05000266/LER-1982-026, Forwards LER 82-026/01T-0

From kanterella
Jump to navigation Jump to search
Forwards LER 82-026/01T-0
ML20071Q369
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 12/20/1982
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20071Q371 List:
References
NUDOCS 8212290322
Download: ML20071Q369 (1)


LER-2082-026, Forwards LER 82-026/01T-0
Event date:
Report date:
2662082026R00 - NRC Website

text

.

,A R W POWER COMPANY 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 December 20, 1982 Mr. J. G. Keppler, Regional Administrator Office of Inspection and Enforcement, Region III U. S. NUCLEAR REGULATORY COMMISSION 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

DOCKET NO. 50-266 LICENSEE EVENT REPORT NO. 82-026/0lT-0 POINT BEACH NUCLEAR PLANT, UNIT 1 Enclosed is Licensee Event Report No. 82-026/0lT-0 (a 14-day follow-up report) which provides a description of an event reportable in accordance with Technical Specification 15.6.9.2.A.9, " Performance of structures, systems, or components that requires remedial action or corrective measures to prevent operation in a manner less conservative thei that assumed in the accident analyses in the safety analysis report or Technical Specifications bases; or discovery during plant life of conditions not specifically considered in the safety analysis report or Technical Specifications that require remedial action or corrective measures to prevent the existance of development of an unsafe

< condition."

Very truly yours, bY c Assistant Vice President C. W. Fay l

. Enclosure

Copy to NRC Resident Inspector 8212290322 821220 PDR ADOCK 05000266 S PDR h

DEC 2 31982

__ _--