IR 05000416/1981046

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/81-46 on 811019-30 & Notice of Violation
ML20040E859
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/02/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20040E854 List:
References
NUDOCS 8202050453
Download: ML20040E859 (2)


Text

_ _ _ _ _ _ _ _ _ _ - _ _ _

. _ _ _. _ _ _ _ _ _ _ _ _ _ _.

_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

___ _________________ __- _ ____ _______- __________-___ __ _ -

__

et/ou>

-

-

~

.

..

..

DEC 0 21981 Mississippi Power and Light Company ATTN:

Mr. N. L. Stampley Vice President of Production

P. O. Box 1640 Jackson, MS 39205 Gentlemen:

Subject: Report No. 50-416/81-46 This refeis to the routine safety inspection conducted by Messrs. G. A. Belisle i

and P. E.

Fredrickson of this office on October 19-30, 1981, of activities authorized by NRC Construction Permit No.118 for the Grand Gulf facility.

Our preliminary findings were discussed with Mr. J. P. McGaughy, Assistant Vice President, Nuclear Production at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of seisctive examinations of procedures and representative records, interviews with

,

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license appear to violate NRC requirements.

These items and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appen-

-

dix A.

Elements to be included in your response are delineated in Appendix A.

In addition to the need for corrective action regarding these violations, the

twelve inspector followup items discussed ir, the enclosed report will require

'

resolution before an operating license is issued.

Your corrective actions on these items will be reviewed during subsequent inspections.

We have examined actions you have taken with regard to a previously reported unresolved item. The status of this item is discussed in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC's Public Document Room unless you notify this office,

,

by telephone, within ten days of the date of this letter and submit written

!

application to withhold information contained therein within thirty days of the date of this' letter. Such application must be consistent with the requirements of 2.790(b)(1).

.

!

8202050453 820129

^'

gDRADOCK 05000416 PDR.

-

-

_

_

__.

. _ _

'

'

.

DEC 0 21981

-

..

Mississippi Power & Light

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, R. C. Lewis, Director Division of Resident and Reactor Project Inspection Enclosure:

Inspection Report No. 50-416/81-46 cc w/ encl:

D. C. Gibbs, Vice President Middle South Energy, Inc.

C. K. McCoy, Plant Manager bcc w/ encl:

NRC Resident Inspector Document Management Branch State of Mississippi (

fN Y

?$bU

>(

" )

"h,tpr

"

p0,hin ki

,Fredrickson:es (CUprigit C u phy PTaylor RLewis l

11p/81 11gf81 11M/81

/ 11/t)/81 114-f81 1U ZAT1 ippt

)