| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-90-005, CON-NRC-90-5 IEB-89-003, IEB-89-3, VPNPD-90-028, VPNPD-90-28, NUDOCS 9001240086 | |
| Download: ML20005H055 (2) | |
Text
==-, ;-
~
7 S _lG*i@ ' '.
m:
i y?
y!Q e -
M g g(
ElectncL
- l b
~ POWER COMPANY.
V,
?
6 231 W Mehioon. Ro Ikm 2046. Mawoukee,WI 53201 -
(414)221-2345 5l
. l..
' VPNPD 02 8.
- NRC 005
U January.- 11,-'1990 e
y,>
p,
+.
1 nk Document.' Control Desk.
(
[U.SS.cNUCLEARl REGULATORY' COMMISSION-tMail: Station.P1-137
<--Washington,aDC"a20555 p:/ m F
Gentlemen:-
a..
p DOCKET-NOS. 50-266AND 50-301' RESPONSE TO.NRC. BULLETIN.89-03 t ;
LOSS OF. SHUTDOWN. MARGIN.DURING REFUELING f.
iPOINT BEACH NUCLEAR PLANT g
,u,
~-NRC.Bu11etin'89-03, " Potential Loss of Required Shutdown Margin JDuring4 Refueling Operations," requested all PWR licensees to assure
- that; adequate shutdown margin is maintained during all refueling p
-operations. : This: concern has become even more important with the 1recent widespread use of higher-enrichmentsfuel.
Utilities have been advised-to review the fuel shuffle ~ procedures that control the location 7ofLhighly reactive fuel assemblies-and be aware that the.
- refueling boron? concentration necessary~to maintain the required
.shultdown-margin 1when the fuel;isiin its-final core configuration may (notibel sufficient t_o assure required shutdown margin for all inter-mediate: fuel assembly: positions.
Wisconsin Electric, owner and operator of the Point Beach Nuclear Plant,Lhas-been, sensitive to the need to assure adequate shutdown
's margin when utilizing higher enrichment fuel.
Although we have not,
~
as"yet, utilized-fuel-with greater than 4.0 weight percent U235
< enrichment, the next-Point Beach Unit 1 reload will include fuel
~
eenriched to approximately 4.2 weight percent.
As directed by the iBulletin, fwe shall assure: that the intermediate fuel assembly Leonfigurations employed during the reload fuel shuffle at Point g
/
' Beach have'.been identified and evaluated to maintain sufficient
'l minimumishutdown margin for the refueling boron concentration.
+
' Detailed fuel movement' procedure will be established to control these intermediate fuel assembly configurations and verbatim compliance with these procedures will be emphasized and demanded.
9001240086 900111 PDR ADOCK 05000266 O
/r i
/l l
AsubsMim ofHisconsinDngrOxprathn h
g.,
o c,
n. *," <
,~
~e
' Document-Contro11 Desk r
1, zJanuary 11,11990.
,Page'2
'M, m,
E
-Asfreguested by the. Bulletin, we shall provide specific training to L
.all-staff members responsible:for refuel-ing-operation to emphasize
-the need andJin:portance of verbatim compliance with the fuel loading
' procedures.
This:Ltraining shall include the fundamental aspects of criticality control with higher enriched fuel assemblies, and include discussion ~of the' pot'ential consequences of violating these procedures. -This training shall be completed prior to shutdown'for the' Point 1 Beach. Unit.1 spring 1990 refueling which is; presently scheduled for March:30, 1990.
.g
-Very truly-yours, 3$/.
/
dW a C. W.
Fay-L;VicelPresident'
' Nuclear-Power Department s
Copies.to NRC Regional Administrator, Region III
.NRC ResidentnInspector
. Subscribed and swqrn to'before me this{lTO day of h m,;m,s,
1990.
O.
6 Notary.Public, State of7 Wisconsin 4
a My. Commission expires E-2 7-9 0
,