IE Insp Repts 50-416/81-31 & 50-417/81-13 on 810727-0814. Noncompliance Noted:Failure to Follow Procedure Re Employee Training.Personnel Given Credit for Completion of GET Program W/Exam Grades Less than 75%
ML20032B545
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 09/02/1981
From: Cantrell F, Wagner A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20032B509 List:
References
50-416-81-31, 50-417-81-13, NUDOCS 8111050648
Download: ML20032B545 (6)


Text

.

.

.

.

UNITED STATES

o,,

NUCLEAR REGULATORY COMMISSION o

$

E REGION 11

&[

101 MARIETTA ST N.W.,ftUITE 3100 o,

ATLANTA, GEORGIA 303G3

Report Nos. 50-416/81-31 and 50-417/81-13 Licensee: flississippi Power-and Light Company Jackson, MS Facility Name: Grand Gulf Docket Nos. 50-416 and 50-417 License Nos. CPPR-118 and CPPR-119 Inspector:

O f~-

9 - 1-7 l o

A. G. Wagnere Date Signed Approved by:

(f. c la 9 - 1-9 I

.F.

S. Cantrell, Section Chief, Division of Date Signed

'

Resident and Reactor Project Inspection SUMMARY Inspection on July 27 - August 14, 1981 Areas Inspected This routine announced inspection involved 52 resident inspector-hours on site in the areas of Training, Follow-up of Inspection Findir.gs and Plant tour.

Resul ts Of the three areas inspected, no violatons or deviations were identified in two areas; one violation was found in one area (Failure to follow Procedure, paragraph 6.a.).

8111050648 811015 PDRADOCK05000g G

.

.

. -

.

-

. -.

]

.,

.

,

.

.

DETAILS 1.

Persons Contacted Licensee Employees

  • G. B. Rogers, Site flanager
  • C. K. McCoy, Plant flanager
  • C. R. Huthinson, Startup flanager
  • J. C. Bell, Quality Assurance Engineer
  • J. E. Custer, Training Superintendent G. H. Kee Training Supervisor E. E. Wilson, Electrical Superintendent R. G. Goebel, Training Instructor C. E. Guelley, Training Instructor E. F. Naruid, Maintenance Supervisor A. S. ficCurdy, Technical Superintendent
  • J. C. Roberts, Startup Supervisor
  • S. F. Tanner, Quality A<

.rance Coordinator D. L. Hunt, Plant Quality Superintendent J. R. Elms, Maintenance Superintendent G. A. Ellis, Security Supervisor R. R. Wenden, Radiation Control Supervisor

  • Attended exit interview 2.

Exit Interview The inspection scope and findings were summarized on August 14, 1981 with those persons indicated in Paragraph 1 above. Senior Licensee flanagement commented that corrective actions in regards to the violation (See paragraph 3) are inprogress.

The supervisors of the personnel that attended the training have been notified that those personnel are not to be allowed to perfom independent safety-related work until deficient training is correc ted.

Updated quality assurance training memos have been issued to all affected personnel.

These are to be completed prior to assigning these personnel to independent safety-related functions.

In regards to the violation in the area of general employee training (See paragraph 6.a) the l

'

procedures has been revised and the plant luality supervisor and the field QA coordinator have attended the training cad have provided comments to the QA instructors.

An exit meeting was held in the flississippi Power and Light Company Corporate offices in Jackson on July 25, 1981.

This meeting was held with N. L. Stampley, Senior Vice President, and members of his staff.

The

meeting was attended by J. P. O'Reilly, Director, Region II, members of his staff, and the Senior Resident Inspector. The meeting was held to discuss the tour of the Grand Gulf Nuclear Station and review of the staff organi-zation by Region II Director and his staff.

!

l l

. - - -

-

- -

_ _ _ - - -

_ _. - - - - -. - - _ _

,

t

-

.

.

3.

Licensee Action on Previous Inspection Findings (Closed) Unresolved Item 417/80-14-01 The inspector reviewed the open item file system established to document identified problems. The file is mcintained and updated at the Mississippi Power and Light Company Corporate office.

(0 pen) Violation 416/81-22-02 The inspector reviewed the corrective actions described in itississippi Power and Light Company letter AEU' 81/280 of August 4,1981.

The inspector had attended une of the intensified QA indoctrination training session that was held after the violation was identified.

This training session was conducted by a member of the plant quality assurance staff. This session lasted for approximately two and one-half hours.

It covered in some detail the basis for quality assurance requirements and the Mississippi Power and

-

Light Company policy and implementing procedures.

On August 4, 1981 a General Enployee Training (G.E.T.) course was reviewed for the. incorporation of the QA indoctrination training. The QA session lasted Approximately thirty-five minutes. A considerable amount of the material presented during the intensified QA indoctrination session had been deleted.

The inspector interviewed two attendees of the August 4,1981 G.E.T. course.

One of the individuals had attended both the QA indoctrination training and the QA course.

The other individual had attended only the G.E.T. course.

The individual attending G.E.T. only, was not aware of the QA procedure for hold points, witness points, material deficiencies or procedural problems.

But the individual stated that he would bring any deficiencies or problems to the attention of his supervisor. The former individual was aware of proper QA procedures to be followed except for escalated safety-related concerns to be handled in accordance with company policy. Based upon the above inspection findings it appears that the corrective actions relating to QA indoctrination training as described in !!ississippi Power and Light Company letter AECM 81/280 have not been adequately implemented.

The memorandum from the Plant ihnager concerning the utilization of personnel trained in QA for safety-related work and maintenance of a list of personnel with their QA indoctrination status was reviewed. An audit of six Grand Gulf fluclear Station section supervisions revealed that two super-visors did not maintain personnel and QA indoctrination lists as described in Mississippi Power and Light Company letter AE0181/280. The two supervisors do maintain a list of qualified personnel in these section but does not cover status of all personnel.

This violation remains open.

4.

Unresolved Items Unresolved items were not identified during this inspectio '

.

s

.

.

.

5.

Correction of Inspection Followup Item Reporting The corrective actions reported in inspection report 416/81-22 for open Items 416/80-21-05 and 416/80-21-06 were incorrect. The following corrective action were taken to close the above open -items. The approved Standby Service Water (SSW) Preoperational Test was reviewed. The requirements for verification of corrected SSW pump lead calculations at noted flow conditions were incorporated into the body of the procedure and acceptance criteria section.

Items 416/80-21-05 and 416/80-21-06 are closed.

6.

General Employee Training A General Employee Training session was attended on August 4,1981. The session was reviewed for confonnance with the requirements of Administrative Procedure 01-S-04-4 Revision 0, General Employee Training Program.

Portions of the lesso i plan were reviewed and compared to the lecture to ensure all topics were covered.

The training records of two individuals' attending this session were reviewed to verify implementation of the initial training program. Both of the individuals were then interviewed to verify that the training records reflected the actual training received. As a result of the above inspections, the following discrepancies were noted:

a.

The general radiation safety section did not contain a discussion of the following topics, decontamination of personnel and equipment, emergency actions relating to radiation accidents and housekeeping.

These topics are required to be discussed by Adminstrative Procedure-(AP) 01-S-04-4 paragraph 6.7.4.

It was also noted that a passing grade of 70% was allowed for the completion of the general employee training program.

A.P. 01-S-04-04 paragraph 6.9 states that a grade of 75% is the minimum acceptable passing grade.

The above examples of failure to follow procedures is a violation.of 10 CFR 50, Appendix B, Criterion V and was identified, to the licensee as item numbers 50-416/81-31-01.

b.

The following tor'es were not covered in their entirety or in the inspectors opinion were not accuratel; discussed.

1.

Assesses requirements for plant areas o n. side of the power block complex 2.

The handling of inspection requests by the flRC which come from plant personnel.

3.

The use of escalated enforcement actions by the fiRC in regards to individual plant staff members.

These items were discussed with senier licensee management.

It is the inspectors understanding that the.,e items will be reviewed and appropriate

,

.,.

.

.

.

4 i

corrective actions taken. These corrective actions.will be reviewed by the -

inspector during a substquent inspection. This is open item 416/81-31-02.

7.

TMI Action Plan Requirements-A review was conducted of the TMI Task Action Plan items listed on docket

.,

50-416 Open Oatstanding Items list.

!

a.

The-following item is completed: Task I.B.2.2 A Senior Resident Inspector is assigned and located at the site.

i b.

The following items are not applicable to boiling water reactor design plants and Grand Gulf.

)

1.

Task II.E.1.1 Auxiliary Feedwater System Evaluation 2.

Task II.E.1.2 Auxiliary Feedwater System Automatic Initiation and Flow Indication 3.

Task II.E.3.1 Reliability of Power ! pplies for Naturals Circulation 4.

Task II.G.1 Power Supplios for Pressurizer Relief Valves, Block Valves, and Level Indicators 5.

Task II.K.2 Commission Orders on Babcock and Wilcox plants.

c.

The following items are not applicable due to substantial completion of construction pragram.

1.

Task II.J.2.2 Increased Emphasis on Independent Measurement in Construction Inspection Program 2.

Task II.J.4,.1 Revised Deficiency Reporting Requirements (10 CFR 50.55e),

d.

The following item requires no action by the licensee task III.A.3.6.

Interaction of the NRC with ot! e Agencies.

8.

Inspector Follow-up Items (CloseJ) Open Item 416/80-21-08 The approved standby service water preoperational test was reviewed. The ASME section XI data requirements were supplied by plant staff engineering and incorporated into the procedure.

I i

(Closed) Open Iten 416/80-21-02 and 416/80-21-07 The approved standby service water preoperational test was reviewed. The requirements to verify flow to the fuel-pool heat exchanger and perfonn a flow balance were incorporated into the prerequisite section of the test.

l l

)

'

)

_.

_

_

_

.

.

.

.

.

..

5~

(Closed) Open Item 416/81-10-12 A test change. notice was reviewed.

It. incorporated the acceptance criteria requirements to verify satisfactory sparger operations and verify proper i

sampling.

[

9.

Licensee Identified Items (LII)'(Units 1 and 2)

'

Prior to this inspection, the licensee identified'the following items considered reportable under 10 CFR 50.55(e):

a.

(Closed) LII 417/80-13-08 Station Service Water (SSW) pumps ' picked up debris from SSW basins.

'

This iten was reported June 13,.1980. The final reports submitted March 6,1981 cdvises that pump suction strainers have now been installed, b.

(Closed) 416/30-23-03 and 417/80-14-08 Incorrect throttling valves for low pressure core spray and residual heat removal system. This item was reported on September 12, 1980.

The final report submitted June 15, 1981 indicates that throttle' valve

designs were reviewed and valve repairs were mtde where applicable.

'

Revisions have been made to purchase pecificat!ons for Unit 2 to prevent recurrence.

10. Plant Tour The inspector toured portions of the control building, auxiliary building

'

and containment. The tours were made at various times.. The inspector observed work and operations in progress in the areas toured.

Close attention was given to housekeeping and cleanliness of the areas.

No violations or deviations were identified.

>