ML20032B528
| ML20032B528 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 09/02/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20032B509 | List: |
| References | |
| NUDOCS 8111050634 | |
| Download: ML20032B528 (2) | |
See also: IR 05000416/1981031
Text
- _ _ - _ _ _ _ .
_ _ _ _ _ _
_ _ _ _ _ _ _ _ _ .
_ _ _ _ _
_ _ _ _
._
_. .
__
__
-
__
_ _ _ _ _ - _
e
,
' . .
.g
,
2 1981
Mississippi Power and Light Company
ATTN: Mr. N. L. Stampley
Vice President of Production
'P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject: Report Nos. 616/81-3Dd50-417/81-13
This refers to the routine safety inspection conducted by Mr. A. G. Wagner of
this office on July 27 - August 14, 1981, of activities authorized by NRC
'
Construction Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility.
Our
preliminary findings were discussed with Mr. G. B. Rogers, Jr., Site Manager, at.
the cone'.usion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedure', and representative records, interviews with
personnel, and observations by the inspector.
.During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed i' the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR S 5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
-days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
,
that less than seven days are available for your review, please notify this
office promptly 'so that a new due date may be established.
Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
,
8111050634 811015
PDR ADOCK 05000416
G
-
-
--
- --
-
- -
-
-
- -
- -
- -
- -
-
i
.
.,
2 1981
'
-
Mississippi Pov:er & Light Company
2
specified periods noted above, the report will be plac2d in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
/?ce
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-416/81-31
and 50-417/81-13
cc w/ encl:
D. C. Gibbs, Vice President
Middle South Energy, Inc.
C. K. McCoy, Plant Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Mississippi
RII
RII
RII
RII '~E
Gef
&&
Gar
d
[".AWagner:dt /"FSCantrell
PTaylor
RClewis
8' 1 /81
E/ L/81
- / v/81
Rff181
/
f
i
1
q
.