05000364/LER-1982-047, Corrected LER 82-047/03X-1:on 821124,determined FNP-2-STP-63.0 (Area Temp Monitoring) Not Performing Per Tech Specs.Caused by Personnel Error.Procedure FNP-2-STP-1.0 Revised.Area Temp Monitoring Completed

From kanterella
Jump to navigation Jump to search
Corrected LER 82-047/03X-1:on 821124,determined FNP-2-STP-63.0 (Area Temp Monitoring) Not Performing Per Tech Specs.Caused by Personnel Error.Procedure FNP-2-STP-1.0 Revised.Area Temp Monitoring Completed
ML20064F474
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/28/1982
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20064F452 List:
References
LER-82-047-03X, LER-82-47-3X, NUDOCS 8301060369
Download: ML20064F474 (1)


LER-2082-047, Corrected LER 82-047/03X-1:on 821124,determined FNP-2-STP-63.0 (Area Temp Monitoring) Not Performing Per Tech Specs.Caused by Personnel Error.Procedure FNP-2-STP-1.0 Revised.Area Temp Monitoring Completed
Event date:
Report date:
3642082047R00 - NRC Website

text

.

U.S. NUCLEAR REGULATCRY COMMISSION TRM 36,5

(

  • LICENSEE EVENT REPORT CONTROL BLOCK: l 1

l l l l l 6

lh (PLEASE PRINT CR TYPE ALL REQUIRED INFORMATI!N)

)

o i 8 9 lAlLlJlMlFl LICENSEE CODE 2 l@l14 0 l150 l - l 0 l 0 LICENSE l 0 l 0NUMBERl 0 l - l 0 l 0 l@l 25 4 l1LICENSE 26 l 1 l1TYPE l 1JOl@l57 CAT l 68 l@

CON'T o 1 5",R$ l l-)@l 0 l 5 l 0 l 0 l 0 l 3 l 6 l 4 l@l 1 l 1 l 2 l 4 l 8 l 2 74 l@l1 75 l 2REPORT l 2 lDATE 8 l 81280l@

7 8 60 61 DOCKET NUMBER 68 69 EVENT DATE EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h o 2 l At 2000 on 11-24-82, during survillance test review. it was determined that FNP l O 3 l STP-63.0 (Area Temperature Monitoring) had not been perfo:med within the reauired i 1 o 14 ] l Tech. Spec. time interval . Tech. Spec. 4.7.13 requires that the surveillance be oer- 1 I o l s i l formed daily. The surveillance had been last comoleted at 1812 on 11-22-82. Tech. l i o l6 l l Spec. 4.7.13 action statement requirements were met. Health / safety of the public was l l

l o l 7 ] l not affected.

I 10181 1

  • ' ' " ^"

CODE ##"de C0 S BC$DE COMPONENT CODE SU8C DE S E l0l9l8 7 9 l Al Al@ W@ J@ lZ lZ lZ lZ lZ l to 11 12 13

]@ [_Z_J@

18 19

[Z_J 20 SEQUENTIAL OCCUR RE NCE REPORT REVISION EVENT YEAR REPORT NO. CODE TYPE N O.

LE R

@ ,ag/RO l 8l 2l

,,,. 21 22

[ _j 23 l 0l 417l 24 26 M

27 10l3l 28 29 ljLJ 30

[--]

31

[1]

32 AK N AC N ON PL fT MET HOURS SB IT FOR 8. SUPPLIER MANUF CTURER l.G._J@l 33 34 z_J@ l_Z.J@

3b LZ_j@ l0 l 0! 0101 LNj@

M 37 40 41

[lj@

42

(_Z.j @

43 lZl9l9l9l@

44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i o lThis event was attributed to personnel error. FNP-2-STP-1.0 (Operations Daily and l 3 i l Shift Surveillance Requirements), which schedules daily operations surveillance test- I

, , i has been revised to include the performance of FNP-2-STP-63.0. FNP-2-STP-63.0 l ng, l

, 3 l was satisfactorily completed at 2115 on 11-24-82. l I

i 4 I 80 7 8 9

$A S  % POWER OTHER STATUS DIS O RY DISCOVERY DESCRIPTION i s [G_J@ l 0l 0l 0l@l NA l W @l Surveillance Test Review l A TIVITY CO TENT RFLE ASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE 1 6

[Zj @ Q@l NA l l NA l PERSONNEL EXPOS ES NUMBER TYPE DESCRIPTION i 7 l0l0l0l@lZl@l NA l

PERSONNe't iN;UWiES NUMBE R DESCRIP TION l

7 i a 8 9 l0l0l0l@] 11 12 NA 80

'^c'""

wa ' "rS=P%'N @

i 9 [,Zj@l NA 8

l l

7 8 9 'o 8301060369 821229 pc m mW

' NR EEK MMMM S lllllllllllll; 7

2 o P 9 ISSUE @ DESCRIPTION l

to NA @ PDR l 68 69 80 5 l NAME oF PREPARER W. G. Hairston, III pgons: (205) 899-5156 {

__