Q y
W
- \\.e Wisconsin Elec'ac:
P0h: 1. )MPANY a
- 231 W Micr@ aron Box 2C46. Milwaukee, WI $3201 (414)221 2345 VPNPD-90-238
.NRC-90-49 May 16,--1990
- i j
]
S
.1 ment Control Desk
- t. S.' Nuclear Regulatory Commission I
I.tl Station Pl-137 h shington, D., C. 20555 Gentlemen:
DOCKET NOS.50-266 AND 50-301
-ELECTRICAL INSPECTION EXIT MEETING i
POINT BEACH NUCLEAR PLANT l
A The'attachme~nt to our May; 10,.1990 letter, identified the
-corrective actions taken or planned =inz response.to'the twenty-three items of' concern. identified by the NRC inspection.
team during:the electrical inspection-exit meeting; held on-Aprily 17, 1990.
Subsequent review of.this submittal identified r typographical error in' item 2'.C EDG Meter Inaccuracy.
_j The fourth sentence in item 2.C indicated that the EDG-load meter-was recalibrated to read accurately at.<350.kw.
The: calibration ~was j
actually performed for the meter to read' accurately at 3050skw.
]
'We regret any inconvenience this may.have: caused.
If4 you.have any-
- {'
questions on this or any other. items'in'our,May;.10,l1990csubmittal, please contact us.
1 Very trul
- yours, 4
- d. W
~
1 C.
- i. Fay h
f Viye President Nuclear Power l
Ig
- d l
i 4s A
o q
y
' ',q
.. - Ae 4ktim ofHsuvasicEmgCoqxntha-1
~.
..,/