LER 89-S02-00:on 890619,determined That Situation Existed That Could Have Allowed Unauthorized or Undetected Entry Into Svc Water Intake Structure.No Barrier Existed on Either End of Line to Prevent Access.Security Posted
ML20246P822
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/12/1989
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-89-S02, LER-89-S2, NUDOCS 8907200328
Download: ML20246P822 (4)


Text

4 Allbama Power Company 9

a40 inverness Center Parkway Post Office Box 1295

  • Birmingham Alabama 35201 Telephone 205 668-5581 W. G. Hairsion,111 Senior Vice President Nuclear Operations AlabamaPower the southern ehctnc syc; tem 10CFR50.73 July 12, 1989 Docket No. 50-348 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Vashington, D.C. 20555 Dear Sir Joseph H. Farley Nuclear Plant - Unit 1 Licensee Event Report No. LER 89-S02-00 Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 89-S02-00 is being submitted in accordance with 10CFR50.73.

If you have any questions, please advise.

Respectfully submitted, iha V. G. Hairston, III VGH,III/ JAR:sle 8.10 Enclosure cct Mr. S. D. Ebneter Mr. G. F. Maxwell l

l l flE0032809073y n S ADOCK 0500034g PNV E6b2 l

lll

a N C Form 356 U $. NUfiEAR AEGULATORY COMMI58105a

, APP %OVED OM61 NO 31M 0104 EXr' IRES 8'31/M LICENSEE EVENT REPORT (LER)

Ps.CILITY NAME k1) DOCKET NUMBE R (21 PAG 6i3)

Jm eph M. Farley - Unit 1 o 15 l 0 t o l 0 [3 l4 @ 1 lorl0 l3

" ' " " ' 10CFR73.71 Report: The Service Vater Intake Structure Vas Vulnerable To Undetected Or Unauthorized Entry E VENT DATE (El LER NUMBER 16) REPORT DATE (71 OTHE R F ACILITIES INVOLVED 'Bl 8 ACILITV N AMES DOCKE T NUMBER;8)

MONTH DAY YEAR YEAR UU L* ' ((j MONTH DAY YEAR J. H. Farley - Unit 2 0 1510 10101 3 l 614

~

nk 1b R9 R l9 S l0 l2 0l0 0l7 1l2 8 l9 015101010tiI THIS REPORT t$ SUBMITTED PUR$UANT TO THE R40VIREMENTS OF 10 CFfi $ (Ch.rA on or mor, of ra, followmat 011 OPE R ATING

" '* 1 20 m2w to esw som(2H.i x 73n w R 20.4051eH110) 50.36(eH1) 60.731sH2ftvl 73.71(c)

ODI 1 1010 20 enwmm .0.3.<eH2, .0.73i.ii2it.iii

_ gHEgso.<;,rggA,3,,7c, 20.406teH114tH 50.73's H2 Hi) 60 73teH2HwillH Al 365A1 20 40Biei(1Havl 60.73teH2 Hill 60.73(ei(2Hvil6HS!

20.4051sH1 Hv) 60.73(e H2Hild 60.73teH2Hal LICENEEE CONT ACT FOR TH18 LER (12)

NAME TELEPHONE NUMBER ARE A CODE D. N. Morey, General Manager-Nuclear Plant 2 ,0,5 8,9,9,-p,1,5,6 COMPLETE ONE LINE FOR E ACH COMPONENT F AILURE DESCRI8ED IN THl$ REPQft? (13)

CAUSE SY6?tM COMPONENT AC CAUSE S Y STE M COMPONENT M RF ORTAB E UTER O 'NPR 5 F[C I l l l l l 1 I I I I I i i i l I l l l l I l l I l I l

$ SUPPLEMENTAL REPORT EXPECTED 1141 MONTH DAY YEAR SUBMIS$10N YES (19 v.s comper. EXPECTED SUBMISSION DA TEI NO l l l 1.ss,R ACY av-a ro o a ,o.c.o . . ,,,... w,1.<r..., ,-a.. ua. ,vo..r,, ., im.,> 0si At 1335 on 6-19-89, it was determined that situation existed that could have allowed unauthorized or undetected entry into the Service Water Intake Structure j (SVIS). This report is being submitted in accordance with 10CFR73.71. ,

l On 6-19-89, a self-initiated safety system assessment of the service water system was being conducted. During this assessment, questions were raised concerning the routing of a 24-inch drain line from the service water equipment '

drain sump. This line goes from the SVIS to a discharge area approximately 900 feet outside the SVIS protected area fence. The discharge end of the drain line

vas covered with water and dirt and the end of the drain line was not visible.

1 l An investigation by the plant staff revealed that no barrier existed on either end of the line to prevent access. The size of this drain line exceeds the 96 square inch limit for an unprotected opening. Thus, it was determined that unauthorized entry into the SVIS vas possible through this line.

A Security Force Member was immediately posted inside the SVIS and a thorough search was conducted of the structure. When the discharge end of the drain line was located, a Security Force Member was posted in that area also. Barriers were installed on both ends of the drain line to prevent unauthorized access.

These modifications were completed on 6-23-89. The SVIS has also been valked down to ensure that no similar conditions exist. No safety systems were affected or threatened. 1 l

I NRC erm 366

! g . ..

NRC Form 3 eta, U.S. NUCLEAR REIULATOGY COMMISSION

. LICENSEE EVENT REPORT (LER) TEXT CONTINUATION ceRoveo ous No. mo-om

  1. }l ,,a l,. EXPIRES: 8/31/88 FACILITY NAME (1) DOCKET NUMBER Q) . LtR NUMBER 16) PAGE (3)

YEAR .- *EN'[g[, I s.y ju*,'OI Farlev Nuclear Plant - Unit 1 0 l5 l0 l0 l0 l 3 l4 l g g lg -

g l'nl g -

nl n nlh OF g lq TE::T IN emne space a sequkut, see addioonniNMC Form 306ks)(1n Date and Time of' Event' 4 1335 on 6-19-89.

Location of Event-FNP Service Water Intake Structure (shared between Units 1 and 2).

-Operating Phase At the' time of this event, both Units were operating at 100 percent power.

Safety Systems Affected or Threatened No safety systems were affected or threaten 2d.

Type of Security Force Onsite FNP has a proprietary security force.

Number and Type of Personnel Involved Several plant personnel were involved in the investigation of this event and implementation of compensatory measures.

Method of Discovery This was discovered during the perf rmance of a self-initiated safety system.

assessment of the service water r. Stem.

Procedural Errors Involved No procedural' errors were involved.

Immediate Actions Taken in Response to the Event A Security Force Member was immediately posted inside the SVIS and a thorough search was conducted of the structure. When the discharge end of the drain line was located, a Security Force Member was posted in that area also.

l Corrective Actions Taken or Planned j Barriers were installed on both ends of the drain line to prevent unauthorized access. These modifications were completed on 6-23-89. The SWIS has also been ,

valked down to ensure that no similar conditions exist.

, NRC PORM 308A *UJ CW WON % N C43) < ,

' 4.

=

NRC form 306A U.S. NUCLEAR REQULAToRY CoMfAIS3loN

-i. *' LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Aepnoveo ous No. 3 iso-oins

'd.. ,

,4 . - i EXPIRES: 8/31/88 FACILITY NAME (1) DOCKET NUMBER (26 LER NUMBER (6) ' PAG 8 (3)

YEAR  :: M y d ',  :: "[j[a' mN i 1

Farley Nuclear' Plant - Unit 1 o l5 l 0 l 0 l 0 l 31418 819 -

Sl d 2 -

01 0 oll OF g j'q TEXT (Mmore space a mquwed, use eeditenelNMC Fem 386A's!(17)

Local, State, or Federal Law Enforcement Agencies Contacted None.

Description of Media Interest or Press Release None.

Indication of Previous Similar Events None.

Knowledgeable Contact Larry V. Enfinger, Administrative Manager, (205) 899-5156 Extension 2221.