomendations taken into account to restart and operate the plant.
- Based on the given information, the NRC authorized the licensee to operate STP, Unit 1, for an additional 16 weeks of four reactor coolant pump operation. Further, the NRC will require the licensee to perform an eddy current inspection if, after a minimum of 8 weeks of full operation, the licensee shuts the plant down for a period long enough to perform this inspectio The licensee will also investigate the advantages of installation of thicker walled thimble tubes in Unit 1. If thicker walled thimble tubes resolve the wear problem, they will be installed during the first refueling on STP, Unit 1, and if proven successful they will also be installed on STP, Unit No violations or deviations were identifie . Operational Safety Verification - Unit 1 (71707)
The objectives of this inspection by the NRC inspectors were to conduct reviews and observe selected activities to verify that plant operations were performed in accordance with the requirements established under 10 CFR Part 50 administrative procedures and the TS. The NRC inspectors i observed the activities in the control room on a daily basis to verify the following:
. The control room was free from distractions such as nonwork-related reading material ;
. Operability of reactor protective systems and engineered safety l component l
.
Maintenance work requests (MWR) were written for equipm;3t/ components j out of servic ,
i
. Operators were adhering to approved procedures for ongoing !
activities, j
. Proper control room staff is maintaine . Operations behavior is commensurate with control room operations, i i
l
. .
.
.
,
.
,
No violations or deviations were identifie . Engineered Safety Feature (ESF) System Walkdown - Unit 1 (71710)
The NRC inspectors conducted a walkdown of the accessible portions of Train "A" of the Component Cooling Water (CCW) System to independently verify the operability of the system. ' A review was performed to confirm that the licensee's system operating procedure matched plant drawings and the as-built configuration. Equipment condition, valve and breaker positions, housekeeping, labeling, permanent instrument indication and calibration, and operability of support systems essential to actuation of the ESF system were all noted as appropriat The NRC inspector identified the following items to licensee management:
- . There was no permanent ID tag on Valve CC-000 . Small oil leak under the hand wheel of Valve CC-M0V-023 . The label on Breaker E1A1E2 indicated that this breaker supplies power to CCW charging pumps supply motor operated valve (MOV). The CCW Electrical Lineup stated that this breaker supplies power to charging pump cooler . The label on Breaker E1A2B2 indicated that this breaker supplies power to Cooling Fan 10A. CCW Electrical Lineup indicated that the referenced breaker should supply power to Cooling Fan 11 . The name plate for Seal Water Heat Exchange 1A is inscribed by the alpha-numeric identifier 2R171NHX104A. Piping and Instrumentation Diagram (P&lD) SR209F05020, Revision 9 identifies the heat exchange by alphanumeric identifier 4R171NHX104 Following the discussion of these concerns with licensee management, aggressive actions were implemented to identify other discrepancies of this kind including the resolution of the specific concerns identified in '
this repor No violations or deviations were identified.
' Surveillance Observations - Unit 1 (61726)
The NRC inspectors observed selected portions of surveillance testing and ,
< reviewed completed data packages to verify if TS requirements are being met for safety-related systems and components. The following surveillance ,
- tests were observed
- .
1 PSP 03-SI-0013 Revision 1, "Accumulator Isolation Valve
Verification" )
i
!
l
i
. . .
. . * ;
. .
.
. IPSP03-SI-0014 Revision 1. "Emergency Core Cooling System Valve Checklist"
. 1 PSP 03-SI-0017, Revision 0, "Containment Spray Valve Checklist" The NRC inspector verified the following-items during the inspection:
, The testing was performed by' qualified personnel using approved procedure . Removal and restoratian of the affected systems were accomplishe . The surveillance testing was completed at the required frequency per TS requirement ,
. Test data was accurate and complet No violations or deviati3ns were identifie , Security Observations - Unit 1 (71881) i The NRC inspector verified that selected physical security activities were being implemented by direct observations of the following items:
. The security monitors (guards) in the secondary (SAS) and central 1 (CAS) alarm stations were properly carrying out their dutie . No breaches or weakness of vital area barriers were identifie . The protected area (PA) was well maintained and was not compromised by objects that could be used to scale the barrie '
. Personnel within the PA displayed their identification badge .
. Persons and packages were observed to be properly cleared and checked before entry into the P . Compensatory measures were observed to be employed when equipment failure or impairments made them necessar ,
No violations or deviations were identifie , Radiological Protection Observation - Unit 1___(71709)
The NRC ins ector verified that selected activities of the licensee's radiologica protection programs were implemented in conformance with r regulatory requirements. The activities listed below were observed:
. Radiation work permits contained the appropriate information to ,
ensure that work was performed in a safe and controlled manne ,
_,
._.-.-._,m -. - _ , _ . -. _ _ _ . . . _ - _ - _ , , _ - - . - - , . - _ , . , , , _ , , _ , , - - _ . - - _ _ -_
,. o
'
.
~
. .
. Radiation and contaminated areas were properly posted and controlled based on the activity levels within the are . Personnel frisked themselves properly prior to exiting radiation protected areas (RPA).
. Personnel in the RPA were wearing proper monitoring equipment (ME)
and the ME was properly located on the individual No violations or deviations were identifie . Incore Thermocouples - Unit 2 (52053)
An inspection of the incore thermocouple system was performed to verify conformance to the drawings and specifications. The incore thermocouple system coroists of 50 chromel-alumel sheathed thermocouples. Wiring extends from the incore housing through the vessel head and proceeds to the thermocouple junction boxes at elevation +44'. Twenty-five thermocouples (1-25) are included in Train "A" and 25 (26-50) in Train "C."
These are placed symmetrically to Westinghouse design Drawing 20-322-03, Revision The NRC inspector had previously inspected these items as they were installed on the vessel head cover. This inspection included the installation from the refueling bridge to reference boxes A211TB002 and C211B00 The items were inspected for correct radius, indication of damage, and proper i.ermination. The routing and design is shown on Drawing SE20-9E-2516, Revision 5; the terminations were in accordance to the Specification SE530E51035, and Standard Site Procedure (SSP) 26, Revision 2. The thermocouple wiring from the reference boxes A2IITB002 and C2118003 are then routed through conduit and cable trays to the instrument penetrations in the containment wall per Drawing SE50-9E-59508, Revision 1. The workmanship meets the requirements of the drawings and procedure The NRC inspector reviewed the startup test procedure "scheme verification" SG-E-03, Revision 8. for inclusion of design attributes during checkout and testing. The thermocouples require a continuity check and will be calibrated tc ambient temperature in the reactor containment building. This testing had not been performed; however, the procedure appeared adequate to perform the test and record the test result No violations or deviations were noted during the inspectio . Security Fence Construction - Unit 2 (35060)
An inspection of the construction of the Unit 2 protected area security fencing was conducted by the NRC inspector in order tc compare the construction practices with the specification requirements. The fence barrier is classed as a nonsafety-related item, a'though it is important to plant physical securit . - . .
.
. .
,
. .
13 ,
,
The fence was inspected to the requirements of Specification 9Y280YS1006, Revision 4 Field Change Request HXBC-03924 of May 9, 1988, and Drawings 9Y28-0Y-36066, Revision 11; 9Y28-0Y-36067, Revision 6; 9Y38-0Y-36068, Revision 5; and 9Y28-0Y-36069, Revision The NRC inspector found that the fence meets the general requirements of 10 CFR Part 73, "Physical Protection of Plants and Materials." However, ;
some of the construction details of the specification were not adhered t The following are the items found to be deficient:
. Fence structural poles - These poles are required to meet the requirements of American Society for Testing and Materials (ASTM)
A120; however, the vendor marking indicates they were manufactured to ASTM 53, which is a similar specification. It was noted that the '
Unit 1 poles were marked ASTM A120/A5 , Post foundation not crowned - The specification requires that the :
'
posts be set and the concrete foundation be raised and crowned to
,
shed water and prevent deterioration at the ground line. It was :
found that most of the posts were not crowned but topped off at ground leve .
. Keys in extension arms - On top of the fabric fence, extension arms are attached to the poles. These are set at a 45 degree angle and i three strands of barbed wire are affixed in slots; the wire in the slots is required to be fastened with steel wire keys. The vendor supplied extension arms with slotted holes that do not provide for positive lockin P These three concerns are considered to be an Open Item (499/8834-01)
and will be further reviewed by the Region IV security sectio !
All other attributes, as described in the design documents, were found to be '
satisfactor . Exit Meeting (30703)
,
The NRC inspector met with licensee representatives (denoted in paragraph 1) on June 1,1988, and summarized the scope and findings of the inspection. Other meetings between NRC inspectors and licensee management were held periodically during the inspection to discuss identified concern [