Forwards Rev 16 to EPIP 9.2, Radiological Dose Evaluation to Be Inserted in EPIP Manual
ML20006A341
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/16/1990
From: Gleason H
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19310C635 List:
References
NUDOCS 9001260143
Download: ML20006A341 (7)


Text

m- -.

q J:nuary-16, 1990

'U.S. Nuclear' Regulatory Commission

. Document Control Desk Washington, DC 20555 POINT BEACH NUCLEAR PLANT-EMERGENCY PLAN IMPLEMENTING PROCEDURES (EPIPs)

The following revised procedure is attached and should be inserted into your l

EP1P manual according to instructions provided. -Please-destroy the revision removed from your manual.

EPIP 9.2:-

" Radiological Dose Evaluation," Revision'16, dated 01-16-90.

The following forms are attached and should be inserted into your EPIP manual, (y

according to instructions provided. Please~ destroy the revisions removed-from i

your manual.

1.

EPIP-6.6c:

" Assembly Area Designation," dated 01-90.

(Insert behind EPIP 6.6.)

2.

EPIP-14:

" Event Notification Worksheet,". dated 01-90.

(Insert behind EPIP 2.2.)

l 3.

EPIP-23:

"Offsite Agency Emergency Call List," dated 01-90.

I (Insert behind Call List Tab.)

4.

EPIP-26:

"011 and Hazardous Material Spill Call List," dated 01-90.

(Insert behind Call List Tab.)

-j Also attached is a revised listing of the Table of Contents.and Table of EPIP' forms to be inserted in your manual.

Please destroy-the old revisions.

- I

/s/

. Gleason i

dms l

}

Attachments l

t 1

FOR INFORMATION ONLY 9001260143 90011e POR ADOCK 03000266

.F PDC

,~

l' q

4 I

01-16-90

,<~~

f

\\

EMERGENCY PLAN IMPLEMENTING PROCEDURES TABLE OF CONTENTS Revision

'Date 1.0 INITIAL RESPONSE, CLASSIFICATION AND IMMEDIATE ACTIONS

{

1.1 Plant Operations Manager Initial Response..

. 10 10-31-89 1.1.1 Plant Operations Manager - Radiological Release Evaluation..

1-10-31-89' 1.1.2 Plant Operations Manager - General Emergency - Protective Actions.

0 04-14-89 1.2 Event Classification 19

.04-28-88 1.3

. Emergency Event - Immediate Actions.

16

.09-15-89 2.0 OFFSITE NOTIFICATIONS 2.1 State & County Agency Notification 5

09-15-89; 2.2 NRC Notification li 04-28-88 3.0 PLANT AND COMPANY PERSONNEL NOTIFICATIONS 3.1 Emergency Event - Plant & Company Personnel l t Notification...........

=7-09-15-89 3.2 Paging System Operation........

10 07-29 '

3.3 Notification & Respons for Headquarters Support Personnel...............

11 02-03-88 i

3.4 Public Information - Notification & Immediate-Fesponse 8

09-15-89 4.0 EMERGENCY RESPONSE FACILITY ACTIVATION' 4.1 Technical Support Center Activation.

. 14.

10-31-89 4.2 Operations Support Center-Activation and Operation..................... 4 10-31-89 4.3 Emergency Operations Facility Activation 9

10-31-89 5.0 EXPOSURE GUIDELINES AND RADI0 IODINE BLOCKING c

l l

5.1

. Personnel Exposure Guidelines.

5-02-03-88 5.2 Radioiodine Blocking & Thyroid Erposure-l Accounting 4

02-03-88 l

i s

l I

b

- e-Pag 2 2 of 4 Revision Date

}

!.N 6.0 EVACUATION AND ACCOUNTABILITY l-6.1 Limited Plant Evacuation 6

10-31-89 6.2 Plant Evacuation To Onsite Assembly Areas...

10 10-31-89 6.3 Plant &. Exclusion Area Evacuation To Offsite 7

09-15-89 Assembly Areas 6.4 EVACUATION OF EMERGENCY RESPONSE FACILITIES 6.4.3 Emergency. Operations Facility Evacuation. 4 09-15-89 6.4.4 Offsite Health Physics Facility (OSHPF)

Evacuation....

1 02-03-88 6.5 Energy Information Center Evacuation 5

02-03-88 6.6 Personnel Assembly & Accountability........ 9 02-03-88 6.7 Post-Emergency Release of Personnel from the Plant Site.

0 02-17-89 7.0 HEALTH PHYSICS RESPONSE 7.1 Health Physics Notification.and Response..

0 09-15-89 l

7.1.1

Chemistry and Health Physics On-Site Notification and Response 10 (CANCELED)

Q (Contents moved to EPIP 7.1 & 8.1) 7.1.2 Chemistry and Health Physics offsite t

j Notification and Response 5

(CANCELED)

?

(Contents moved to EPIP 7.1 & 8.1) 7.1.3 Health Physics Actions by on-Shift HP Technologist Prior to Arrival of Additional Health Physics Support.

7 10-31-89 7.2 Health Physics Facility Activation 7.2.1 Activation of the Offsite Health Physics Facility at Site Boundary Control Center 10 10-31-89 7.2.2 Activation of. Health' Physics Facilities at Technical Support Center / Operations Support Center.......

10 10-31-89 7.2.4 Health Physics Communications 6

(CANCELED) s s

e v'

l m-me

-)

Page 3 of 4' Revision Date-p

[

,7 7.3 Radiological Survey, Sampling & Analysis

]

l l

l L

7.3.1 Airborne Sampling & Direct Dose-Rate Survey Guidelines

. 11 08-15-88 7.3.2 Post-Accident Sampling & Analysis'of

'Potentially High Level Reactor Coolant. 21

'(CANCELED)

(Renumbered to EPIP.8.4.1) j 7.3.3 Post-Accident Sampling of Containment.

Atmosphere.........-.....

20

'(CANCELED)

(Renumbered to EPIP 8.4.2)

7. 3.4 -

Movement of Required Chemistry Equipment &

~

Materials to the Technical Support Center.~

Counting Room & Mini-Laboratory..... 4

-(CANCELED)

(Renumbered to EPIP 8.3) 7.3.5 Post-Accident Sampling of the Auxiliary

[

Building & Drumming. Area Vent Stacks Using the Isokinetic Stack Sampling System.

4 02-03-88 l

7.3.6 Emergency Containment Sump "A" Sampling 0

(CANCELED)

(Renumbered to EPIP 8.4.3) l l

l 7.4 Emergency Equipment l

7.4.3.1 Use of Canberra Model 3100 Series 30' Multichannel Analyzer to Determine Airborne Iodine Activities.......

(CANCELED) tO' 8.0 CHEMISTRY RESPONSE I

8.1 Chemistry Notification and Response.

0 09-15-89 8.2 Activation of Chemistry Facilities at Technical Support Center / Operations Support Center..... 0 10-31-89 8.3 Movement of Chemistry Equipment & Materials to the Technical Support Center Counting Room &

Mini-Laboratory................. 0 09-15-89 I

l 8.4 Sampling & Analysis i

8.4.1 Post-Accident Sampling and Analysis of Potentially High Level Reactor Coolant.

'O 09-15-89' 8.4.2 Post-Accident Sampling of Containment s

Atmosphere.

1 11-13-89 8.4.3 Emergency Containment Sump "A" Sampling.. 0 09-15-89 8.4.4 Estimating Radioiodine Air Concentrations. 0 09-15-89 9.0 EVALUATION OF OFFSITE CONSEQUENCES 9.1 Emergency Off-Site Dose Estimations.

. 11 (CANCELED) 9.2 Radiological Dose Evaluation

. 16 01-16-90:

l 9.3 Protective Action Evaluation

. 13 02-03-88 O

i

+w-

.j a

Paga 4 of 4 s

Revision Date

' fh 10.0 DAMAGE ASSESSMENT 10.1 Emergency Reentry.................

9 02-17-89 10.2 Core Damage Estimation 9

02-03-88 11.0 SEARCH AND RESCUE & MEDICAL ASSISTANCE 11.1 Search & Rescue....

.............10 02-17-89 e

11.2 Injured Person's.Immediate Care..

5 02-03-88 11.3 Off-site Medical Assistance..

9~

10-31-89 12.0 RECOVERY PLANNING 12.1 Event Termination & Recovery Classification....

0 02-17-89 12.2 Recovery - Organization and Responsibility 3

02-17-89 EPIP APPENDIX A Appendix A, Emergency Plan - Abbreviations & Acronyms..

2 10-31-89 Appendix B, Radio Operation................

0 10-31-89:

^

Appendix C, Use of Emergency Plan Telephones.......

0 10-31-89 rs j

g

[

s_/

l-i r

?

l

\\

l /'~'T l

\\~ /

4 01-16-90 TABLE OF EPIP FORMS EPIP EPIP Forn Title

  • Procedure

-04 Status Report on Plant Systems & Controls for Affected Unit (09-89) 4.1

-4.la Technical Support Center Activation Checklist (10-89) 4.1

-4.2a Operations Support Center Activation Checklist (10-89) 4.2

-4.2b Team Status (02-88) 4.2

-4.3a Emergency Operations Facility Activation Checklist (10-89) 4.3

-05 Release Point Monitors (09-89)

~4.1

-06 RMS Status, Area Type Monitors (09-89) 4.1

-6.6a Accountability Short Form (02-88) 6.6

-6.6b Assembly Area Roster (02-88) 6.6

-6.6c Assembly Area' Designations (01-90) 6.6 l

-6.7a Event Involvement Sununary (02-89) 6.7

-6.7b Emergency Event Information Sheet (02-89) 6.7

-6.7c Personnel " Dismissal-From-Site" Briefing Checklist (02-89) 6.7

-07 For X/Q Determination (03-85)

(CANCELED)

(now a worksheet in EPIP 9.2)

-07 RMS Status (Process Monitors) (09-89) 4.1

-7.la Health Physics' Emergency Plant Personnel Assignments (09-89) 7.1

-7.lb Emergency Plan Equipment Requiring Transport from the Health Physics Station (09-89) 7.1 -

-7.2.la Radiation Control Team Equipment Inventory & Functional Test Checklist (09-89) 7.2.1

-7.2.lb Offsite Sampling Team Equipment Inventory & Functional Test checklist (02-89) 7.2.1

-7.2.1c Shuttle Team Equipment Inventory & Functional Test-Checklist (12-88)..

-7.2.1d offsite Health Physics Facility, Offsite Health ~

7.2.1 Physics Director Checklist (09-89).

7.2.1

-7.2.le Emergency Plan Dosimetry Device Issue Record and Esposure Log (10-89) 7.2.1

-7.3.la Emergency Plan Airborne Radiation Survey Record (08-88) 7.3.1

-7.3.lb Emergency Plan Survey Record (08-88) 7.3.1

-7.3.lc Dose Factor Calculations For Specific Noble Gas Analysis Results (08-88) 7.3.1

-08 Estimated Whole Body & Thyroid Projected Doses (03-85)

'(CANCELED)

(now a worksheet in EPIP.9.2)

-8.4.la Reactor Coolant Post Accident Sampling 1

Analysis Report (09-89) 8.4.1

-8.4.2a Containment Atmosphere Post-Accident Sampling Analysis Report (09-89) 8.4.2

Page 2

+

[

EPIP EPIP G/

Fgr_m Title Procedure

-09 Estimated Whole Body Dose calculation Worksheet for Specific Noble Gas Releases (03-85)

(CANCELED)

(now a worksheet in EPIP 9.2)

-9.2a Estimated Population Dose (02-88) 9.2

-9.2b Summary of Radiological Dose Evaluation Calculations 9.2 (02-88) i

-10 Estimated Ground Deposition Calculation Worksheet for Particulate Radionuclide Releases (03-85)

(CANCELED)

(now a worksheet in EPIP 9.2)

-10.la Search & Rescue / Emergency. Reentry Checklist (02-89) 10.1 1

-10.lb Search & Rescue / Emergency Reentry Team Dispatch Checklist (02-89) 10.1

-11.la Search & Rescue / Emergency Reentry Checklist (02-89) 11.1

-11 lb Search & Rescue / Emergency Reentry Team Dispatch checklist (02-89) 11.1

-11.3a Checklist,.Off-site Medical Assistance (09-89)-

11.3

-11.3b Checklist Ambulance Assistance, Health Physics.

Response-(02-89) 11.3

- 11 ~. 3 c checklist NFAR - HP Response (09-89) 11.3

.. 0 12 Incident Report Form (04-89) 2.1 13 Status Update Form (02-89) 2.1

-14 NRC Event Notification Worksheet (01-90) 2.2

.l

-22 Plant Personnel Emergency Call List (11-89)

Call List Tab

-23 Offsite Agency Emergency Call List (01-90)

Call List Tab l

-24 Emergency Response Facility Telephone Directory (09-89)

Call' List Tab

-25 Wisconsin Electric Headquarters Support Personnel Emergency Call List {09-89)

Call List Tab j

-26 011 and Hazardous Material Spill Call List (01-90)

Call List Tab l

-30 Reactor Coolant Post Accident Sampling Analysis Report (02-89) (Renumbered to EPIP-8.4.la)

(CANCELED)

-31 Containment Atmosphere Post-Accident Sampling Analysis Report (02-89).(Renumbered to EPIP-8.4.2a)

(CANCELED)

-33 Estimate of Core Damage worksheet (08-87)

(CANCELED)

-34 Calculation of XE-133 Equivalent Release Rates (08-87)

(CANCELED)

-35 Dose calculations (09-85)

(CANCELED)

(

\\

t i

~.. -..

- - - - -