ML20064F449

From kanterella
Jump to navigation Jump to search
Forwards Corrected LERs 82-047/03X-1 & 82-049/03L-0
ML20064F449
Person / Time
Site: Farley 
Issue date: 12/29/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20064F452 List:
References
NUDOCS 8301060358
Download: ML20064F449 (1)


Text

,

Malling Addre:s Alabama Powsr Company 600 North 18th Street Post Office Box 2641

  • irrt ingham. Alabama 35291 ielephone 205 783-6081 F. L. Clayton, Jr.

b R"lo;;;g;gy"'

Alabama Power the Southern EkCtrC System December 29, 1982 u

Docket No. 364 f;-

CORRECTED COPIES w

U. S. Nuclear Regulatory Commission 2

Office of Inspection and Enforcement o

Region II W

101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Report No. LER 82-047/03X-1 is forwarded herewith. LER 82-047/ 03L-0 was forwarded on 12-23-82 with a typographical error in the last sentence under " Event Description and Probable Consequences", i.e. omission of the word "not".

Also on 12-23-82, LER 82-049/03L-0 was submitted without a report date.

The corrected copies are attached hereto.

If you have any questions, please advise, l

Yours very truly, l

bf'btcd<Oc l

F.

layton Jr.

6 l

FLCJr/KWM:nac Enclosures xc: Director, IE (30 copies) l Director, MIPC (3 copies) l UFMICIAL COPY (C.;L N M

F301060358 821229 PDR ADOCK 05000364 S

PDR