'w y,
ft Wisconsin;
\\ Electnc
- POWER COMPANY.
[
231 W Michgort Po. Box 2046. Mdwoukee, WI 53201 (414)221 2345 VPNPD-9 0'- 30 6 -
NRC-90-063 June 22',
1990 Document Control Desk U.S. Nuclear: Regulatory Commission iMail Station P1-137
' Washington,.DC 20555 Gentlemen:
DOCKETS 50-266 AND 50-301 ENVIRONMENTAL OUALIFICATION PROGRAM FOR REGULATORY GUIDE-1.97 INSTRUMENTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 On'May 10, 1988, Gamma-Metrics issued a 10CFR Part 21 notification
' stating.that, due to manufacturing problems, leaks may exist in the solder joints of either the detector essembly cable. or the. in-e containment cable of their environmentally _ qualified Neutron Flux Monitor _- Systems.
This system is installed -in each unit at Point Beach.-
In a' letter to you~ dated February 17, 1989-(Ref..VPNPD _e were awaiting _the 089/NRC-89-020),_ 'we notified you-that w
-availability of qualified test procedures, hardware : fix kits, and-installation procedures from: Gamma-Metrics for our system.-
The confirmation-of the environmental qualification of our neutron flux monitors was being: delayed >until the first refueling outage for each 1
unit after Gamma-Metrics provided the qualified items:to us. 'At the o
time'the letter was. written, iti was believed that the qualified kits-would-be available< for our Fall.1989 refueling outage.
Gamma-Metrics has still not made these' items available to'us.
Hrvtever, due-to the.
" lengthy delay in receipt of these< items, we have decided to-proceed 1
with the leak testing of our systems during each' dnit's 1990 refueling outage.
~ During our Spring 1990 refueling: outage, a Gamma-Metrics field service representative pressure tested our Unit 1 neutron flux monitor system
-i cables.
'It was determined by the test that both the in-containment
[4
( cable and the -detector aesembly's cable had leaks.
Since repair kits were not'available, both of the defective components were replaced.
=si The final system'was again pressure tested and was found to exhibit no measurabin pressure drop over the 10 minute test period.-
As a result,.ths Unit i uystem han been certified to be environmentally
. qualified by Gamma-Metrics.. Testing of the Unit 2 system is scheduled
- f or. the Fall 1990 refueling outage at which time any defective components will be replaced.
The justification for continued E
k yR7 KM Ek?
A suMthydHinvasia EnessCmwaim k_
1-1
_.iNRC Document' Control DDsk'
. M+
Juni 22, 1990, Page 2-I operation provided with our:- August 9,
1988 letter- (Ref. VPliPD '
s 411/NRC-88-07 3 ) ~, which _ concludes that - we can continue to safely i
operate the Point Beach Nuclear Plant with this condition, is-still j
applicable'to Unit-2.
Very truly.yours,
.) )
C. W.
Fay.
.Vice President Nuclear Power
- SWO/a.lg Copy-.to
NRC Resident' Inspector NRC Regional Administrator, Regien.III i:
s s i
i i
I 4
-i
~i l
1 i
i r'
i i
l
'i,) ' -
t