d Wisconsin l Electnc POWER COMPANY 231 W Mctugan, PQ Ebn 2046. Mawoukes. W 53201 (414)221-2345 VPNPD-9 0- 389 NRC 8 8 August 31, 1990 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1 *37 Washington, D.
C.
20555 Gentlement DOCKETS 50-266 AND 50-301 LONG-TERM EROSION / CORROSION-INDUCED PIPE WALL THINNING MONITORING PRq.Gl%M POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 On July 18, 1989, we responded to NRC Generic Letter 89-08, which required that licensees formalizo a program consisting of procedures and controls to ensure that erosion / corrosion does not lead to degradation of single-phase and two-phase high-energy carbon steel systems.
As explained in our response, Point Beach Nuclear Plant had implemented such a program at that time, but administrative controls which would provide long-term planning and basis documents were not yet in place.
In response to Generic Letter 89-08, an August 30, 1990 commitment date was made to put these measures in place.
Formal administrative controls and long-term plans are now finalized.
It is our conclusion that the program we now have in place at Point Beach Nuclear Plant will provide assurance that erosion / corrosion will not lead to degradation of single-phase and two-phase high-energy carbon steel systems.
If you have questions or require further information, please contact us.
Very truly
- ours,
/.
<hh C. W.
Fay Vice President Nuclear Power h
f, Copieg NRC Regional Administrator, Region III
\\p MFM Resident Inspector i
9009050406 900831 PDR ADOCK 05000266 P
PDC 3,gg,n guy,g g,,,y (p,,,