IR 05000416/1981027
| ML20031E823 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/11/1981 |
| From: | Herdt A, Kleinsorge W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20031E811 | List: |
| References | |
| 50-416-81-27, 50-417-81-11, NUDOCS 8110160460 | |
| Download: ML20031E823 (10) | |
Text
_ - _ _ _.
. _. --
o UNITED STATES
1, NUCLEAR REGULATORY COMMISSION g
a REGION il
o 101 MARIETTA ST., N.W., SUITE 3100 o
ATLANTA, GEORGIA 303o3
.....
Report Nos. 50-416/81-27 and 50-417/81-11 Licensee:
Mississippi Power and Light Company Jackson, MS Facility Name: Grand Gulf 1 & 2 Docket Nos. 50-416 and 50-417 License Nos. CPPR-118 and CPPR-119 Inspection at Grand Gul Site near Port Gibson, MS Inspector:
-
M e Sign /ff'/
/_
p W EP. K
'njorge
/
D ed Approved by:
g.
/
/
A. R. 'Herdt, Section Chief Dhte/ Signed Engineering Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on July 21-24, 1981 Areas Inspected This routine, unannounced inspection involved 31 inspector-hours onsite in -the
'
areas of storage (Unit 2), reactor coolant pressure boundary piping (Unit 1),
safety related piping (Unit 1), and safety related structures (Unit 1).
-
Results
,
Of the four areas inspected, no violations or deviations were identified in thre n
areas; one viclation was found in one area (Violation - Inadequate Measures to Control Preservation of Safety Related Materials' and Equipment paragraph 5.b)..
!
8110160460 810925 PDR ADOCK 05000416 G
'PDR
-_.
.
-
-
.
--
-
_
_,_.
.
_
_
-_ -
._
.--.
--
__ -- -
-
.... ~
. _ -
-
-,
.
_
- .
, *.
j j
i REPORT DETAILS
1.
Persons Contacted i
'
Licensee Employees
- G. B. Rogers, Manager of Construction
,
- J. W. Yelverton, Field QA Supervisor
'
- H. Morgan, Construction Supervisor
- S. F. Tanner, QA Representative
- D. D. Little, QA Representative
!
- J. M. Kelley, QA Specialist i
- B. C. Lee, QA Representative
- W. M. Garner, QA Representative
,
- H. S. Pyle, QA Repesentative
,
j Other Organizations s
'
Bechtel Power Corp'. (BPC)
- J. R. Valdez, QA Engineer
,
i
- D. O. Morrow, QA Engineer
- T. C. Vincent, Field Engineer
- Attended exit interview
,
s
2.
Exit Interview The inspection scope and findings were summarized on July 24, 1981 with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the findings listed below. No dissenting comments were received from the licensee.
.
Inspector Follow-up Item-416/81-27-01, 417/81-11-01: MSRV Quencher Weld Size, paragraph Sc.
l Violation-417/81-11-02:
Inadequate Measures To Control Preservation lof
,
. Safety Related Material and Equipment, paragraph 5b.
i 3.
Licensee Action on Previous Inspection Findings
'
.Not inspected.
i
'
'
4.
Unresolved Items Unresolved' items were not identified during this inspection.
e i
k n
l m
.
.
..
.
.
.
....
.
.
.
.
..
.
.
.
.
.
.
..
..
5.
Independent Inspection Effort a.
Construction Activities (Unit 1)
The inspector conducted a general inspection of the fuel, auxiliary and reactor building to observe construction progress and construction activities such as welding, nondestructive examination, material handling and control, housekeeping and storage, b.
Storage (Unit 2)
On July 22 and 23,1981, the inspector made a general inspection of the Unit 2 construction site, the north lay down yard and the Vicksburg fabrication shop to observe material handling and control, housekeeping and storage.
The following conditions were noted:
(1) Several examples of safety related pipe spools off dunnage in contact with the ground and ground water, contrary to BPC Specifi-cation 9645-M-204.0.
(2) Numerous examples of safety related pipe spMis with missing, damaged or badly deteriorated pipe cape, entrary to BPC Speci-fication 9645-M-204.0.
(3) Numerous examples of safety related pipe spools sealed with badly deteriorated tape, contrary to BPC-Specification 9645-M-204.0.
(4) Several examples of e?fety related pipe spools containing water and debris, contrary to BFC-Specification 9645-M-204.0.
(5) Plastic covers, over two safety related valves, were melted by close proximity to heat lamps. The heat lamps were intended to prevent condensation on the valves.
(6) The licensee identified, by Condition Report (CR) 6051 that two items, of Class IE electrical equipment, were not stored in accord-ance with level C storage condition requirements.
The CR was issued on March 4,1981, and as of July 22, 1981 there had been no act;ons taken to identify or perform corrective action.
The above indicates that the licensee has not established adequate measures to control storage and preservation of equipment and materials. Failure o establish measures to control storage and preservation of materials and equipment to prevent damage is in violatten of 10 CFR 50, Appendix B, Criterion XIII.
This violation will be identified as 417/81-11-02, " Inadequate Measures to Control Preservation of Safety-Related Materials and Equipment".
. -
-
..
..
4 c.
Weld 512e (Units 1 and 2)
With regard to the above inspection, the inspector noted that the vertical welds attaching the top main support gusset plates to four Unit 2 MSRV quencher:;, as shown, on Drawing C-79-114 Revision 2, varied in length from less than five inches to over six inches. It could not be determined at the time of this inspection whether the above weld length variation was consistent with the drawing raquirements, or the design analysis.
Furtherr. ore, it could not be determined whether a similar condition exists in Unit 1.
The licensee,ndicated that they would look further into the matter.
The inspector stated that the above matter would be identified as inspector follow-up item 416/81-27-01, 417/81-11-01: "MSRV Quencher Weld Size".
Within the areas inspected no violations or deviations were iaentified except as discussed in paragraph 5b.
6.
Reactor Coolant Pressure Boundary Piping (Unit 1)
The inspector observed nonwelding and welding work activities for reactor coolant pressure boundary (RCPB) piping.
The applicable code for the installation of RCPB piping is the ASME Band PV code Section III Subsection NB,1974 Edition with addenda through summer 1974, a.
Observation -f Non Welding Work Activities.
(1) Observt t. ion of specific work activities and review of records of specif.c activities where the window of opportunity had past were condNted to determine conformance, where applicable, with the following; inspection and/or work procedures, record keeping requirements, installation specification requirements, specified materials and qualified inspection personnel.
Activity Procedure Marking BCP-Specification No.
9645-M-204 Rev.28 Handling BCP-Specification No.
9645-M-204 Rev.28 Preservation BCP-Specification No.
9645-M-204 Rev.28 Storage BCP-Specification No.
9645-M-204 Rev.28
_
_
_ _
_
_.
-
_. _,
_
__
__
~.
..
..
Activity Procedure (Continued)
Hydrotesting BCP-Specification No.
9645-M-204 Rev.28 Insulation BCP-Specification No.
9645-M-163 Rev.14 (2) The following piping " runs" were inspected for compliance with installation specifications or plans.
From To System Size Drawing FW-1 FW-3 Main Steam 28" FSK-P-194-M001.0-G Sheet 1 FW-6 FW-8 Main Steam 28" FSK-P-194-M001.0-G Sheet 1 FW-7 FW-9 Main Steam 1"
FSK-S-1077C-009-C FW-7 FW-9 Main Steam 1"
'SK-S-1077C-021C FW-1 FW-3 Main Steam 28" FSK-P-194-M001.0C Sheet 2 FW-6 FW-8 Main Steam 28" FSK-P-194-M001.0C Sheet 2 PW-25 Prob #75 Feedwater 12" 9645-M-1328J FW-9 Prob #74 Feedwater 12" 9645-M-1328J b.
Observation of Welding Work Activities The inspector observed field welding activities by inspection of weld joints and review of records associated with RCPB pipir g at various stages of weld completion. Observations were made in order to deter-
mine whether the requirements of applicable specifications, standards, work and/or inspection procedures are being met for the activities involved and in the following stages of weld completion.
Actual observation of work was not possible as the window of opportunity had past.
(1) The inspector examined records of weld joint fitup prior to welding, to determine whether identification / location, joint preparation and alignment, evidence of QC verification meet applicable procedures. The following weld joints were examined.
. -
-
.
- -
-
-
.
-
- - - -.
-
-
-
-
- -
-
.
..
.
Weld Joint Size Drawing System PW-7 1"
FSK-S-1077C-009-C Main Steam FW-8 1"
FSK-S-1077C-009-C Main Steam FW-9 1"
FSK-S-1077C-009-C Main Steam FW-7 1"
FSK-S-1077C-021-C Main Steam FW-8 1"
FSK-S-1077C-021-C Main Steam FW-9 1"
FSK-S-1077C-021-C Main Steam FW-1 28" FSK-P-194-M-001-0-C, Main Steam Sheet 1 FW-3 28" FSK-P-194-M-001-0-C, Main Steam Sheet 1 FW-6 28" FSK-P-194-M-001-0-C, Main Steam Sheet 1 FW-8 28" FSK-P-194-M-001-0-C, Main Steam Sheet 1 FW-1 28" FSK-P-194-M001.0-0C, Main Steam Sheet 2 FW-3 28" FSK-P-194-M001.0-0C, Main Steam Sheet 2 FW-6 28" FSK-P-194-M001.0-0C, Main Steam Sheet 2 FW-8 28" FSK-P-194-M001.0-0C, Main Steam Sheet 2 FW-9 12" FSK-9645-M-1328J Feed Water FW-25 12" FSK-9645-M-1328J Feed Water (2) The inspector examined weld joint records where the root pass (only) had been completed to determine ; weld / welder identifica-tion, qualified welder / weld procedure, physical appearance of weld and evidence of QC verification. The joints of paragraph (1)
above were examined.
(3) The inspector examined records of weld joints and weld joints of pipe / fitting (PPF) and pipe to component (PC) whe*e welding was beyond the root pass to determine; weld / welder identification, qualified welder / weld procedure, periodic checks of welding variables, use of specified weld material, proper interpass temperature and where applicable pre-heat and post-weld heat treatment and physical appearance of weld (e.g. starts, stops, undercut and surface imperfections). The weld joints of paragraph (1) abova were examined.
-
.
.
..
..
(4) The inspector examined the welds and records cf paragraph (1)
above where nondestructive testing (NDE) had been in progress to determine; surface suitability, specified,NDE being performed and with qualified personnel.
(5) The inspector observed activities at weld material issue stations to determine adequacy of; weld material storage / segregation, oven temperatures, issue records and return of unused weld material.
Also observed work areas for uncontrolled weld material.
Within the areas examined, there were no violations or deviations identi-fled.
7.
Safety Related Piping (Unit 1)
The inspector observed non welding work activities and reviewed records of non welding work activities for safety related (SR) piping. The applicable code for the installation of safety related piping is ASME B and PV Code Section III Subsections NC and ND, 1974 Edition with addenda through Summer 1974, a.
Observation of Work Activities
.
Observation of specific work activities and review of records of l
specific work activities where the window of opportunity had past were conducted to determine conformance, where applicable, with the fol-
,
lowing; inspection and/or work procedures, recordkeeping, installation I
specification or plans, specified materials, specified NDE, calibra-tion and use of proper test equipment and qualified inspection and NDE personnel.
Activity Procedure l
l Marking BPC-Specification No.
l 9645-M-204 Rev. 28 L
t Preservation BPC-Specification No.
l 9645-M-204 Rev. 28 Storage BPC-Specification-No.
9645-M-204 Rev. 28 Hydrotesting BPC-Specification No.
9645-M-204 Rev. 28 b.
Review of Quality Records The records review included,-where applicable, the following; installa-tion records (checklists, isometrics, NDE and inspection, hydrostatic testing, cleanliness, qualification of inspection personnel).
_ _ _ - _ _ _ _ _ _ _ - _
..
..
Spool No.
Size System QIE12G015-26G 18" Residual Heat Removal QIE12G015-35 4"
Residual Heat Removal QIE12G015-53A 3/4" Residual Heat Removal QIE21G001-05F 24" Low Pressure Core Spray QIE21G001-08G 16" Low Pressure Core Spray QIE21G001-09F 4"
Low Pressure Core Spray QIE21G001-13G 16" Low Pressure Core Spray-QIE22G001-07G 12" High' Pressure Core Spray QIE22G001-17G 14" High Pressure Core Spray QIE22G001-46A 10" High Pressure Core Spray Within the areas examined, there were violations or deviations identified.
8.
Safety Related Structures (Unit 1)
The inspectors observed welding activities and reviewed quality records for safety related structures and supports outside of containment.
a.
Observation of Work and Work Activities The inspector observed field welding activities by inspection of weld joints and review of records associated with safety related structures and supports outside containment during various stages of weld com-pletion.
Observations were made in order to determine whether the requirements of applicable specifications, standards, work and/or inspection procedures are being met for the activities involved and in the following stages of weld completion.
Actual observation of work was not possible as the window of opportunity had past.
(1) The inspector examined records of weld -joint fitup, prior to welding, to determine. whether weld identification / location, joint preparation and alignment and QC verification are in conformance with existing requirements. Welds on the following supports and structures were examined.
Identification Pipe Support No.
Structure / Support QIE12G014R04 Support QIE12G010R05 Support QIE12G013R07-Support QIE12G013R06 Support QIE12G012R13 Support
-
-
-
-
-
-
- -
-
-
..
Structural Steel Column No.
Q/6.2 Structure P4/6.2 Structure N/6.2 Structure L/6.2 Structure J/13.8 Structure H7/6.2 Structure (2) The inspector examined weld joint records for welding in progress to determine whether weld identification, weld procedures, welder qualification weld material, defect removal (if applicable),
specified NDE and periodic checks of welding variables are in conformance with existing requirements. The structures in para-graph (1) above were examined.
(3) Observation of weld material control included; identification, segregation, oven temperatures, issue slips and control of unused material at issue stations and work areas.
(4) Review of weld records indicated there was a sufficient number of qualified inspection personnel at the work site.
b.
Review of Quality Records (1) Records of completed welds in paragraph (1) above were reviewed in the areas of; visual dimensional inspections, weld history, preheat and interpass temperatures, stress relief, NDE, weld repair, welder qualification, inspector qualification, and weld material control as applicable to each weld.
(2) The inspector reviewed records of the following QA audits relative to welding of safety related structures and supports:
Audit Number Subject
'
i
'
" Fabrication Shop Activities" J-SC-03-02
" Activities of NDE Contractor
'
l (Peabody)"
h l
" Project QA Audit Report
'
Peabody Testing Company" l
QS-CL-1 10.1-3
" Erection of Structural Steel" QS-CL-1 10.1-4
" Erection of Structural Steel"
!
l i
h l
. -
-
-
-
-
-
- - -
- -
-
-
- -
-
-
- - -
c:
..
Audit Number Subject
~
[ Continued)
QS-CL-1 9.6-1
" Civil / Structural Welding Inspectioning QS-CL-1 9.6-2
" Civil / Structural Welding Inspectioning QS-CL-1 9.6-3
" Civil / Structural Welding Inspectioning QS-CL-1 9.6-4
" Civil / Structural Welding Inspectioning Audit number J-SC-03-02 was chosen for further investigation to deter-mine whether proper, timely and adequate corrective action was taken.
Within the areas examined, there were no violations or deviations identi-fied.
.-.
-- -
-
- -
--
1