ML20055H662
| ML20055H662 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/23/1990 |
| From: | Fay C WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19298E333 | List: |
| References | |
| CON-NRC-90-073, CON-NRC-90-73 VPNPD-90-340, NUDOCS 9007270137 | |
| Download: ML20055H662 (3) | |
Text
--
'Electnc POWER COMPANY.
231 W M@ Po Ixm 2046. Mdwovkee, WI $3201, (414)221 2345 VPNPD-90-340, NRC-90-073
-July-23, 1990 m
U.
S.
NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington,=D.
C.
20555 Gentlemen:
DOCKETS 50-266 AND 50-301 EMERGEECX PLAN: IMPLEMENTING PROCEDURES _
j EQINT BEACH NUCLEAR PLANT, UNITS-1 AND 2 i
Enclosed is one copy of revised procedures and forms to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures-Manual.
The procedures and forms consist of changes which should be filed in your copy of the subject' document-in accordance with the attached instructions.
o-i Please note that the procedures containing-names and telephone _
i numbers are stamped "NRC ONLY, NOT:FOR PUBLIC DISCLOSURE".
A' copy of the affected forms with names and numbers deleted is provided and is stamped " NAMES AND TELEPHONE 1 NUMBERS' DELETED" to_
assure confidentiality.and; facilitate your distribution to the public documents room.
Very truly yours, q
U f
C. W.
- Fay, A
Vice' President j
i Nuclear Power
?
Enclosure
' Copies to NRC Resident Inspector-(without~ enc.)_
NRC Incident Response Center, Region III
/
m
%7 ki Pi F
o
.n--
u
J 1y-20,'1990-U.S. Nuclear Regulatory Commission Document Control Desk-Washington, DC--20555 POINT BEACH NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE 3 (EPIPs)
.The following revised procedures are attached and should be inserted into your.
EPIP manual according tc instructions provided. - Please destroy the revisions removed from your manual.
1.
EPIP 1.1.1:
" Plant' Operations Manager Radiological Release Evaluation, Revision 2, dated 07-20-90.
2.
EPIP 1.2:
" Event Classification," Revision 20, dated 07-20-90.
3.
EPIP 4.1:
" Technical Support' Center Activation," Revision.16, dated 07-20-90.
1 4.
EPIP 6.3:
" Plant and Exclusion Area Evacuation to Offsite Assembly' Areas,"
{
Revision 8, dated 07-20-90.
j S.
EPIP 6.5:
" Energy Information Center Evacuation," Revision 6,
{
dated 07-20-90.
i 6.
EPIP 7.3.2:
" Post-Accident Sampling of the Auxiliary Building-& Drumming i
Area Vent Stack Using the Isokinetic Stack. Sampling System,"
1 Revision 0, dated 07-20-90,'
7.
EPIP 10.2:
" Core Damage Estimation," Revision 10, dated 07-20-90.
8.
EPIP 11.3:
"Off-Site Medical Assistance," Revision 11, dated 07-20-90.
1 3
i l
i l
5 T
ib
Emergency Plan Imp 1;menting Pr c:dures
- Page 2 i
The following forms are attached and should be inserted into your EPIP manual according to instructions provided.
Please destroy the revisions removed from your manual.
1.
EPIP-04:
" Status Report on Plant Systems and Controls for Affected Unit" dated 07-90.
(Insert behind EPIP 4.1.)
2.
EPIP-4.la:
" Technical Support Center Activation Checklist," dated 07-90.
(Insert behind EPIP 4.1.)
3.
EPIP-6.6c:
" Assembly Area Designations," dated 07-90. -(Insert behind EPIP 6.6.)
4.
EPIP-22:
" Plant Personnel Emergency Call List," dated 07-90.
(Insert behind Call List Tab.)
5.
EPIP-23:
"Offsite Agency Emergency Call List," dated 07-90. -(Insert behind Call List Tab.)
6.
EPIP-24:
" Emergency Response Facil'ty Telephone Directory," dated 07-90.
(Insert behind Call List Tab.)
7.
EPIP-25:
" Wisconsin Electric lleadquarters Support Personnel Emergee.;y Call List," dated 07-90.
(Insert behind Call List Tab.)
8.
EPIP-26:
"011 and llazardous Material Spill Call List," dated 07-90.
(insert behind Call List Tab.)
Also attached is a revised listing of the Table of Contents and Table of EPIP Forms to be inserted in your manual.
Please destroy the old~ revisions.
/s/ 11. J. Gleason dms Attachments FOR INFORMATION ONLY