Advises of Typo in Item 2.C Re Emergency Diesel Generator Meter Accuracy in Submittal Re Corrective Actions in Response to Concerns Identified During Electrical Insp.Meter Calibr Reading Should Be 3,050 Kw Not 350 Kw
ML20043A992
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/16/1990
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-49 VPNPD-90-238, NUDOCS 9005240019
Download: ML20043A992 (1)


Text

Q y

W

- \\.e Wisconsin Elec'ac:

P0h: 1. )MPANY a

- 231 W Micr@ aron Box 2C46. Milwaukee, WI $3201 (414)221 2345 VPNPD-90-238

.NRC-90-49 May 16,--1990

i j

]

S

.1 ment Control Desk

t. S.' Nuclear Regulatory Commission I

I.tl Station Pl-137 h shington, D., C. 20555 Gentlemen:

DOCKET NOS.50-266 AND 50-301

-ELECTRICAL INSPECTION EXIT MEETING i

POINT BEACH NUCLEAR PLANT l

A The'attachme~nt to our May; 10,.1990 letter, identified the

-corrective actions taken or planned =inz response.to'the twenty-three items of' concern. identified by the NRC inspection.

team during:the electrical inspection-exit meeting; held on-Aprily 17, 1990.

Subsequent review of.this submittal identified r typographical error in' item 2'.C EDG Meter Inaccuracy.

_j The fourth sentence in item 2.C indicated that the EDG-load meter-was recalibrated to read accurately at.<350.kw.

The: calibration ~was j

actually performed for the meter to read' accurately at 3050skw.

]

'We regret any inconvenience this may.have: caused.

If4 you.have any-

{'

questions on this or any other. items'in'our,May;.10,l1990csubmittal, please contact us.

1 Very trul

yours, 4
d. W

~

1 C.

i. Fay h

f Viye President Nuclear Power l

Ig

d l

i 4s A

o q

y

' ',q

.. - Ae 4ktim ofHsuvasicEmgCoqxntha-1

~.

..,/

i

'U

_ _ : u--_

u ~_

..