ML20059H939

From kanterella
Jump to navigation Jump to search
Forwards Amended Response to Notice of Violations Noted in Insp Repts 50-266/89-27 & 50-301/89-26.Corrective Action: Revised Procedures Will Not Be Issued Until After Unit 2 Refueling Outage.Other Changes Anticipated by 901231
ML20059H939
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/13/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-094, CON-NRC-90-94 VPNPD-90-401, NUDOCS 9009190109
Download: ML20059H939 (2)


Text

.

i

,8 p

i Wisconsin L

Electnc

.PCWER CUMPANY i

231 W Michigart RO Box 2046. Mhovkee WI 53201 (414)221 2345 VPNPD-90-401 10 CFR 2.201' NRC-90-094 September 13, 1990 U. S. NUCLEAR REGULATORY COMMISSION Document-Control Desk Mail Station P1-137 Washington, D.

C.

20555 Gentlemen:

DOCKETS 50-266 AND 50-301 AMENDED RESPONSE TO= NOTICE OF VIOLATION 50-266/89027 AND 50-301189026-POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 i

In our letter dated December 21, 1989, we provided afresponse to a Notice ofcViolation outlined in Inspection Reports-50-266/89027 and 50-301/89026 for Units 1 and.2 respectively.':In_that rasponse we noted a number of corrective actions'for which we l

identified a' September.1990 completion date. These-corrective-actions-included the. appointment by the Manager-Point Beach Nuclear Plant of an interdisciplinary-task. group to' review our policy and practices for procedure usage and; reviews including the application of temporary changesLto procedures.

Although this group was initially created to address the corrective actions for this particular violation, the scope of the group activities was subsequently expanded to include a.

broader examination of our procedure usage.

Due to this expanded i

i review,-we have been unable to complete the corrective: actions-discussed below within the-schedule we had' originally proposed.

H We have discussed these matters with the NRC Resident Inspector-and he is agreeable to the revised schedule noted:below:'

Corrective Action 1 l

The interdisciplinary task group has made considerable progress in the development and review of revisions-to'the Point Beach Nuclear Plant Administrative Procedures (PBNP's)-

which address temporary changes to procedures.

Revised ~

procedures will, however,'not be issued until after-the Unit 2 refueling ~ outage.

We anticipate a revision to PBNP 2.1.1,

" Classification, Review and Approval of Procedures"; an 9009190109 900913 PDR ADOCK 05000266 0

PDC

-ggf n-._

d t. a

\\

r y

^;

,4 sum /in) ofIllsivasin Eness Cognation

t

,, :s ;

ENRC Document Control' Desk-september;13, 1990 1

Page 2 I

' initial issue of'PBNP 2.1.3',

" Temporary Changes to-Procedures";and a revision of QP 3-3,

" Authorization of!

Changes,; Tests, and Experiments" by December. 31, 1990.

Training will
follow procedure issuancei

-j

' t Attachment II. Biennial-Rey', aw Process Thebiennialreviewcf1phoceduresfiscontrolledbyPBNP l

2.1.2,

" Periodical Procedure Review.": This-procedure will l

be'reviewef and revised'(if necessary)'to address'the.

)

~

potential veaknesses identified."inithe Inspection'Reporta-

'i This will be' accomplished by. December 31, 1990.

If you have any questions-regarding th'is amended response, please:

contact us.:

l Very truly yours, 0.Wf C.

.Fy Vi e President i

Nuclear Power L

Attachments

}

l Copies to NRC Regional A?ministrator,-Region 1III.

NRC Resident Inspector-1 j

l L

(

[

u.

d)

V'.

D