ML20006A341
| ML20006A341 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 01/16/1990 |
| From: | Gleason H WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19310C635 | List: |
| References | |
| NUDOCS 9001260143 | |
| Download: ML20006A341 (7) | |
Text
m- -.
q J:nuary-16, 1990
'U.S. Nuclear' Regulatory Commission
. Document Control Desk Washington, DC 20555 POINT BEACH NUCLEAR PLANT-EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIPs)
The following revised procedure is attached and should be inserted into your l
EP1P manual according to instructions provided. -Please-destroy the revision removed from your manual.
EPIP 9.2:-
" Radiological Dose Evaluation," Revision'16, dated 01-16-90.
The following forms are attached and should be inserted into your EPIP manual, (y
according to instructions provided. Please~ destroy the revisions removed-from i
your manual.
1.
EPIP-6.6c:
" Assembly Area Designation," dated 01-90.
(Insert behind EPIP 6.6.)
2.
EPIP-14:
" Event Notification Worksheet,". dated 01-90.
(Insert behind EPIP 2.2.)
l 3.
EPIP-23:
"Offsite Agency Emergency Call List," dated 01-90.
I (Insert behind Call List Tab.)
4.
EPIP-26:
"011 and Hazardous Material Spill Call List," dated 01-90.
(Insert behind Call List Tab.)
-j Also attached is a revised listing of the Table of Contents.and Table of EPIP' forms to be inserted in your manual.
Please destroy-the old revisions.
- I
/s/
. Gleason i
dms l
}
Attachments l
t 1
FOR INFORMATION ONLY 9001260143 90011e POR ADOCK 03000266
.F PDC
,~
l' q
4 I
01-16-90
,<~~
f
\\
EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS Revision
'Date 1.0 INITIAL RESPONSE, CLASSIFICATION AND IMMEDIATE ACTIONS
{
1.1 Plant Operations Manager Initial Response..
. 10 10-31-89 1.1.1 Plant Operations Manager - Radiological Release Evaluation..
1-10-31-89' 1.1.2 Plant Operations Manager - General Emergency - Protective Actions.
0 04-14-89 1.2 Event Classification 19
.04-28-88 1.3
. Emergency Event - Immediate Actions.
16
.09-15-89 2.0 OFFSITE NOTIFICATIONS 2.1 State & County Agency Notification 5
09-15-89; 2.2 NRC Notification li 04-28-88 3.0 PLANT AND COMPANY PERSONNEL NOTIFICATIONS 3.1 Emergency Event - Plant & Company Personnel l t Notification...........
=7-09-15-89 3.2 Paging System Operation........
10 07-29 '
3.3 Notification & Respons for Headquarters Support Personnel...............
11 02-03-88 i
3.4 Public Information - Notification & Immediate-Fesponse 8
09-15-89 4.0 EMERGENCY RESPONSE FACILITY ACTIVATION' 4.1 Technical Support Center Activation.
. 14.
10-31-89 4.2 Operations Support Center-Activation and Operation..................... 4 10-31-89 4.3 Emergency Operations Facility Activation 9
10-31-89 5.0 EXPOSURE GUIDELINES AND RADI0 IODINE BLOCKING c
l l
5.1
. Personnel Exposure Guidelines.
5-02-03-88 5.2 Radioiodine Blocking & Thyroid Erposure-l Accounting 4
02-03-88 l
i s
l I
b
- e-Pag 2 2 of 4 Revision Date
}
!.N 6.0 EVACUATION AND ACCOUNTABILITY l-6.1 Limited Plant Evacuation 6
10-31-89 6.2 Plant Evacuation To Onsite Assembly Areas...
10 10-31-89 6.3 Plant &. Exclusion Area Evacuation To Offsite 7
09-15-89 Assembly Areas 6.4 EVACUATION OF EMERGENCY RESPONSE FACILITIES 6.4.3 Emergency. Operations Facility Evacuation. 4 09-15-89 6.4.4 Offsite Health Physics Facility (OSHPF)
Evacuation....
1 02-03-88 6.5 Energy Information Center Evacuation 5
02-03-88 6.6 Personnel Assembly & Accountability........ 9 02-03-88 6.7 Post-Emergency Release of Personnel from the Plant Site.
0 02-17-89 7.0 HEALTH PHYSICS RESPONSE 7.1 Health Physics Notification.and Response..
0 09-15-89 l
7.1.1
- Chemistry and Health Physics On-Site Notification and Response 10 (CANCELED)
Q (Contents moved to EPIP 7.1 & 8.1) 7.1.2 Chemistry and Health Physics offsite t
j Notification and Response 5
(CANCELED)
?
(Contents moved to EPIP 7.1 & 8.1) 7.1.3 Health Physics Actions by on-Shift HP Technologist Prior to Arrival of Additional Health Physics Support.
7 10-31-89 7.2 Health Physics Facility Activation 7.2.1 Activation of the Offsite Health Physics Facility at Site Boundary Control Center 10 10-31-89 7.2.2 Activation of. Health' Physics Facilities at Technical Support Center / Operations Support Center.......
10 10-31-89 7.2.4 Health Physics Communications 6
(CANCELED) s s
e v'
l m-me
-)
Page 3 of 4' Revision Date-p
[
,7 7.3 Radiological Survey, Sampling & Analysis
]
l l
l L
7.3.1 Airborne Sampling & Direct Dose-Rate Survey Guidelines
. 11 08-15-88 7.3.2 Post-Accident Sampling & Analysis'of
'Potentially High Level Reactor Coolant. 21
'(CANCELED)
(Renumbered to EPIP.8.4.1) j 7.3.3 Post-Accident Sampling of Containment.
Atmosphere.........-.....
20
'(CANCELED)
(Renumbered to EPIP 8.4.2)
- 7. 3.4 -
Movement of Required Chemistry Equipment &
~
Materials to the Technical Support Center.~
Counting Room & Mini-Laboratory..... 4
-(CANCELED)
(Renumbered to EPIP 8.3) 7.3.5 Post-Accident Sampling of the Auxiliary
[
Building & Drumming. Area Vent Stacks Using the Isokinetic Stack Sampling System.
4 02-03-88 l
7.3.6 Emergency Containment Sump "A" Sampling 0
(CANCELED)
(Renumbered to EPIP 8.4.3) l l
l 7.4 Emergency Equipment l
7.4.3.1 Use of Canberra Model 3100 Series 30' Multichannel Analyzer to Determine Airborne Iodine Activities.......
(CANCELED) tO' 8.0 CHEMISTRY RESPONSE I
8.1 Chemistry Notification and Response.
0 09-15-89 8.2 Activation of Chemistry Facilities at Technical Support Center / Operations Support Center..... 0 10-31-89 8.3 Movement of Chemistry Equipment & Materials to the Technical Support Center Counting Room &
Mini-Laboratory................. 0 09-15-89 I
l 8.4 Sampling & Analysis i
8.4.1 Post-Accident Sampling and Analysis of Potentially High Level Reactor Coolant.
'O 09-15-89' 8.4.2 Post-Accident Sampling of Containment s
Atmosphere.
1 11-13-89 8.4.3 Emergency Containment Sump "A" Sampling.. 0 09-15-89 8.4.4 Estimating Radioiodine Air Concentrations. 0 09-15-89 9.0 EVALUATION OF OFFSITE CONSEQUENCES 9.1 Emergency Off-Site Dose Estimations.
. 11 (CANCELED) 9.2 Radiological Dose Evaluation
. 16 01-16-90:
l 9.3 Protective Action Evaluation
. 13 02-03-88 O
i
+w-
.j a
Paga 4 of 4 s
Revision Date
' fh 10.0 DAMAGE ASSESSMENT 10.1 Emergency Reentry.................
9 02-17-89 10.2 Core Damage Estimation 9
02-03-88 11.0 SEARCH AND RESCUE & MEDICAL ASSISTANCE 11.1 Search & Rescue....
.............10 02-17-89 e
11.2 Injured Person's.Immediate Care..
5 02-03-88 11.3 Off-site Medical Assistance..
9~
10-31-89 12.0 RECOVERY PLANNING 12.1 Event Termination & Recovery Classification....
0 02-17-89 12.2 Recovery - Organization and Responsibility 3
02-17-89 EPIP APPENDIX A Appendix A, Emergency Plan - Abbreviations & Acronyms..
2 10-31-89 Appendix B, Radio Operation................
0 10-31-89:
^
Appendix C, Use of Emergency Plan Telephones.......
0 10-31-89 rs j
g
[
s_/
l-i r
?
l
\\
l /'~'T l
\\~ /
4 01-16-90 TABLE OF EPIP FORMS EPIP EPIP Forn Title
- Procedure
-04 Status Report on Plant Systems & Controls for Affected Unit (09-89) 4.1
-4.la Technical Support Center Activation Checklist (10-89) 4.1
-4.2a Operations Support Center Activation Checklist (10-89) 4.2
-4.2b Team Status (02-88) 4.2
-4.3a Emergency Operations Facility Activation Checklist (10-89) 4.3
-05 Release Point Monitors (09-89)
~4.1
-06 RMS Status, Area Type Monitors (09-89) 4.1
-6.6a Accountability Short Form (02-88) 6.6
-6.6b Assembly Area Roster (02-88) 6.6
-6.6c Assembly Area' Designations (01-90) 6.6 l
-6.7a Event Involvement Sununary (02-89) 6.7
-6.7b Emergency Event Information Sheet (02-89) 6.7
-6.7c Personnel " Dismissal-From-Site" Briefing Checklist (02-89) 6.7
-07 For X/Q Determination (03-85)
(CANCELED)
(now a worksheet in EPIP 9.2)
-07 RMS Status (Process Monitors) (09-89) 4.1
-7.la Health Physics' Emergency Plant Personnel Assignments (09-89) 7.1
-7.lb Emergency Plan Equipment Requiring Transport from the Health Physics Station (09-89) 7.1 -
-7.2.la Radiation Control Team Equipment Inventory & Functional Test Checklist (09-89) 7.2.1
-7.2.lb Offsite Sampling Team Equipment Inventory & Functional Test checklist (02-89) 7.2.1
-7.2.1c Shuttle Team Equipment Inventory & Functional Test-Checklist (12-88)..
-7.2.1d offsite Health Physics Facility, Offsite Health ~
7.2.1 Physics Director Checklist (09-89).
7.2.1
-7.2.le Emergency Plan Dosimetry Device Issue Record and Esposure Log (10-89) 7.2.1
-7.3.la Emergency Plan Airborne Radiation Survey Record (08-88) 7.3.1
-7.3.lb Emergency Plan Survey Record (08-88) 7.3.1
-7.3.lc Dose Factor Calculations For Specific Noble Gas Analysis Results (08-88) 7.3.1
-08 Estimated Whole Body & Thyroid Projected Doses (03-85)
'(CANCELED)
(now a worksheet in EPIP.9.2)
-8.4.la Reactor Coolant Post Accident Sampling 1
Analysis Report (09-89) 8.4.1
-8.4.2a Containment Atmosphere Post-Accident Sampling Analysis Report (09-89) 8.4.2
Page 2
+
[
EPIP EPIP G/
Fgr_m Title Procedure
-09 Estimated Whole Body Dose calculation Worksheet for Specific Noble Gas Releases (03-85)
(CANCELED)
(now a worksheet in EPIP 9.2)
-9.2a Estimated Population Dose (02-88) 9.2
-9.2b Summary of Radiological Dose Evaluation Calculations 9.2 (02-88) i
-10 Estimated Ground Deposition Calculation Worksheet for Particulate Radionuclide Releases (03-85)
(CANCELED)
(now a worksheet in EPIP 9.2)
-10.la Search & Rescue / Emergency. Reentry Checklist (02-89) 10.1 1
-10.lb Search & Rescue / Emergency Reentry Team Dispatch Checklist (02-89) 10.1
-11.la Search & Rescue / Emergency Reentry Checklist (02-89) 11.1
-11 lb Search & Rescue / Emergency Reentry Team Dispatch checklist (02-89) 11.1
-11.3a Checklist,.Off-site Medical Assistance (09-89)-
11.3
-11.3b Checklist Ambulance Assistance, Health Physics.
Response-(02-89) 11.3
- 11 ~. 3 c checklist NFAR - HP Response (09-89) 11.3
.. 0 12 Incident Report Form (04-89) 2.1 13 Status Update Form (02-89) 2.1
-14 NRC Event Notification Worksheet (01-90) 2.2
.l
-22 Plant Personnel Emergency Call List (11-89)
Call List Tab
-23 Offsite Agency Emergency Call List (01-90)
Call List Tab l
-24 Emergency Response Facility Telephone Directory (09-89)
Call' List Tab
-25 Wisconsin Electric Headquarters Support Personnel Emergency Call List {09-89)
Call List Tab j
-26 011 and Hazardous Material Spill Call List (01-90)
Call List Tab l
-30 Reactor Coolant Post Accident Sampling Analysis Report (02-89) (Renumbered to EPIP-8.4.la)
(CANCELED)
-31 Containment Atmosphere Post-Accident Sampling Analysis Report (02-89).(Renumbered to EPIP-8.4.2a)
(CANCELED)
-33 Estimate of Core Damage worksheet (08-87)
(CANCELED)
-34 Calculation of XE-133 Equivalent Release Rates (08-87)
(CANCELED)
-35 Dose calculations (09-85)
(CANCELED)
(
\\
t i
~.. -..
- - - - -