IR 05000498/1988042

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-498/88-42 & 50-499/88-42
ML20247B416
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/24/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
References
NUDOCS 8903290386
Download: ML20247B416 (3)


Text

. . - . - , - . - .

-

fs Vi

'

'

,, j ,.
= .

<

l MAR 2(1989 In Reply Refer To:" .

'

Dockets: '50.498/88-42 .

'50-499/88-42 1

Houston Lighting' &. Power Company.-

-ATTN: LJ. H. Goldberg, Group:Vice

.

President, Nuclear; P.0. Box 1700- ,

,.

' -

Houston,. Texas.;77001-

'

- Gentlemen:

Thank 'you for your letter of . September 14, 1988,. in response to our'-

letter dat'ed August 11,;1988. We_have reviewed your reply and find it responsive to theiconcerns raised in.our letter. - We.will review the

- implementation of your corrective actions during a future inspectio

Sincerely,

.

taaeh,  ;

.

, L. J. Callan, Directo .

>

'

Division of Reactor-Projects cc:

Houston Lighting & Power Company

' ATTN: ..M. A. McBurnett, Manager

' Operations Support Licensing P.O. Box'289~

Wadsworth,-. Texas 77.483

Houston Lighting & Power Company ATTN
Gerald E. Vaughn, Vice President Nuclear Operations 4

P.O. Box 289 Wadsworth,. Texas 77483 (cc's continued)

a

/d

. RI ' PS:RPB

- Te sir C:ds,:RPB JEvWett C:k BMurray C:RPS/

Holler l :

Ph 3 Q1 an 3/g /89 3/f/89 3/g4 /89 3pA/89 3/ f'g'89 st J

PDC

_ _ _ - _ - - - - _ _ _ _ _ _ _ _ _ - _ ..- _ _ _ - - - - - - _ _ - _ _ _ _ _ - _ _ _ _ ._ - _- . _ _ _ - _ . - - - _

__ _ __

- < -

.

Houston Lighting & Power Company -2-Houston Lighting & Power Company ATTN: J. T. Westermeier, General Manager South' Texas Project P.O. Box 289 Wadsworth, Texas 77483 Central Power & Light Company ATTN: R. L. Range /R. P. Verret P.O. Box 2121 Corpus Christi, Texas 78403-City of Austin Electric Utility ATTN: R. J. Miner, Chief Operating Officer 721 Barton Springs Road Austin, Texas 78704 Newman & Holtzinger, ATTN: J. R. Newman, Esquire 1615 L Street, Washington, D.C. 20036 Houston Lighting & Power Company ATTN: S. L. Rosen P.O. Box 289 Wadsworth, Texas 77483 Houston Lighting & Power Company ATTN: R. W. Chewning, Chairman Nuclear Safety Review Board P.O. Box 289 Wadsworth, Texas 77483 City Public Service Board ATTN: R. J. Costello/M. T. Hardt P.O. Box 1771 San Antonio, Texas 78296 Houston Lighting & Power Company ATTN: Licensing Representative Suite 610 Three Metro Center Bethesda, Maryland 20814 Texas Radiation Control Program Director

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

-_ -_--

-

'

, .. ..

Houston Lighting & Power Company -3-bec to'DMB (IE35)

bec-distrib. by RIV:

R. D. Martin, RA DRP

' Resident Inspector-0PS G. L.. Constable, Section Chief (DRP/D) i RPB-DRSS i

. MIS System i RIV File Lisa Shea, RM/ALF

'RSTS Operator R. Bachmann, 0GC DR Inspector Section Chief B' Murray

.

R. L. Bangart R. E. Hall'

O. M. Hunnicutt

'

G. Dick, NRR Project Manager W. D. Travers, NRR I

i

) ;

i

, <

_ _ _ _ _ _ . _ _ _ _ _ _ _ .

.

, ).,15p 3M

  • '

The >

compar y P.O. Box 1700 Houstc,n. Texas 77001 (713) 228 9211 Houston Lightingk Power -...m... , -

'

September 14, 1988 ST-HL-AE-2792 File No.: G02.ph w E g 7p' 7.Sl

10CFR2.201 5 - '

I Cr r

"

r U. S. Nuclear Regulatory Commission u '_ _ ,_

Attention: Document Control Desk Washington, DC 20555 l -

.. _

South Texas Project Electric Generating Station Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Response to Deficiencies (498/8842-01, 02, 03; 499/8842-01, 02, 03)

..

Houston Lighting & Power Company has reviewed Inspection Report 88-42 dated August 11, 1988, and submits the following responses to the identified deficiencie ) Deficiency 498/8842-01; 499/8842-01:

The control room communicator was not effective in his function During the site evacuation, the communicator did not transmit instructions to the evacuees. This resulted in delayed evacuation and accountability of site personne +'

Plan and Schedule:

The procedures governing the use of the Quintron communications consoles will be modified to provide accurate operating instruction The communicators will be retrained on the change Completion of the corrective actions is expected by December 31, 1988. The effectiveness of this training will be monitored in drills and exercises through the year and will be demonstrated to the NRC during the 1989 Graded Exercise to clear this deficienc ) Deficiency 498/8842-02 499/8842-02:

The second mechanical repair team dispatched to repair the secondary purge exhaust was delayed between 1:32 p.m. and 2:15 This delay was due to the inability of the health physics technicians to obtain personnel exposure history required for higher dose authorizatio ___ ..$ 0 0 0-&-k A(I-V

_

'

A Subsidiary of Houston Industries Incorporated NL.88.273.02

.

- _ - - - -

___- .- -__ -. ._

,

..

~

',, ;.. 'l' '

Houston Lighting & Power Company , )

i

..- J

,

ST-HL-AE-2792' l

,

File No.: G02.04 Page 2 Plan and Schedules The procedures will be modified to allow a more expeditious determination of emergency dose extensions. Those individuals who

.will need to use the procedure will receive training on the

-

modification Completion of the corrective actions is expected by December 31, l 1988. The effectiveness of this training will be monitored in drills and exercises throughout the year and will be demonstrated to the NRC during the 1989 Graded Exercis . i 3) Deficiency 498/8842-03; 499/8842-03:

!

Evacuation of personnel after sounding the site evacuation alarm was slow and occurred in two groups. The licensee staff did not make I

announcements throughout the site giving directions to evacuees. As a consequence, site personnel stayed la a hazardous environment for a longer' time.than necessar .

Plan and Schedule:

'

i In addition to the corrective actions described in respor.se to j

'

Deficiency 498/8842-01; 499/8842-01, the effectiveness of these corrective actions will be evaluated during subsequent drills / exercises throughout the year and will be demonstrated to the q NRC during the 1989 Graded Exercis If you should have any questions on this matter, please contact i Mr. M. A. McBurnett at (512) 972-853 I d'Y l G. E. Vaughn

Vice President Nuclear Plant Operations l_

l GEV/PLW/n1 q l

NL.88.273.02 ,

1 \

- __ _ _ _ __ . _ _ _ _ _ _. __ ._ . _ _ _ _ . _ .

. _ - _

-r

.

<s t .

. .~

Houston Lighting & Power Company

.

  • -

ST-HL-AE-2792 File No.: G02.04

. Page 3 cc Regional Administrator,' Region IV Rufus S. Scott Nuclear Regulatory Commission Associated General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 1700 Houston, TX 77001 George Dick U. S. Nuclear Regulatory Commission INPO Washington,'DC 20555 Records Center 1100 circle 75 Parkway Jack E. Bess Atlanta, Ga. 30339-3064 Resident Inspector / Operations c/o U. S. Nuclear Regulatory Commission Dr. Joseph M. Hendrie P. O. Box 91 Be11 port Lane

Bay City, TX 7741 Be11 port, NY 11713 I..Tapia Senior Resident Inspector / Construction c/o V. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 .

J. R. Newman, Esquire Newman & Holtzinger, *

1615 L Street, ~ ~ ~ '

Washington, DC 20036 R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)

Chief Operating Officer

,

City of Austin Electric Utility I- 721 Barton Springs Road Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 08/24/88 NL.DIST

.

- . - _ . - - _ - _ - _ - - _ - _ - _ .