Discusses Insp Repts 50-498/88-46 & 50-499/88-46 on 880711-15 & 25-29 & 0808-12 & Forwards Notice of Violation. Enforcement Conference Conducted by Telcon on 880930 to Discuss Inadequate Fire Watches Under Review
ML20206G491
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20206G494 List:
References
NUDOCS 8811220297
Download: ML20206G491 (3)


Text

,

, ,, ,

,

. NOV I 51988 In Reply Refer To:

Dockets: 50-498/88-46 50-499/88-46 Houston Lighting & Power Company ATTN: J. H. Goldberg, Group Vice President, Nuclear P.O. Box 1700 Houston, Texas 77001 Gentlemen:

SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-498/88-46; 50-499/88-46)

This refers to the inspection conducted during the period July 11-15 and 25-29, and August 8-12, 1988, at the South Texas Project Units 1 and As described in hRC Inspection Report 50-498/88 46; 50-499/88-46, the failure of your maintenance staff to replace E1011 battery room duct heater panel bolts following completion of a maintenance work request appeared to be in violation of NRC requirement Consequently, an enforcement conference was conducted by telecon on September 30, 1988, to discuss this issue as well as another apparent violation concerning inadequate firewatches which is under review and will be addressed in a separate letter. The subject of the failure to properly complete maintenance work requests is addressed in the attached Notice of Violatio The NRC was ariginally concerned that failure to properly complete the maintenance work request could have made a station bcttery susceptible to damage in the event of a seismic event. Your analysis subsequently showed that the hinges on the battery raom duct heater panel door provided adequate seismic support. However, this event demonstrates the importance of restoring conditions to normal following completion of maintenance work requests. Your corrective actions should assure generic aspects of this violation are properly addresse You are required to respond to this violation, in writing, in accordance with the provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2 Title 10, Code of Federal Regulations. Your response should be based on the specifics contained in the Notice of Violation enclosed with this lette *RIV:RI *C:0PS *D:0RS *E0 0:d1Pthd RBVickrey/ld JEGagliardo JLMilhoan GFSanborn LjC'allan

/ /88 / /88 / /88 / /88 si/16/88

  • previously concurred 0811220297 001115 l

PDR ADOCK 05000490

'

G FNU l [Eol llI o

_ _ _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _______ ___ ___ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

. .

.

Houston Lighting & Power Company -2-The response directed by t'..is letter and the accompanying Notice is not subject to the clearance procedures of the Office of Management and Budget as .

required by the Paperwork Reduction Act of 1980, PL 96-51 l Should you have any questions concerning this inspection, we will be pleased I to discuss them with yo

Sincerely, (

'OrigInst Signn! Dy [

A.D. Beach i

.  !

L. J. Callan, Director Division of Reactor Projects

Enclosure: '

Appendix - Notice of Violation cc w/ enclosure:

Houston Lighting & Power Company ATTN: M. A. McBurnett, Manager Operations Support Licensing P.O. Box 289 Wadsworth, Texas 77483 Houston Lighting & Power Company ATTN: Gerald E. Voughn, Vice President Nuclear Operations P.O. Box 289 Wadsvorth, Texas 77483 touston Lishting & Power Company ATTN: J. 1. Westermeier, General Manager South Texas Project P.O. Box 289 Wadsworth, Texas 77483 Central Power & Light Company ATTN: R. L. Range /R P. Verret P.O. Box 2121 Corpus Christi, Texas 78403 City of Austin Electric Utility ATTN: R. J. Miner, Chief Operating Officer 721 Barton Springs Road Austin, Texas 78704 Newman & Holtzinger, ATTN: J. R. Newman, Esquire 1615 L Street, Washington. 0.C. 20036

__ .

. .. .

!

.

Houston .',ighting & Power Company -3-Houston Lighting & Power Company ATTN: S. L. Rosen P.O. Box 289 Wadsworth Texas 77483 Houston Lighting & Power Company ATTN: R. W. Chewning, Chairman Nuclear Safety Review Board P.O. Box 289 Wadsworth, Texas 77483 City Public Service Board ATTN: R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296 -

Houston Lighting & Power Company ATTN: Licensing Representative Suite 610 Three Metro Center Bethesda, Maryland 20814 Texas Radiation Control Program Director bec to DMB (IE01)

bec distrib. by RIV:

DRP RRI-0PS r SectionChief(02P/U) DRS MIS System RPB-DRSS Lisa Shea, RH/ALF RIV File R. Bachmann OGC RSTS Operator G. Dick, NRR Project Manager Project Engineer, DRP/D RRI-CONST R. Evans R. Vickrey J. E. Gagliardo G. Sanborn

,

,

__ _- - - _ - - - - - ---_- -_ _-_ -------_ - __- _ _------_ - - _ - - _ - - - - - _ - - - - _ - _