ML20031E818
| ML20031E818 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 08/17/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML20031E811 | List: |
| References | |
| NUDOCS 8110160452 | |
| Download: ML20031E818 (2) | |
See also: IR 05000416/1981027
Text
-
_.
__
..
..
AUG 171981
Mississiopi Power and Light Company
ATTN:
Mr. N. L. Stampley
Vice President of Production
P. O. Box 1640
Jackson, MS 39205
Gentlemen:
Subject: Report Nos.@l6/81-[hd 50-417/81-11
This refers to the routine safety inspection conducted by Mr. W.
D. Kleinsorge
of this office on July 21-24, 1981, of activities authorized by NRC Construction
Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility. Our preliminary
findings were discussed with Mr. G. B. Rogers, Manager of Construction, at the
conclusion of the inspection.
Areas examined duriag the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
.
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
T(is item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewitS as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the rep' ort contains any information that you believe to be exempt from dis-
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten dTys from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor-
.
mation.
If your receipt of this letter has been delayed such that less " in
seven days are available for your review, please notify this office promptly a
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be witaheld,
and a full statement of the reasots on the basis of which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit. If we do not hear from
you in tnis ragard within the specified periods noted above, the report will be
placed in the Public Document Room.
MO!
-
i
. .
.
AUG 1 7 190I
Mississippi Power and Light Company
2
Should you have any questions concerning tiis letter, we will be glad to discuss
them with you.
Sincerely,
,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
i
i
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-416/81-27
'
and 50-417/81-11
'
cc w/ enc 1:
C. K. McCoy, Plant Manager
bcc w/ enc 1:
i
NRC Resident Inspector
Document Management Branch
State of Mississippi
i
,
f
RII
RII
30t
RI I
RII
p_
nsor
t
ARHerdt
hCEMurphy
AFGibson
~ C '. . . . = G
Lewis
~
/f//81
$/d/81
g/p/81
8/gW81
U"1
81
s. s
n
r
6g ,-o e