05000348/LER-1982-053, Forwards LER 82-053/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-053/03L-0
ML20069H432
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/08/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20069H436 List:
References
NUDOCS 8210190609
Download: ML20069H432 (1)


LER-2082-053, Forwards LER 82-053/03L-0
Event date:
Report date:
3482082053R00 - NRC Website

text

.

+ .,

MeNing Ashkees

.. : }~

  • F '

Alabama Power Company

~ '

_ 600 North 18th Street Post Offica Box 2641 Birmingham, Alabama 35291

- Telephone 205 783-6081 F. L. Clayton, Jr.

tag;;;;;ga' Alabamalbwer the southe.in electrC nstern October 8,1982 O'

. 3C( T.

p cp o

Yb

Docket No. 348 90 c$ P 7-c d.-r 9 k,1 b

& g~

.. . ?;, .

U. S. Nuclear Regulatory Comission - -

Office of Inspection and Enforcement A Region II 101 Marietta. Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 82-053/03L-0 is forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9 to provide thirty (30) days written notifi-cation of the occurrence.

If you have any questions, please advise.

Yours very truly, y n, J .

FLCJr/KWM:nac Enclosures xc: Director, IE (30 copies)

Director, MIPC (3 copies)

I

,C OYflg 8210190609 821008 PDR ADOCK 05000348 S PDR - ,_