{{#Wiki_filter:_- , .- ...
/ 'o UNITED STATES g !% NUCLEAR REGULATORY COMMISSION n
aE REGION 11
[[ ' 101 MAHlETT A ST., N.W.. SUIT E 3100 o, ATLANTA, GEORGIA 30303 Report Nos. 50-416/81-16 and 50-417/81-08 Licensee: Mississippi Power and Light Co.
Jackson, MS Facility Name: Grand Gulf 1 and 2 Docket Nos. 50-416 and 50-417 License Nos. CPPR-118 and CPPR-119 Inspection at Grand Gulf site near Port Gibson, Mississippi Inspect A h 7 - / Y~ f / A. B. Ruff Date Signed Approved by. m 7 - /V-8/ T. E. Conlon, Section Chief Date Signed Engine' ring Inspection Branch Engineering and Technical Inspection Division SUMMARY Inspection on June 16-19, 1981 Areas Inspected This routine, unannounced inspection involved 25 inspector-hours on site in the' areas of preventive maintenance on installed electrical motors; licensee identi-fied items; the observation of work, work activities and review of quality records associated with electrical components and system and electrical cables.
Results Of the areas inspected, no violations or deviations were identified.
8108040617 810716 ' ~ PDR ADOCK 05000416
PDR
, '. * ... REPORT DETAILS 1.
Persons Contacted Licensee Employees
- G. B. Rogers, Site Manager
- J. W. Yelverton, Field QA Supervisor
- B. C. Lee, QA Representative
- 0. Mahoney, QA Representative Bechtel Employees
- M. R. Lindsey, QA Supervisor
- W. H. Braun, Project QA Manager NRC Resident Inspector
- A. 3. Wagner 2.
Exit Interview The inspection scope and findings were summarized on June 19, 1981 with those persons indicated in Paragraph 1 above.
3.
Licensee Action on Previous In<pection Findings Not inspected.
4.
Unaesolved Items Unresolved items were not identified during this inspection.
i l 5.
Independent Inspection i i The inspector conducted a walk-through inspectior: of the auxiliary building.
The current status in the electrical areas of the construction was observed.
During this inspection the following electrical motors were examined in the area of preventive maintenance: , l MOV: Q1E32F003A and Q1E32F003N RWCU Pump Motor: Q1G33C001A and Q1G33C0018 l LPCS Pump Motor: Q1E21C001 HPCS l HPCS Pump Motor: Q1E22C001 l l It was noted that heat was applied for humidity control and oil levels, for l applicable motors, were satisfactory.
General Maintenance Task Cards l EL1320, 1119, 1031, 1032 were also reviewed. Within the areas examined, no violations or deviations were identified.
, ,
x .,. .
6.
Electrical (Components and Systems I and II) - Observation of Work, Work Activities and Re/iew of Quality Records The inspector selected the following electrical components for an examina-tion.
Air Start System for D. G.
"A" MOV: QSP41F1898 and Q1G33F0408 MOV: Q1P41F001A-A and Q1E12F0098 RHR Pump Motor: Q1E12C002A-A and QlE12C002C HPCS Pump Motor: Q1E22C0018-B SSW Pump Motor: Q1E12C002A-A Cont Vent Fan NIM 41C001A Inverter N1L62S181 AC Inst / Control Panel 1H13-P350 The work, work activities and quality records associated with receipt inspection and material certification, storage, handling, identification and installation were examined. Valve Installation Cards QSP41F189, Q1G33F040, Q1P41F001, and Q1E12F009, and Work Plan and Inspection Records (WP & IR) Q1E12C-07093-Y0A, Q1P75C-40122-Y0A, N1P75C-12133-Y0A, N175B12-133-Y08, N1L62-S-25A148-Y03, and NIN13P25148-Y01 were reviewed.
The qualification records for four Bechtel QC inspectors were reviewed.
Within the areas examined, no violations or deviations were ider.tified.
7.
Electrical (Cables and Terminations I) - Observation of Work and Work Activities The nondestructive test records for electrical cables 18B5506-1 and 1AB6505-1 were examined.
Within the areas examined, no violations or deviations were identified.
I 8.
Licensee Identified Items (LII) The inspector reviewed the status of LII with site personnel. The following i identifies the status of items examined.
l
a.
(0 pen) LII 416/81-16-01 - (MP&L POR# 80/73), Instrument Process Tubing, Slope Requirements. MP&L's Letter of April 4, 1981 identi-fies this item and indicates that another report is scheduled for August 1981.
( b.
(0 pen) LII 436/81-16-02 and 417/81-08-01 - (MP&L PDR# 81/14). Unquali- ! fied Material in ASCO Valves. MP&L's letter of March 26, 1981 identi-l fies this item and indicates that a final report is scheduled for ' September 1981.
l l ,
_ _ _ _ __.
. s , ', ..* , .,
c.
(0 pen) LII 416/81-16-03 and 417/81-08-02 - (MP&L PDR# 81/17), Flow Rate of ESF Electrical Switchgear Room Coolers. MP&L's letter of April 2, 1991 identifies this item and indicates that a final report is scheduled for September 1981.
d.
(0 pen) LII 416/81-16-04 and 417/81-08-03 - (MP&L PDR# 81/19), Mechan-ical Connections in GE Junction Boxes. MP&L's letter of April 3,1981 identifies this item and indicates that a final report is scheduled for August 1981.
e.
(0 pen) LII 416/81-16-05 - (MP&L PDR# 81/24), Damaged Reactor Mounting Channels.
MP&L's letter of May 18, 1981 identifies this item and ' indicates that a final report is scheduled for October 1981.
f.
(Closed) LII 416/80-23-03 and 417/80-14-03, These items are being tracked by 416/80-12-17 and 417/80-08-08 respectively.
( . }}