IR 05000498/1988059

From kanterella
Jump to navigation Jump to search
Insp Repts 50-498/88-59 & 50-499/88-59 on 880906-09.No Violations or Deviations Noted.Major Areas Inspected: Completed Preoperational Test Procedures & Review Procedures for & Observe Receipt & Storage of New Fuel
ML20154S123
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/19/1988
From: Murphy M, Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20154S114 List:
References
50-498-88-59, 50-499-88-59, NUDOCS 8810040443
Download: ML20154S123 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ ___ -_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

w

.y, c g,

-

.

APPENDIX  :

U.S NUCLEAR REGULATORY COP 9tISSION REGION I l

!

NRC Inspection Report: 50-498/88-59 Operating License: NPF-76 '

50-499/88-59 Construction Permit: CPPR-129 Dockets: 50-498  !

'

50-499 i

Licensee: Houston Lighting & Power Company (HL&P)

P.O. Box 1700 Houston, Texas 77001 Facility Name: South Texas Project (STP), Units 1 and .

Inspection At: STP, Matagorda County, Texas

.

Inspection Jonducted: September 6-9, 1988

'

.

Inspector: **' W -

9/Iq/rf M. E. Murphy, Mactor Ir25pector. Test Programs Date ,

Section, Division of Reactor Safety  !

'

l t

Approved:  % feb I W. C. Seidle, Chief Test Programs Section Date i DivisionofMactorSafety l l

Inspection Sumary

,

Inspection Conducted September 6-9, 1988 (Report 50-498/88-59)  !

l r

'

i Areas Inspected: No inspection of Unit I was conducted.

, i Results: Not applicabl !

i Inspection Conducted September 6-9, 1988 (Report 50-499/88-59)  ;

! i Areas Inspected: Routine, unannounced inspection to review completed  ;

preoperational test procedures, and review the procedures for and observe the l receipt and storage of new fue (

i Results: Within the areas inspected, no violations or deviations were I

! identifie [

esloo40443 880WJ f

PDR ADOCK 0500049S  ;

I Q PDC

' t

{

.

i

_ _ - ___ _ _ __ _ _ _ _ _ - _ _ _ - _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

--

.

o .

.

l 2 i l

DETAILS 1. Persons Contacted HL&P J. Westermeier, General Manager J. Bailey, Manager, Engineering & Licensing W. Willborn Supervisor, Project Engineering G. Parkey, Plant Superinte:1 dent D. Parker, Startup Engineer K. O'Gara, Project Compliance Engineer M. Polishak, Project Compliance Engineer NRC J. Tapia, SRI Construction, STP D. Garrison, RI Construction STP K. Kennedy, Operator Licensing Examiner, RIV All personnel listed above attended the exit interview conducted on September 9, 198 The NRC inspector also interviewed other personnel during the inspectio . Preoperational Test Result Evaluation (IP704001 The NRC inspector reviewed the following completed test procedures:

o 2-SP-P-04, "Solid State Protection System Combinational Trip Logic,"

Revision 0, dated March 23, 1988 ,

!

o 2-MS-P-02, "Main Steam Isolation Valves Logic Test " Revision 0, dated December 8, 1987 o 2-HM-P-01, "Mechanical Auxiliary Building HVAC System," Revision 1 L dated May 20, 1988 [

l This review was conducted on a copy of the as-run test procedures and included the completed data packages, the test sumary and evaluation, the quality assurance (QA) signoffs, all test exception reports, and test change notices. All test deficiencies were tracked from identification through disposition and retests, where require The review detemined that the licensee is performing an adequate l evaluation of test results and all test data meet established acceptance !

,

criteria or are properly dispositioned.

!

l

,

x,* - - _

___ _ - _ _ _ _ - _

__ _____ _ _ _- ________ ___ ___.-_________ -__ . ___ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

,.

,

. s .

.

3 i The licensee has an odequate procedure for currecting deficiencies and for retesting, if necessary. The licensee is following approved procedures ,

for review, evaluation, and acceptance of test result No violations or deviations were identified in the review of this program [

are , Fuel Receipt and Storage (IP605018) I This inspection was to determine that fuel received at the construction site was properly accepted, safeguarded, and stored in accordance with the NRC license requirement !

The NRC inspector reviewed NRC special nuclear material license (SNM) 1983 under Docket 70-3018, which was forwarded to the licensee by letter dated '

August 30, 1988. The license expiration date is August 31, 1993. The SNM '

license, in accordance with the requirements of 10 CFR 70, properly identifies the SNM custodian, describes the physical storage facility, ,

specifies security be implemented under the approved security plan, and defines the amount and composition of fuel material. Because of the  ;

inherent features associated with the storage configuration and procedural controls, the licensee has been granted an exemption from having a "

criticality alarm system. The security inspection, to confirm implementation of the licensee's security plan for safeguarding new fuel, is detailed in NRC Inspection Report 50-499/88-6 :

AtouroftheFuelHandlingBuilding(rHB)wasconductedbytheNRC [

inspector. Since the FHB .s complete, the structure adequately provides ,

for dust and debris control, flooding, and physical damage protectio !

The NRC inspector did observe and inform the licensee that the bottom of I the truck doors in the receiving bay were not sealed and, with the negative pressure in the building, could cause dust problems. The licensee representative committed to repair the door seal and stated that this item was already on their punch lis '

The NRC inspector reviewed Station Procedure OPGP03-ZL-0002, Revision 7, dated July 23, 1988, "New Fuel Receipt, inspection, and Storage." This  !

procedure defines the authorities and responsibilities of those individuals within the Nuclear Plant Operations Department involved in the receipt, inspection, and storage of new fuel at STP, Unit 2. It also ,

provides the detailed instructions for receiving, inspecting, and storin;  !

the fuel as well as instructions for completing DOE /NRC Form 741, "Nuclear r4aterial Transaction Reports."  !

r Arrival of the first STP, Unit 2 fuel was observed by the NRC inspecto ;

Health Physics coverage, security truck inspection, and truck movement  !

were handled in accordance with the procedure. Offloading of the containers in the FHB were properly accomplished. Offloading, receipt  ;

inspection, and storage of the fuel elements were satisfactorily performed  :

in accordance with the licensee's procedure !

'

- - - - - _ - _ .

r__ __ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

__ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

-

. .

,

. .. .

.

The NRC inspector made the following observations at the exit intervie During the offloading receipt inspection, and storage of fuel elements it was noted that some personnel did not always have on the required cotton gloves; however, no one was seen handling the fuel with bare hands. The licensee should consider having personnel wear shoe covers and hair covers for added cleanliness. The licensee committed to take this matter under advisement. The receipt team should operate with more procedural formality. Since these operations are highly repetitive and therefore conducive to boredom, a more formal treatment of the procedures would ensure full procedural compliance at all steps. The licensee representative agreed to evaluate their performance in this area and take appropriate actio No violations or deviations were identified in the review of this program are Exit Interview An exit interview was held September 9, 1988. At the exit interview, the NRC inspector summarized the scope and findings of the inspection. The licensee did not identify, as proprietary, any of the information provided to, or reviewed by, the NRC inspec o _

_ _ _ .

.